[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-175502":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},175502,85,2,"多选题","项目规模评估的效益成本评比法包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","盈亏平衡点比较法",true,{"key":16,"text":17,"correct":14},"B","净现值比较法",{"key":19,"text":20,"correct":21},"C","决策树分析法",false,{"key":23,"text":24,"correct":21},"D","数学规划",{"key":26,"text":27,"correct":14},"E","最低成本分析法","ABE","对拟建项目规模评估主要是对各种不同规模方案进行评选分析，其中，效益成本评比法包括：盈亏平衡点比较法、净现值比较法和最低成本分析法。决策树分析法和数学规划属于多因素评比法。",{"id":6,"name":31,"category":32,"favorite":33},"公司信贷","经济金融",0]