[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-175513":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},175513,85,2,"多选题","项目规模的主要制约因素包括()",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","国民经济发展规划、战略布局和有关政策",true,{"key":16,"text":17,"correct":14},"B","项目所处行业的技术经济特点",{"key":19,"text":20,"correct":14},"C","生产技术和设备、设施状况",{"key":22,"text":23,"correct":14},"D","资金和基本投入物",{"key":25,"text":26,"correct":14},"E","其他生产建设条件","ABCDE","项目规模的主要制约因素包括：国民经济发展规划、战略布局和有关政策；项目所处行业的技术经济特点；生产技术和设备、设施状况；资金和基本投入物；其他生产建设条件。",{"id":6,"name":30,"category":31,"favorite":32},"公司信贷","经济金融",0]