[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":292},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,8,50,395,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1263918,3,"判断题","材料费的控制按照“量价分离”的原则,一是材料用量的控制;二是材料价格的控制。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1263919,"按生产费用计入成本的方法,工程项目成本的形式可划分为固定成本和变动成本。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1263920,"按成本的经济性质和国家规定,工程项目成本由直接成本和间接成本组成。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1263921,"教育费附加额为营业额的3%。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1263922,"建筑安装工程费中,间接费包括措施费和企业管理费。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1263923,"根据《质量管理体系》GB\u002F19001的规定,凡工程产品没有满足某个规定的要求,就称为质量缺陷。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1263924,"凡是工程质量不合格,必须进行返修、加固或报废处理,由此造成直接经济损失在规定限额以上的称为质量问题。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1263925,"凡是工程质量不合格,必须进行返修、加固或报废处理,由此造成直接经济损失低于规定限额的称为质量事故。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1263926,"事中控制首先是对质量活动的过程控制,其次是对质量活动的行为约束和结果的监督控制。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1263927,"施工质量控制应贯彻全面全过程质量管理的思想,运用静态控制原理,进行质量的事前控制、事中控制和事后控制。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1263928,"-次事故中死亡职工1～2人的事故称为重大伤亡事故。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1263929,"职业伤害事故是指因生产过程或与其相关的其他原因造成的伤亡事故。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1263930,"根据《企业职工伤亡事故分类》GB6441-1986,综合考虑事故的起因物、致癌物、伤害方式等特点,把危险源分为第一类危险源和第二类危险源。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":25,"analysis":27},1263931,"施工现场的噪声按来源可分为:交通噪声、工业噪声、机械噪声、社会生活噪声等。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1263932,"职业健康安全是指影响工作场所内员工、合同方人员健康安全的条件和因素。不包含临时工作人员、访问者和其他人员。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1263933,"异节奏流水施工可分为异步距异节拍流水施工和等步距异节拍流水施工两种。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1263934,"等节奏流水施工一般适用于工程规模较小,建筑结构比较简单,施工过程不多的房屋或某些构筑物。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1263935,"等节奏流水是指同一施工过程在各施工段上的流水节拍都相等,不同施工过程之间的流水节拍不一定相等的一种流水施工方式。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1263936,"根据流水施工节奏特征的不同,流水施工的基本方式分为等节奏流水和异节奏流水两大类。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1263937,"流水施工是指所有的施工过程按一定的时间间隔依次投入施工,各个施工过程陆续开工、陆续竣工,使同一施工过程的施工队保持连续、均衡施工,不同的施工过程尽可能平行搭接施工的组织形式。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1263938,"自由时差是指在不影响其紧后工作最迟开始时间前提下,本工作可以利用的机动时间。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1263939,"总时差是指在不影响总工期的前提下,本工作可以利用的机动时间。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1263940,"非关键线路都有若干机动时间（即时差）,它意味着工作完成日期容许适当挪动而不影响工期。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1263941,"双代号网计划中,只表示前后相邻工作之间的逻辑关系,既不占用时间,也不耗用资源的虚拟的工作称为虚工作。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1263942,"网络计划是指用网络图表达任务构成、工作顺序并加注工作时间参数的进度计划。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1263943,"编制施工进度计划,首先必须划分施工过程。对于控制性施工进度计划,其施工过程的划分可以粗一些,一般可按分部工程划分施工过程。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1263944,"施工进度计划是为实现项目设定的工期目标,对各项施工工程的施工顺序、起止时间和相互衔接关系所作的统筹策划和安排。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1263945,"先张法预应力筋的张拉程序常采用的方法有O→1.05σCom→持续2min→σCom或0→1.05σCom。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1263946,"模板的拆除程序一般是先支的先拆,先拆除非承重部分,后拆除承重部分。重大复杂模板的拆除,事先应制定拆模方案。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":21,"analysis":27},1263947,"模板系统包括:模板、支架和紧固件三部分。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1263948,"锤击法打桩时,当桩的规格、埋深、长度不同时,宜采用的打桩顺序为“先大后小、先深后浅、先短后长”。",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1263949,"钢筋混凝土预制桩的强度必须达到设计强度的70%方可运输。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1263950,"在集水井降水法中,沿坑底周围或中央需要开挖排水沟,一般排水沟的横断面不小于0.5m×0.5m,纵向坡度一般不小于3‰。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1263951,"土的最初可松性系数是土经压实后的体积与土在天然状态下的体积之比。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1263952,"施工进度计划可采用网络图或横道图表示,并附必要说明。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1263953,"砌体工程施工质量验收的基本要求中规定,在墙上留置临时施工洞口,其侧边离交接处墙画不应小于600mm,洞口净宽度不应超过1m。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1263954,"混凝土施工质量验收的要求规定混凝土强度达到1.2N／平方毫米前,不得在其上踩踏或安装模板及支架。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1263955,"模板分项工程施工质量验收要求,对现浇结构模板的检查数量,在同一检验批内,对梁、柱和独立基础,应抽查构件数量的10%,且不少于5件。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1263956,"基坑工程施工质量验收要求,基坑内明排水应设置排水沟及集水井,排水沟纵坡宜控制在1‰～2‰。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1263957,"房屋建筑工程保修期是从工程竣工之日起计算。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1263958,"在正常情况下,装修工程的最低保修期限为2年。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1263959,"建设工程质量检测是工程质量检测机构接受委托,依据国家有关法律、法规和工程建设强制性标准,对涉及结构安全项目的抽样检测和对进入施工现场的建筑材料、构配件的见证取样检测。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1263960,"采用非常规起重设备、方法,且单件起重量在150kN及以上的起重吊装工程属于超过一定规模的危险性较大的分部分项工程。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1263961,"搭设高度在8m及以上的混凝土模板支撑工程属于超过一定规模的危险性较大的分部分项工程。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1263962,"开挖深度超过3m（含3m）的基坑（槽）的土方开挖工程属于危险性较大的分部分项工程。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[293,297,300,303,306,309],{"id":294,"name":295,"category":7,"favorite":296},1,"领导干部任职前廉政法规知识测试题",92,{"id":298,"name":299,"category":7,"favorite":294},595,"建筑结构与设备",{"id":301,"name":302,"category":7,"favorite":294},715,"招标采购专业知识与法律法规",{"id":304,"name":305,"category":7,"favorite":294},848,"市政方向-通用基础",{"id":307,"name":308,"category":7,"favorite":8},534,"BIM工程师",{"id":310,"name":308,"category":7,"favorite":8},535]