[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-173335":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},173335,85,1,"单选题","()是指由拟建项目引起的，并与建设、生产、流通、耗费有联系的原材料、燃料、动力运输和环境保护等协作配套项目。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","同步建设",false,{"key":16,"text":17,"correct":18},"B","相关项目",true,{"key":20,"text":21,"correct":14},"C","外部协作配套条件",{"key":23,"text":24,"correct":14},"D","物力资源","相关项目是指由拟建项目引起的，并与建设、生产、流通、耗费有联系的原材料、燃料、动力运输和环境保护等协作配套项目。",{"id":6,"name":27,"category":28,"favorite":29},"公司信贷","经济金融",0]