[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264157":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1264157,851,1,"单选题","施工成本预测的实质是在施工项目的施工之前( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对成本因素进行分析",false,{"key":16,"text":17,"correct":18},"B","分析可能的影响程度",true,{"key":20,"text":21,"correct":14},"C","估算计划与实际成本之间的可能差异",{"key":23,"text":24,"correct":14},"D","对成本进行估算","",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]