[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-174967":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},174967,85,2,"多选题","在固定资产贷款贷前调查报告中，项目配套条件落实情况调查主要包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","厂址选择和土地征用的落实情况",true,{"key":16,"text":17,"correct":18},"B","是否符合国家产业政策、投资政策、行业规划和社会经济发展需要",false,{"key":20,"text":21,"correct":14},"C","资源条件和原材料、辅助材料、燃料供应的落实情况",{"key":23,"text":24,"correct":14},"D","配套水、电、气条件的落实情况",{"key":26,"text":27,"correct":18},"E","经济效益和社会效益评价","ACD","项目配套条件落实情况的内容主要包括：厂址选择和土地征用的落实情况；资源条件和原材料、辅助材料、燃料供应的落实情况；配套水、电、气条件的落实情况；运输条件的落实情况；环保指标是否达到有关部门的要求，环境影响报告书是否已经由相关部门批准。",{"id":6,"name":31,"category":32,"favorite":33},"公司信贷","经济金融",0]