[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264156":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1264156,851,1,"单选题","( )是以货币形式编制施工项目在计划期内的生产费用、成本水平、成本降低率以及为降低成本所采取的主要措施和规划的书面方案。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工成本预测",false,{"key":16,"text":17,"correct":18},"B","施工成本计划",true,{"key":20,"text":21,"correct":14},"C","施工成本控制",{"key":23,"text":24,"correct":14},"D","施工成本核算","",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]