[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264146":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1264146,851,1,"单选题","项目经理部对竣工工程成本核算的目的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","考核项目管理绩效",true,{"key":16,"text":17,"correct":18},"B","寻求进一步降低成本的途径",false,{"key":20,"text":21,"correct":18},"C","考核企业经营效益",{"key":23,"text":24,"correct":18},"D","分析成本偏差的原因","",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]