[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-175507":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},175507,85,2,"多选题","项目的可行性研究和贷款项目评估是相同的，它们的区别包括()",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","发起的主体不同",true,{"key":16,"text":17,"correct":14},"B","发起的时间不同",{"key":19,"text":20,"correct":14},"C","研究的范围和侧重点不同",{"key":22,"text":23,"correct":14},"D","进行项目评估和可行性研究的目的不同",{"key":25,"text":26,"correct":27},"E","涉及领域不同",false,"ABCD","项目的可行性研究和贷款项目评估的区别主要表现在以下几个方面：发起的主体不同；发生的时间不同；研究的范围与侧重点不同；进行项目评估和可行性研究的目的不同。但是就涉及领域而言，两者是相同的。",{"id":6,"name":31,"category":32,"favorite":33},"公司信贷","经济金融",0]