[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,7,50,395,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1263868,3,"判断题","施工技术交底是对施工质量达到的质量标准和使用功能等要求加以说明。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1263869,"专项性文件是指就某项产品的特殊要求编制的专项文件,它是作为对通用性文件中一般规定的补充,属于这类文件的有质量方针政策、质量手册、程序文件和记录。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1263870,"通用性文件是指就某项产品的特殊要求编制的文件。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1263871,"施工质量控制点是指为了保证作业过程质量而确定的重点控制对象、关键部位或薄弱环节。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1263872,"质量控制文件主要用以表述保证和提高项目质量的文件,包括与项目质量有关的设计文件、工艺文件、研究试验文件等。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1263873,"规费是指政府和有关权力部门规定必须缴纳的费用。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1263874,"措施项目费用组成一般包括完成该措施项目的人工费、材料费、机械费、管理费、利润及一定的风险。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1263875,"综合单价是指完成工程量清单中一个规定计量单位项目所需的人工费、材料费、机械使用费、管理费和利润,不考虑风险因素。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1263876,"在工程结算时,零星工作项目费的工程量按承包人实际完成的工作量计算,单价按承包中标时的报价不变。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1263877,"措施项目费用包括施工技术措施项目费用和施工组织措施项目费用。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1263878,"措施项目费是指施工企业为完成工程项目施工,应发生于该工程施工前和施工过程中生产、生活、安全等方面的工程实体费用。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1263879,"组织流水施工的主要过程:划分施工过程→划分施工段→组织作业队,确定流水节拍→作业队连续作业→各作业队的工作适当搭接起来。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1263880,"流水步距是指两个相邻的作业队相继投入工作的最小间隔时间。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1263881,"流水节拍是指一个作业队在一个施工段上完成全部工作的时间。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1263882,"按最早时间绘制的时标网络计划,波形线的水平投影长度即为该工作的自由时差。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1263883,"按最早时间绘制的时标网络计划,每条箭线箭尾和箭头所对应的时标值应为该工作的最早开始时间和最早完成时间。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1263884,"考虑到屋面防水要求高,所以不分段,采用依次施工的方式,其中屋面找平层完成后需有一段养护和干燥的时间,方可进行防水层施工。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1263885,"对于混合结构多层房屋的流水施工,一般先考虑分部工程的流水,然后再考虑各分部工程之间的相互搭接施工,组成单位工程施工进度计划。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1263886,"均衡施工可以使各种资源的动态曲线尽可能不出现长时期高峰或低谷,因而可大大减少施工现场各种临时设施的规模,从而节省施工费用。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1263887,"工程项目资源是对项目中使用的人力资源、材料、机械设备、技术、资金和基础设施等的总称。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1263888,"施工进度计划的编制方法主要有横道图进度计划的编制方法和网络计划编制方法。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1263889,"施工进度计划是指在施工方案的基础上,根据规定工期和技术物质供应条件,遵循工程的施工顺序,用图表形式表示各分部分项工程搭接关系及工程开竣工时间的一种计划安排。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1263890,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种,其中整体顺序自下而上的施工顺序是指主体工程及屋面防水层完工后,室内抹灰从顶层往底层依次逐层向下进行。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1263891,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种,其中整体顺序自下而上的施工顺序是指主体结构施工到两层以上时,室内抹灰从底层开始逐层向上进行,一般与主体结构平行搭接施工。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1263892,"室外装修工程一般采用自下而上的施工顺序。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1263893,"屋面工程施工在一般情况下不划分流水段,它可以和装修工程搭接施工。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1263894,"柔性屋面的施工顺序按照找平层→保温层→柔性防水层→保护隔热层依次进行。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1263895,"基础工程施工阶段的施工顺序一般是:挖土方→垫层→基础→回填土。具体内容视工程设计而定。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1263896,"在实际工程施工中,施工顺序可以有多种。不仅不同类型建筑物的建造过程有着不同的施工顺序,在同一类型的建筑工程施工中,甚至同一栋房屋的施工,也会有不同的施工顺序。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1263897,"施工顺序是指工程开工后各单位工程施工的先后顺序。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1263898,"施工区段是指工程对象在组织流水施工中划分的施工区域,包括施工段和施工层。其中把建筑物垂直方向划分的施工区段称为施工段。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1263899,"划分施工段的目的,就在于保证不同的施工队组能在不同的施工区段上同时进行施工,消灭由于不同的施工队组不能同时在一个工作面上工作而产生的互等、停歇现象,为流水创造条件。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1263900,"一般把平面上划分的若干个劳动量大致相等的施工区段称为施工层。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1263901,"施工区段是指工程对象在组织流水施工中划分的施工区域,包括施工段和施工层。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1263902,"建筑工程的定位分为平面位置定位和标高定位。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1263903,"定位放线是建筑工程施工的依据。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1263904,"施工组织设计交底是由项目施工技术负责人向施工工地进行的交底。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":21,"analysis":27},1263905,"施工技术交底是某一单位工程开工前,或一个分项工程施工前进行的技术性交代,其目的是使施工人员对工程特点、技术质量要求、施工方法与措施和安全等方面有一个较详细的了解,以便于科学的组织施工,避免事故的发生。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1263906,"建筑工程施工图一般的编排顺序为首页图、总平面图、建筑施工图、结构施工图、给排水施工图、电气施工图、采暖通风施工图等。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1263907,"建筑工程施工图按专业分工不同可分为建筑施工图、结构施工图、设备施工图。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1263908,"模板拆除后应及时清理,模板堆放按规格尺寸分类放置,堆放高度应小于3m,挂标识,便于使用。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1263909,"梁的侧模板为不承重模板,一般当混凝土的强度等级达到设计强度的20%时即可拆除。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1263910,"土钉支护的适用范围:地下水位较低的黏土、砂土、粉土地基,基坑深度一般在20m以内。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1263911,"施工方案是从时间、空间、工艺、资源等方面确定施工顺序、施工方法、施工机械和技术组织措施等内容。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1263912,"专项施工方案是以单位工程或专项工程为主要对象编制的施工技术与组织方案,用以具体指导其施工过程。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1263913,"单位工程施工组织设计是以单位工程为主要对象编制的施工组织设计,对单位工程施工过程起指导和制约作用。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1263914,"塔式起重机具有较高的起重高度、工作幅度和起重能力,各种速度快、生产效率高,且机械运转安全可靠,使用和装拆方便等优点,因此,广泛地用于多层和高层的工业与民用建筑的结构安装。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1263915,"抓铲挖土机的适用范围是,挖掘一～三类土,挖掘河床,开挖较深较大的基坑、管沟等。",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1263916,"反铲挖土机的开挖方式为前进向上,强制切土。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1263917,"挖土机械按工作装置不同可分为机械式和液压式。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]