[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-176287":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},176287,85,3,"判断题","递延资产按实际发生值计算，与之有关的建设期间发生的利息和汇兑损失应计入递延资产价值。()",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"递延资产按实际发生值计算，与递延资产有关的建设期间发生的利息和汇兑损失应计入递延资产价值。",{"id":6,"name":21,"category":22,"favorite":23},"公司信贷","经济金融",0]