[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-175497":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},175497,85,2,"多选题","项目建设配套条件评估需要考虑的情况有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","厂址选择是否合理",true,{"key":16,"text":17,"correct":14},"B","原辅材料、燃料供应是否有保障",{"key":19,"text":20,"correct":14},"C","配套交通运输条件能否满足项目需要",{"key":22,"text":23,"correct":14},"D","相关及配套项目是否同步建设",{"key":25,"text":26,"correct":14},"E","环境影响报告书是否已经由权威部门批准","ABCDE","项目建设配套条件评估要考虑以下情况：①厂址选择是否合理，所需土地征用落实情况；②资源条件能否满足项目需要，原辅材料、燃料供应是否有保障，是否经济合理；③配套水、电、气、交通、运输条件能否满足项目需要；④相关及配套项目是否同步建设；⑤环保指标是否达到有关部门的要求，环境影响报告书是否已经由权威部门批准；⑥项目所需资金的落实情况。",{"id":6,"name":30,"category":31,"favorite":32},"公司信贷","经济金融",0]