[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-176280":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},176280,85,3,"判断题","银行在进行财务效益评估前不必进行其他分析。()",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"项目的财务效益是项目建设、生产、经营及销售共同作用的结果，任何一方出现问题都将直接影响项目财务效益。因此在进行项目财务效益评估前，必须对项目建设规模、投资估算、产品方案、原辅料供应及保证情况、产品市场情况、生产工艺、物料单耗、水电供应、交通条件及项目承办单位能力方面先进行评估分析。",{"id":6,"name":21,"category":22,"favorite":23},"公司信贷","经济金融",0]