[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1264257,851,1,"单选题","选择( )是施工方案中的关键问题,它直接影响施工质量、进度、安全以及工程成本,因此在编制施工组织设计时必须加以重视。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工方法和施工机械",true,{"key":16,"text":17,"correct":18},"B","施工工序和施工方法",false,{"key":20,"text":21,"correct":18},"C","施工工序和施工机械",{"key":23,"text":24,"correct":18},"D","施工程序和施工方法","",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]