[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-175501":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},175501,85,2,"多选题","在对工业项目的环境保护方案进行分析时，应()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","审查环境影响报告",true,{"key":16,"text":17,"correct":14},"B","审查治理方案",{"key":19,"text":20,"correct":14},"C","审查建设总投资",{"key":22,"text":23,"correct":14},"D","审查建设总设计",{"key":25,"text":26,"correct":14},"E","分析环境保护的经济性","ABCDE","对工业项目而言，必须要进行环境保护方案分析。在对环境保护方案进行分析时应抓住以下几个环节：①审查环境影响报告；②审查治理方案；③审查建设总投资与总设计；④分析环境保护的经济性。",{"id":6,"name":30,"category":31,"favorite":32},"公司信贷","经济金融",0]