[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":700},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,6,50,395,[13,38,53,68,83,98,112,126,140,154,169,183,198,213,227,239,254,268,282,296,310,324,338,353,367,381,395,409,423,437,451,465,479,494,508,522,536,550,564,579,593,606,620,635,649,658,672,682,688,694],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1263818,2,"多选题","反铲挖掘机的挖土特点是:“后退向下,强制切土”。根据挖掘机的开挖路线与运输汽车的相对位置不同,一般有( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","沟端开挖法",true,{"key":24,"text":25,"correct":22},"B","沟侧开挖法",{"key":27,"text":28,"correct":29},"C","多层接力开挖法",false,{"key":31,"text":32,"correct":29},"D","多方位开挖法",{"key":34,"text":35,"correct":29},"E","沟底开挖法","AB","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1263819,"施工过程成本控制的措施包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"管理措施",{"key":24,"text":45,"correct":22},"技术措施",{"key":27,"text":47,"correct":22},"经济措施",{"key":31,"text":49,"correct":22},"合同措施",{"key":34,"text":51,"correct":22},"组织措施","BCDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1263820,"机械费用主要由台班数量和台班单价两方面决定,主要从( )方面控制台班费的有效支出。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"合理安排施工生产,加强设备租赁计划管理,减少因安排不当引起的设备闲置",{"key":24,"text":60,"correct":22},"加强机械设备的调度工作,尽量避免窝工,提高现场设备利用率",{"key":27,"text":62,"correct":22},"加强现场设备的维修保养,避免因不正当使用造成机械设备的停置",{"key":31,"text":64,"correct":22},"做好上机人员与辅助生产人员的协调与配合,提高机械台班产量",{"key":34,"text":66,"correct":29},"指定价格低廉的设备租赁单位,降低租赁费用","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1263821,"工程成本管理的特点包括( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"成本管理的全员性",{"key":24,"text":75,"correct":22},"成本管理的全面性",{"key":27,"text":77,"correct":22},"成本管理的目标性",{"key":31,"text":79,"correct":22},"成本管理的战略性",{"key":34,"text":81,"correct":22},"成本管理的系统性","ABCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1263822,"根据成本管理要求,工程项目成本的形式可划分为( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"承包成本",{"key":24,"text":90,"correct":29},"直接成本",{"key":27,"text":92,"correct":22},"计划成本",{"key":31,"text":94,"correct":29},"固定成本",{"key":34,"text":96,"correct":22},"实际成本","ACE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1263823,"建筑安装工程费中,直接费包括( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"直接工程费",{"key":24,"text":105,"correct":22},"措施费",{"key":27,"text":107,"correct":29},"企业管理费",{"key":31,"text":109,"correct":29},"间接工程费",{"key":34,"text":111,"correct":29},"规费",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":97,"analysis":37},1263824,"施工质量问题按问题责任分类可分为( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"指导责任",{"key":24,"text":119,"correct":29},"管理责任",{"key":27,"text":121,"correct":22},"操作责任",{"key":31,"text":123,"correct":29},"技术责任",{"key":34,"text":125,"correct":22},"自然灾害",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":52,"analysis":37},1263825,"施工质量控制的基本要求有( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":29},"以科学组织管理确保工程质量",{"key":24,"text":133,"correct":22},"严格控制投入品的质量",{"key":27,"text":135,"correct":22},"严防系统性因素的质量变异",{"key":31,"text":137,"correct":22},"严把分项工程质量检验评定关",{"key":34,"text":139,"correct":22},"贯彻“以预防为主”的方针",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":82,"analysis":37},1263826,"施工质量控制的原则有( )。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"坚持质量第一的原则",{"key":24,"text":147,"correct":22},"坚持以人为核心的原则",{"key":27,"text":149,"correct":22},"坚持以预防为主的原则",{"key":31,"text":151,"correct":22},"坚持质量标准的原则",{"key":34,"text":153,"correct":22},"坚持科学、公正、守法的道德原则",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},1263827,"施工质量控制应贯彻全面全过程质量管理的思想,运用动态控制原理,进行质量的( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"事前控制",{"key":24,"text":161,"correct":22},"事中控制",{"key":27,"text":163,"correct":22},"事后控制",{"key":31,"text":165,"correct":29},"全过程控制",{"key":34,"text":167,"correct":29},"监督控制","ABC",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":82,"analysis":37},1263828,"施工质量的影响因素有( )。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"环境控制",{"key":24,"text":176,"correct":22},"人的因素",{"key":27,"text":178,"correct":22},"材料的因素",{"key":31,"text":180,"correct":22},"方法的因素",{"key":34,"text":182,"correct":22},"设备的因素",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1263829,"建筑工程质量管理的特点有( )。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"影响质量的因素多",{"key":24,"text":190,"correct":22},"质量控制的难度大",{"key":27,"text":192,"correct":22},"终结检查的局限大",{"key":31,"text":194,"correct":29},"工作质量的不确定性",{"key":34,"text":196,"correct":22},"过程控制的要求高","ABCE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1263830,"在进行生产安全事故报告和调查处理时,必须坚持“四不放过”的原则,包括( )。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"事故原因不清楚不放过",{"key":24,"text":205,"correct":22},"事故责任者和员工没有受到教育不放过",{"key":27,"text":207,"correct":29},"事故单位未处理不放过",{"key":31,"text":209,"correct":22},"事故责任者没有处理不放过",{"key":34,"text":211,"correct":22},"没有制定防范措施不放过","ABDE",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":212,"analysis":37},1263831,"建筑工程施工安全事故按生产安全事故造成的人员伤亡或直接经济损失可分为( )。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"特别重大事故",{"key":24,"text":220,"correct":22},"重大事故",{"key":27,"text":222,"correct":29},"死亡事故",{"key":31,"text":224,"correct":22},"一般事故",{"key":34,"text":226,"correct":22},"较大事故",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":238,"analysis":37},1263832,"建筑工程施工安全事故按事故后果严重程度可分为( )。",[231,233,234,235,236],{"key":20,"text":232,"correct":22},"轻伤事故",{"key":24,"text":222,"correct":22},{"key":27,"text":220,"correct":29},{"key":31,"text":224,"correct":29},{"key":34,"text":237,"correct":22},"急性中毒事故","ABE",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},1263833,"第二类危险源是指造成约束、限制能量和危险物质措施失控的各种不安全因素,其主要体现在( )。",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"设备故障或缺陷",{"key":24,"text":246,"correct":29},"造成事故后果的严重程度",{"key":27,"text":248,"correct":22},"人为失误",{"key":31,"text":250,"correct":22},"管理缺陷",{"key":34,"text":252,"correct":22},"环境因素","ACDE",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":52,"analysis":37},1263834,"施工现场环境保护的相关规定有( )。",[258,260,262,264,266],{"key":20,"text":259,"correct":29},"控制污水排放",{"key":24,"text":261,"correct":22},"对施工现场防治扬尘、噪声、水污染及环境保护管理工作进行检查",{"key":27,"text":263,"correct":22},"定期对职工进行环保法规知识培训考核",{"key":31,"text":265,"correct":22},"建筑施工现场应建立环境保护体系,落实责任,保证有效运行",{"key":34,"text":267,"correct":22},"建筑工程施工组织设计中应有防治扬尘、噪声、固体废物和废水等污染环境的有效措施,并在施工作业中认真组织实施",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":97,"analysis":37},1263835,"文明施工是保持施工现场良好的( )。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"作业环境",{"key":24,"text":275,"correct":29},"工作环境",{"key":27,"text":277,"correct":22},"工作秩序",{"key":31,"text":279,"correct":29},"工作氛围",{"key":34,"text":281,"correct":22},"卫生环境",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":82,"analysis":37},1263836,"文明施工是保持施工现场良好的作业环境、卫生环境和工作秩序。主要包括( )。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"规范施工现场的场容,保持作业环境的整洁卫生",{"key":24,"text":289,"correct":22},"科学组织施工,使生产有序进行",{"key":27,"text":291,"correct":22},"减少施工对周围居民和环境的影响",{"key":31,"text":293,"correct":22},"遵守施工现场文明施工的规定和要求",{"key":34,"text":295,"correct":22},"保证职工的安全和身体健康",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":82,"analysis":37},1263837,"造成施工进度计划偏差的影响因素包括( )。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"设计的变更",{"key":24,"text":303,"correct":22},"工期及相关计划的失误",{"key":27,"text":305,"correct":22},"工程条件的变化",{"key":31,"text":307,"correct":22},"管理过程中的失误",{"key":34,"text":309,"correct":22},"实施方案的修改",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":197,"analysis":37},1263838,"确定流水步距的基本要求是( )。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"主要施工队组连续施工的需要",{"key":24,"text":317,"correct":22},"施工工艺的要求",{"key":27,"text":319,"correct":22},"最大限度搭接的要求",{"key":31,"text":321,"correct":29},"工期要求",{"key":34,"text":323,"correct":22},"要满足保证工程质量、安全生产、成品保护的需要",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":168,"analysis":37},1263839,"下列说法正确的是( )。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"总时差为最小的工作为关键工作",{"key":24,"text":331,"correct":22},"自始至终全部由关键工作组成的线路为关键线路",{"key":27,"text":333,"correct":22},"线路上总的工作持续时间最长的线路为关键线路",{"key":31,"text":335,"correct":29},"自由时差为最小的工作为关键工作",{"key":34,"text":337,"correct":29},"时标网络计划中波形线水平投影长度为总时差",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":352,"analysis":37},1263840,"网络计划的分类按网络计划层次可分为( )。",[342,344,346,348,350],{"key":20,"text":343,"correct":29},"时标网络计划",{"key":24,"text":345,"correct":29},"多目标网络计划",{"key":27,"text":347,"correct":22},"局部网络计划",{"key":31,"text":349,"correct":22},"综合网络计划",{"key":34,"text":351,"correct":22},"单位工程网络计划","CDE",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":52,"analysis":37},1263841,"施工进度计划的编制依据主要包括( )。",[357,359,361,363,365],{"key":20,"text":358,"correct":29},"项目可行性研究报告",{"key":24,"text":360,"correct":22},"经过审批的全套施工图及各种采用的标准图和技术资料",{"key":27,"text":362,"correct":22},"工程的工期要求及开工、竣工日期",{"key":31,"text":364,"correct":22},"工程项目工作顺序及相互间的逻辑关系",{"key":34,"text":366,"correct":22},"项目工作的提前和滞后要求",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":82,"analysis":37},1263842,"控制性施工进度计划的作用主要包括( )。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"论证施工总进度计划",{"key":24,"text":374,"correct":22},"分解施工总进度计划",{"key":27,"text":376,"correct":22},"是编制实施性进度计划的依据",{"key":31,"text":378,"correct":22},"是施工进度动态控制的依据",{"key":34,"text":380,"correct":22},"是编制与该项目相关的其他各种进度计划的依据或参考",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":36,"analysis":37},1263843,"高强度螺栓根据其受力特征可分为( )受力类型。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"摩擦型高强度螺栓",{"key":24,"text":388,"correct":22},"承压型高强度螺栓",{"key":27,"text":390,"correct":29},"A型螺栓",{"key":31,"text":392,"correct":29},"B型螺栓",{"key":34,"text":394,"correct":29},"C型螺栓",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":67,"analysis":37},1263844,"砌体质量的好坏取决于组成砌体的原材料质量和砌筑方法,故在砌筑时应掌握正确的操作方法,做到( )。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"横平竖直",{"key":24,"text":402,"correct":22},"砂浆饱满",{"key":27,"text":404,"correct":22},"错缝搭接",{"key":31,"text":406,"correct":22},"接槎可靠",{"key":34,"text":408,"correct":29},"砌筑美观",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":253,"analysis":37},1263845,"砖砌体的组砌形式主要有( )。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"一顺一丁",{"key":24,"text":416,"correct":29},"二顺一丁",{"key":27,"text":418,"correct":22},"三顺一丁",{"key":31,"text":420,"correct":22},"梅花丁",{"key":34,"text":422,"correct":22},"全丁式",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":253,"analysis":37},1263846,"混凝土拌合物运输的基本要求是( )。",[427,429,431,433,435],{"key":20,"text":428,"correct":22},"不产生离析现象",{"key":24,"text":430,"correct":29},"在混凝土终凝前能有充分的时间进行浇筑和捣实",{"key":27,"text":432,"correct":22},"保证混凝土浇筑能连续进行。",{"key":31,"text":434,"correct":22},"在混凝土初凝前能有充分的时间进行浇筑和捣实",{"key":34,"text":436,"correct":22},"保证混凝土浇筑时具有设计规定的坍落度",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":82,"analysis":37},1263847,"大模板是一种大尺寸的工具式定型模板,主要由( )组成。",[441,443,445,447,449],{"key":20,"text":442,"correct":22},"面板",{"key":24,"text":444,"correct":22},"加劲肋",{"key":27,"text":446,"correct":22},"竖楞",{"key":31,"text":448,"correct":22},"支撑系统",{"key":34,"text":450,"correct":22},"附件",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":67,"analysis":37},1263848,"人工挖孔灌注桩常用的护壁方法有( )。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"现浇混凝土护壁",{"key":24,"text":458,"correct":22},"沉井护壁",{"key":27,"text":460,"correct":22},"钢套管护壁",{"key":31,"text":462,"correct":22},"砖护壁",{"key":34,"text":464,"correct":29},"泥浆护壁",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":82,"analysis":37},1263849,"根据成孔方法不同,混凝土灌注桩可分为( )。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"干作业成孔灌注桩",{"key":24,"text":472,"correct":22},"爆扩成孔灌注桩",{"key":27,"text":474,"correct":22},"人工挖孔灌注桩",{"key":31,"text":476,"correct":22},"套管成孔灌注桩",{"key":34,"text":478,"correct":22},"泥浆护壁成孔灌注桩",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":493,"analysis":37},1263850,"深基坑的土方开挖应遵循( )的原则。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"先撑后挖",{"key":24,"text":486,"correct":29},"先撑先挖",{"key":27,"text":488,"correct":22},"分层开挖",{"key":31,"text":490,"correct":29},"严禁超挖",{"key":34,"text":492,"correct":29},"开槽支撑","AC",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":238,"analysis":37},1263851,"地面水的排除通长采用设置( )等设施来进行。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"排水沟",{"key":24,"text":501,"correct":22},"修筑土堤",{"key":27,"text":503,"correct":29},"集水井",{"key":31,"text":505,"correct":29},"井点",{"key":34,"text":507,"correct":22},"截水沟",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":82,"analysis":37},1263852,"建筑工程施工技术交底文件的基本内容包括( )。",[512,514,516,518,520],{"key":20,"text":513,"correct":22},"施工质量要求及质量保证措施",{"key":24,"text":515,"correct":22},"施工准备工作情况",{"key":27,"text":517,"correct":22},"劳动力安排及施工周期",{"key":31,"text":519,"correct":22},"主要施工方法",{"key":34,"text":521,"correct":22},"环境安全及文明施工等注意事项及安全保证措施",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":168,"analysis":37},1263853,"各地住房和城乡建设主管部门应当按专业类别建立专家库,专家库的专家应当具备的基本条件有( )。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"从事专业工作15年以上或具有丰富的专业经验",{"key":24,"text":529,"correct":22},"诚实守信、作风正派、学术严谨",{"key":27,"text":531,"correct":22},"具有高级专业技术职称",{"key":31,"text":533,"correct":29},"从事专业工作20年以上或具有丰富的专业经验",{"key":34,"text":535,"correct":29},"做事认真、责任心强",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":197,"analysis":37},1263854,"主要技术经济指标是单位工程施工组织设计的编制内容之一,主要包括( )。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"工期指标",{"key":24,"text":543,"correct":22},"安全指标",{"key":27,"text":545,"correct":22},"降低成本指标",{"key":31,"text":547,"correct":29},"工程进度指标",{"key":34,"text":549,"correct":22},"工程质量指标",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":352,"analysis":37},1263855,"施工组织设计按编制对象,可分为( )。",[554,556,558,560,562],{"key":20,"text":555,"correct":29},"标后施工组织设计",{"key":24,"text":557,"correct":29},"标前施工组织设计",{"key":27,"text":559,"correct":22},"施工方案",{"key":31,"text":561,"correct":22},"施工组织总设计",{"key":34,"text":563,"correct":22},"单位工程施工组织设计",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":578,"analysis":37},1263856,"预应力分项工程施工质量验收的一般要求有( )。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"后张法预应力工程的施工应由具有相应资质等级的预应力专业施工单位承担",{"key":24,"text":571,"correct":29},"先张法预应力工程的施工应由具有相应资质等级的预应力专业施工单位承担",{"key":27,"text":573,"correct":22},"预应力筋张拉机具设备及仪表,应定期维护和校验",{"key":31,"text":575,"correct":22},"在浇筑混凝土之前,应进行预应力隐蔽工程验收",{"key":34,"text":577,"correct":29},"浇筑完混凝土时,应进行蒸汽养护","ACD",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":82,"analysis":37},1263857,"混凝土结构子分部工程可划分为( )分项工程。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"模板",{"key":24,"text":586,"correct":22},"钢筋",{"key":27,"text":588,"correct":22},"现浇结构和装配式结构",{"key":31,"text":590,"correct":22},"预应力",{"key":34,"text":592,"correct":22},"混凝土",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":352,"analysis":37},1263858,"建筑工程质量验收的程序和组织中指出,建设单位收到工程报告后,应由建设单位负责人组织( )负责人进行单位（子单位）工程验收。",[597,599,601,603,604],{"key":20,"text":598,"correct":29},"质检部门",{"key":24,"text":600,"correct":29},"施工单位",{"key":27,"text":602,"correct":22},"监理单位",{"key":31,"text":600,"correct":22},{"key":34,"text":605,"correct":22},"设计单位",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":67,"analysis":37},1263859,"建筑工程质量验收应划分为( )。",[610,612,614,616,618],{"key":20,"text":611,"correct":22},"检验批",{"key":24,"text":613,"correct":22},"单位（子单位）工程",{"key":27,"text":615,"correct":22},"分项工程",{"key":31,"text":617,"correct":22},"分部（子分部）工程",{"key":34,"text":619,"correct":29},"分批工程",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":634,"analysis":37},1263860,"超过一定规模的危险性较大的分部分项工程中的模板工程包括( )。",[624,626,628,630,632],{"key":20,"text":625,"correct":29},"大模板工程",{"key":24,"text":627,"correct":22},"滑模工程",{"key":27,"text":629,"correct":22},"爬模工程",{"key":31,"text":631,"correct":29},"悬模工程",{"key":34,"text":633,"correct":22},"飞模工程","BCE",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":82,"analysis":37},1263861,"危险性较大的分部分项工程中的脚手架工程包括( )。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"附着式整体和分片提升脚手架工程",{"key":24,"text":642,"correct":22},"悬挑式脚手架工程及吊篮脚手架工程",{"key":27,"text":644,"correct":22},"搭设高度24m及以上的落地式钢管脚手架工程",{"key":31,"text":646,"correct":22},"自制卸料平台、移动操作平台工程",{"key":34,"text":648,"correct":22},"新型及异型脚手架工程",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":197,"analysis":37},1263862,"危险性较大的分部分项工程中的模板工程包括( )。",[653,654,655,656,657],{"key":20,"text":625,"correct":22},{"key":24,"text":627,"correct":22},{"key":27,"text":629,"correct":22},{"key":31,"text":631,"correct":29},{"key":34,"text":633,"correct":22},{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":578,"analysis":37},1263863,"施工从业人员的义务包括( )。",[662,664,666,668,670],{"key":20,"text":663,"correct":22},"遵章守规的义务",{"key":24,"text":665,"correct":29},"提高职业技能的义务",{"key":27,"text":667,"correct":22},"掌握安全知识、技能的义务",{"key":31,"text":669,"correct":22},"安全隐患及时报告的义务",{"key":34,"text":671,"correct":29},"遵守劳动纪律和职业道德的义务",{"id":673,"libraryId":5,"type":674,"typeLabel":675,"stem":676,"options":677,"answer":679,"analysis":37},1263864,3,"判断题","施工资料是建筑工程在工程施工过程中形成的资料,包括施工管理资料、施工技术资料、竣工验收资料等8类。",[678,680],{"key":20,"text":679,"correct":22},"正确",{"key":24,"text":681,"correct":29},"错误",{"id":683,"libraryId":5,"type":674,"typeLabel":675,"stem":684,"options":685,"answer":681,"analysis":37},1263865,"记录施工情况包括:记录单位工程名称、开工时间、完成时间、施工工艺、完成情况、未完成情况、未完成原因及其他情况等。",[686,687],{"key":20,"text":679,"correct":29},{"key":24,"text":681,"correct":22},{"id":689,"libraryId":5,"type":674,"typeLabel":675,"stem":690,"options":691,"answer":679,"analysis":37},1263866,"工程质量缺陷,一般是指工程不符合国家或行业现行有关技术标准、设计文件及合同中对质量的要求。",[692,693],{"key":20,"text":679,"correct":22},{"key":24,"text":681,"correct":29},{"id":695,"libraryId":5,"type":674,"typeLabel":675,"stem":696,"options":697,"answer":681,"analysis":37},1263867,"三级安全教育是指公司、项目经理部、施工班组三个层次的安全教育。其中施工班组的教育内容是工地安全制度、施工现场环境、工程施工特点及可能存在的不安全因素等。",[698,699],{"key":20,"text":679,"correct":29},{"key":24,"text":681,"correct":22},[701,705,708,711,714,717],{"id":702,"name":703,"category":7,"favorite":704},1,"领导干部任职前廉政法规知识测试题",92,{"id":706,"name":707,"category":7,"favorite":702},595,"建筑结构与设备",{"id":709,"name":710,"category":7,"favorite":702},715,"招标采购专业知识与法律法规",{"id":712,"name":713,"category":7,"favorite":702},848,"市政方向-通用基础",{"id":715,"name":716,"category":7,"favorite":8},534,"BIM工程师",{"id":718,"name":716,"category":7,"favorite":8},535]