[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,5,50,395,[13,37,53,68,82,96,111,125,140,154,168,181,195,210,223,238,251,265,280,294,308,323,337,351,365,379,393,407,422,436,450,464,478,492,507,522,536,550,565,579,593,607,621,635,648,662,675,689,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":35,"analysis":36},1263768,2,"多选题","施工安全检查的主要形式有( )。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","项目每周或每旬由主要负责人带队组织定期的安全大检查",true,{"key":24,"text":25,"correct":22},"B","施工班组每天上班前由班组长和安全值日人员组织的班前安全检查",{"key":27,"text":28,"correct":22},"C","由安全管理小组成员、安全专兼职人员和安全值日人员进行日常的安全检查",{"key":30,"text":31,"correct":22},"D","季节更换前由安全生产管理人员和安全专职人员等组织的季节劳动保护安全检查",{"key":33,"text":34,"correct":22},"E","对塔式起重机等起重设备、井架、龙门架等设施在安装搭设完成后进行安全验收、检查","ABCDE","",{"id":38,"libraryId":5,"type":15,"typeLabel":16,"stem":39,"options":40,"answer":52,"analysis":36},1263769,"进行安全生产管理时,“三个同时”是指安全生产与( )同步策划、同步发展、同步实施的原则。",[41,43,45,47,50],{"key":20,"text":42,"correct":22},"经济建设",{"key":24,"text":44,"correct":22},"企业深化改革",{"key":27,"text":46,"correct":22},"技术改造",{"key":30,"text":48,"correct":49},"安全管理",false,{"key":33,"text":51,"correct":49},"安全检查","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":36},1263770,"安全管理目标主要包括( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"伤亡事故控制目标",{"key":24,"text":60,"correct":49},"预算达标目标",{"key":27,"text":62,"correct":22},"安全达标目标",{"key":30,"text":64,"correct":49},"污水排放合格目标",{"key":33,"text":66,"correct":22},"文明施工实现目标","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":35,"analysis":36},1263771,"基础施工阶段,施工安全控制要点有( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"挖土机械作业安全",{"key":24,"text":75,"correct":22},"防水施工时的防火、防毒",{"key":27,"text":77,"correct":22},"人工挖扩孔桩安全",{"key":30,"text":79,"correct":22},"边坡防护安全",{"key":33,"text":81,"correct":22},"降水设备与临时用电安全",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":52,"analysis":36},1263772,"三级安全教育是指( )三个层次的安全教育。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"公司",{"key":24,"text":89,"correct":22},"项目经理部",{"key":27,"text":91,"correct":22},"施工班组",{"key":30,"text":93,"correct":49},"监理部",{"key":33,"text":95,"correct":49},"建设单位部门",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":36},1263773,"对达到一定规模的危险性较大的分部分项工程应编制专项施工方案,并附安全验算结果。这些工程包括( )。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"土方开挖工程",{"key":24,"text":103,"correct":49},"钢筋工程",{"key":27,"text":105,"correct":22},"爆破工程",{"key":30,"text":107,"correct":22},"模板工程",{"key":33,"text":109,"correct":22},"脚手架工程","ACDE",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":35,"analysis":36},1263774,"-般工程安全技术措施的编制应考虑的内容有( )。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"进入施工现场的安全规定",{"key":24,"text":118,"correct":22},"施工用电安全",{"key":27,"text":120,"correct":22},"机械设备的安全使用",{"key":30,"text":122,"correct":22},"防火防爆措施",{"key":33,"text":124,"correct":22},"地面及深坑作业的防护",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":36},1263775,"施工安全技术措施应具有哪些特性( )。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"超前性",{"key":24,"text":132,"correct":22},"可靠性",{"key":27,"text":134,"correct":22},"针对性",{"key":30,"text":136,"correct":22},"可操作性",{"key":33,"text":138,"correct":49},"稳定性","ABCD",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":35,"analysis":36},1263776,"施工质量计划的内容一般包括( )。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"工程特点及施工条件分析",{"key":24,"text":147,"correct":22},"工程检测项目计划及方法",{"key":27,"text":149,"correct":22},"材料设备质量管理及控制措施",{"key":30,"text":151,"correct":22},"质量管理组织机构、人员及资源配置计划",{"key":33,"text":153,"correct":22},"为确保工程质量所采取的施工技术方案、施工程序",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":110,"analysis":36},1263777,"施工现场实测法的手段可归纳为哪几个字( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"吊",{"key":24,"text":161,"correct":49},"看",{"key":27,"text":163,"correct":22},"靠",{"key":30,"text":165,"correct":22},"量",{"key":33,"text":167,"correct":22},"套",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":180,"analysis":36},1263778,"施工现场目测法的手段可归纳为哪几个字( )。",[172,173,174,176,178],{"key":20,"text":159,"correct":49},{"key":24,"text":161,"correct":22},{"key":27,"text":175,"correct":22},"敲",{"key":30,"text":177,"correct":22},"摸",{"key":33,"text":179,"correct":22},"照","BCDE",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":35,"analysis":36},1263779,"施工单位现场质量检查的内容有( )。",[185,187,189,191,193],{"key":20,"text":186,"correct":22},"成品保护检查",{"key":24,"text":188,"correct":22},"开工前检查",{"key":27,"text":190,"correct":22},"工序交接检查",{"key":30,"text":192,"correct":22},"停工后复工前的检查",{"key":33,"text":194,"correct":22},"隐蔽工程检查",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":209,"analysis":36},1263780,"在质量管理体系中使用四类文件,按其适用的范围可分为通用性文件和专用性文件,下列选项中属于通用性文件的是( )。",[199,201,203,205,207],{"key":20,"text":200,"correct":22},"质量手册",{"key":24,"text":202,"correct":49},"质量计划",{"key":27,"text":204,"correct":49},"质量控制文件",{"key":30,"text":206,"correct":22},"质量方针政策",{"key":33,"text":208,"correct":22},"程序文件和记录","ADE",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":222,"analysis":36},1263781,"质量管理体系中使用的文件有( )。",[214,215,216,218,220],{"key":20,"text":200,"correct":22},{"key":24,"text":202,"correct":22},{"key":27,"text":217,"correct":22},"程序文件",{"key":30,"text":219,"correct":49},"质量目标",{"key":33,"text":221,"correct":22},"记录","ABCE",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":36},1263782,"规费是指政府和有关权力部门规定必须缴纳的费用,其内容包括( )。",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"工程排污费",{"key":24,"text":230,"correct":22},"住房公积金",{"key":27,"text":232,"correct":49},"人工费",{"key":30,"text":234,"correct":22},"社会保障费",{"key":33,"text":236,"correct":49},"总承包服务费","ABD",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":250,"analysis":36},1263783,"其他项目费包括招标人部分和投标人部分。其中招标人部分包括( )。",[242,244,246,247,249],{"key":20,"text":243,"correct":22},"预留金",{"key":24,"text":245,"correct":22},"材料购置费",{"key":27,"text":232,"correct":49},{"key":30,"text":248,"correct":49},"零星工作项目费",{"key":33,"text":236,"correct":49},"AB",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":110,"analysis":36},1263784,"我国现行的工程价款主要结算方式包括( )。",[255,257,259,261,263],{"key":20,"text":256,"correct":22},"按月结算",{"key":24,"text":258,"correct":49},"按年结算",{"key":27,"text":260,"correct":22},"分段结算",{"key":30,"text":262,"correct":22},"竣工后一次结算",{"key":33,"text":264,"correct":22},"目标结算",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":279,"analysis":36},1263785,"当实际施工进度发生拖延时,为加快施工进度而采取的组织措施可以是( )。",[269,271,273,275,277],{"key":20,"text":270,"correct":22},"增加工作面和每天的施工时间",{"key":24,"text":272,"correct":49},"改善劳动条件并实施强有力的调度",{"key":27,"text":274,"correct":49},"采用更先进的施工机械和施工方法",{"key":30,"text":276,"correct":49},"改进施工方法,减少施工过程的数量",{"key":33,"text":278,"correct":22},"增加劳动力和施工机械的数量","AE",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":293,"analysis":36},1263786,"在施工进度计划的调整过程中,压缩关键工作持续时间的技术措施有( )。",[284,285,287,289,291],{"key":20,"text":278,"correct":49},{"key":24,"text":286,"correct":22},"改进施工工艺和施工技术",{"key":27,"text":288,"correct":22},"采用更先进的施工机械",{"key":30,"text":290,"correct":49},"改善外部配合条件",{"key":33,"text":292,"correct":49},"采用工程分包方式","BC",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":307,"analysis":36},1263787,"在建设工程施工过程中,加快施工进度的组织措施包括( )。",[298,300,302,304,305],{"key":20,"text":299,"correct":49},"采用先进的施工方法以减少施工过程的数量",{"key":24,"text":301,"correct":22},"增加工作面,组织更多的专业工作队",{"key":27,"text":303,"correct":49},"改善劳动条件和外部配合条件",{"key":30,"text":278,"correct":22},{"key":33,"text":306,"correct":49},"改进施工工艺并实施强有力的调度","BD",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":322,"analysis":36},1263788,"编制建设工程施工总进度计划,主要用来确定如下哪几项工作( )。",[312,314,316,318,320],{"key":20,"text":313,"correct":49},"各单项工程或单位工程的工期定额",{"key":24,"text":315,"correct":49},"建设的要求工期和计算工期",{"key":27,"text":317,"correct":22},"各单项工程或工程的施工期限",{"key":30,"text":319,"correct":49},"各单项工程或单位工程的实物工程量",{"key":33,"text":321,"correct":22},"各单项工程或单位工程的相互搭接关系","CE",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":180,"analysis":36},1263789,"资源配置计划包括( )等内容。",[327,329,331,333,335],{"key":20,"text":328,"correct":49},"临时设施计划",{"key":24,"text":330,"correct":22},"主要材料配置计划",{"key":27,"text":332,"correct":22},"施工机具配置计划",{"key":30,"text":334,"correct":22},"构配件配置计划",{"key":33,"text":336,"correct":22},"劳动力配置计划",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":139,"analysis":36},1263790,"工程项目资源管理内容主要包括( )。",[341,343,345,347,349],{"key":20,"text":342,"correct":22},"人力资源管理",{"key":24,"text":344,"correct":22},"材料管理",{"key":27,"text":346,"correct":22},"机械设备管理",{"key":30,"text":348,"correct":22},"技术管理和资金管理",{"key":33,"text":350,"correct":49},"环境管理",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":110,"analysis":36},1263791,"工程项目资源的特点主要表现为( )。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"工程所需资源的种类多、需求量大",{"key":24,"text":358,"correct":49},"工程所需资金的数量大",{"key":27,"text":360,"correct":22},"工程项目建设过程的不均衡性",{"key":30,"text":362,"correct":22},"资源供应受外界影响大,具有复杂性和不确定性,资源经常需要在多个项目中协调",{"key":33,"text":364,"correct":22},"资源对项目成本的影响大",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":52,"analysis":36},1263792,"施工任务书是向班组下达任务,实行责任承包、全面管理和原始记录的综合性文件,它是计划和实施的纽带,其包括( )。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"施工任务单",{"key":24,"text":372,"correct":22},"限额领料单",{"key":27,"text":374,"correct":22},"考勤表",{"key":30,"text":376,"correct":49},"施工进度表",{"key":33,"text":378,"correct":49},"材料单",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":35,"analysis":36},1263793,"施工进度计划的审核内容包括( )。",[383,385,387,389,391],{"key":20,"text":384,"correct":22},"进度安排是否符合施工合同确定的建设项目总目标和分目标的要求",{"key":24,"text":386,"correct":22},"施工进度计划中的内容是否有遗漏,分期施工是否满足分批交工的需要和配套交工的要求",{"key":27,"text":388,"correct":22},"施工顺序安排是否符合施工程序的要求",{"key":30,"text":390,"correct":22},"资源供应计划是否能保证施工进度计划的实现,供应是否均衡,分包人供应的资源是否满足进度要求",{"key":33,"text":392,"correct":22},"施工图设计的进度是否满足施工进度计划要求",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":222,"analysis":36},1263794,"施工进度计划编制依据包括( )。",[397,399,401,403,405],{"key":20,"text":398,"correct":22},"约束条件",{"key":24,"text":400,"correct":22},"工程的工期要求及开工、竣工日期",{"key":27,"text":402,"correct":22},"资源需求",{"key":30,"text":404,"correct":49},"施工方法",{"key":33,"text":406,"correct":22},"作业制度安排",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":421,"analysis":36},1263795,"多层混合结构民用房屋的施工,按照房屋结构各部位不同的施工特点,可分为( )。",[411,413,415,417,419],{"key":20,"text":412,"correct":49},"设备工程",{"key":24,"text":414,"correct":22},"基础工程",{"key":27,"text":416,"correct":22},"主体工程",{"key":30,"text":418,"correct":22},"屋面及装修工程",{"key":33,"text":420,"correct":49},"地面工程","BCD",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":139,"analysis":36},1263796,"确定施工顺序的基本要求包括( )。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"必须符合施工工艺的要求",{"key":24,"text":429,"correct":22},"必须与施工方法协调一致",{"key":27,"text":431,"correct":22},"必须考虑当地的气候条件",{"key":30,"text":433,"correct":22},"必须考虑安全施工的要求",{"key":33,"text":435,"correct":49},"必须考虑文明施工的要求",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":139,"analysis":36},1263797,"确定施工顺序应遵循的基本原则是( )。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"先地下,后地上",{"key":24,"text":443,"correct":22},"先主体,后围护",{"key":27,"text":445,"correct":22},"先结构,后装修",{"key":30,"text":447,"correct":22},"先土建,后设备",{"key":33,"text":449,"correct":49},"先围护,后主体",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":35,"analysis":36},1263798,"划分施工段的基本原则有( )。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"施工段的数目要合理",{"key":24,"text":457,"correct":22},"要有利于结构的整体性",{"key":27,"text":459,"correct":22},"要有足够的工作面",{"key":30,"text":461,"correct":22},"以主导施工过程为依据进行划分",{"key":33,"text":463,"correct":22},"各施工段的劳动量（或工程量）要大致相等",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":180,"analysis":36},1263799,"建筑物主体结构施工中,监测的主要内容包括建筑物的( )。",[468,470,472,474,476],{"key":20,"text":469,"correct":49},"水平位移观测",{"key":24,"text":471,"correct":22},"垂直位移观测",{"key":27,"text":473,"correct":22},"倾斜观测",{"key":30,"text":475,"correct":22},"挠度观测",{"key":33,"text":477,"correct":22},"裂缝观测",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":35,"analysis":36},1263800,"深基坑施工中变形观测的内容有( )。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"支护结构顶部的水平位移观测",{"key":24,"text":485,"correct":22},"邻近建筑物的垂直位移、倾斜、裂缝观测",{"key":27,"text":487,"correct":22},"邻近道路、地下管网设施的垂直位移、倾斜、裂缝观测",{"key":30,"text":489,"correct":22},"支护结构的垂直位移观测",{"key":33,"text":491,"correct":22},"支护结构倾斜观测",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":506,"analysis":36},1263801,"施工技术交底一般包括( )。",[496,498,500,502,504],{"key":20,"text":497,"correct":22},"设计交底",{"key":24,"text":499,"correct":49},"合同交底",{"key":27,"text":501,"correct":22},"施工组织设计交底",{"key":30,"text":503,"correct":22},"分部、分项工程施工技术交底",{"key":33,"text":505,"correct":49},"材料交底","ACD",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":521,"analysis":36},1263802,"建筑工程施工图的识读方法包括( )。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"总体了解",{"key":24,"text":514,"correct":22},"前后对照",{"key":27,"text":516,"correct":49},"详图细读",{"key":30,"text":518,"correct":22},"顺序识读",{"key":33,"text":520,"correct":22},"重点细读","ABDE",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":139,"analysis":36},1263803,"下列关于各专业施工图的排列顺序说法正确的是( )。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"基础图在前,详图在后",{"key":24,"text":529,"correct":22},"总体图在前,局部图在后",{"key":27,"text":531,"correct":22},"主要部分在前,次要部分在后",{"key":30,"text":533,"correct":22},"先施工的在前,后施工的在后",{"key":33,"text":535,"correct":49},"重要部分在前,次要部分在后",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":139,"analysis":36},1263804,"结构施工图一般包括( )。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"结构设计图纸目录",{"key":24,"text":543,"correct":22},"结构设计总说明",{"key":27,"text":545,"correct":22},"结构平面图",{"key":30,"text":547,"correct":22},"构件详图",{"key":33,"text":549,"correct":49},"结构剖面图",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":564,"analysis":36},1263805,"建筑工程施工图的分类,按专业分工不同可分为( )。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"建筑施工图",{"key":24,"text":557,"correct":22},"结构施工图",{"key":27,"text":559,"correct":49},"给排水施工图",{"key":30,"text":561,"correct":49},"采暖通风施工图",{"key":33,"text":563,"correct":22},"设备施工图","ABE",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":521,"analysis":36},1263806,"土钉支护的施工特点有( )。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"施工设备较简单",{"key":24,"text":572,"correct":22},"比用挡土桩锚杆施工简便",{"key":27,"text":574,"correct":49},"施工速度较慢",{"key":30,"text":576,"correct":22},"节省工期",{"key":33,"text":578,"correct":22},"造价较低",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":35,"analysis":36},1263807,"施工现场管理的总体要求有( )。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"文明施工",{"key":24,"text":586,"correct":22},"安全有序",{"key":27,"text":588,"correct":22},"整洁卫生",{"key":30,"text":590,"correct":22},"现场人口处的醒目位置,应公示“五牌”、“二图”",{"key":33,"text":592,"correct":22},"项目经理部应经常巡视检查施工现场,认真听取各方意见和反映,及时抓好整改",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":35,"analysis":36},1263808,"施工现场入口处的醒目位置.应公示“五牌”、“二图”,其中“五牌”指的是( )。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"建设项目概况牌",{"key":24,"text":600,"correct":22},"安全纪律牌",{"key":27,"text":602,"correct":22},"防火须知牌",{"key":30,"text":604,"correct":22},"安全无重大事故牌",{"key":33,"text":606,"correct":22},"安全生产、文明施工牌",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":506,"analysis":36},1263809,"项目施工协调是单位工程施工部署的重要内容,其中包括( )。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"与建设单位的协调",{"key":24,"text":614,"correct":49},"与监理单位的协调",{"key":27,"text":616,"correct":22},"与监理工程师的协调",{"key":30,"text":618,"correct":22},"与设计单位的协调",{"key":33,"text":620,"correct":49},"与施工单位的协调",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":35,"analysis":36},1263810,"施工准备工作是单位工程资源准备的重要内容,包括( )。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"人员准备",{"key":24,"text":628,"correct":22},"机械设备准备",{"key":27,"text":630,"correct":22},"技术准备",{"key":30,"text":632,"correct":22},"施工现场准备",{"key":33,"text":634,"correct":22},"材料准备",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":222,"analysis":36},1263811,"施工管理目标是单位工程施工部署的重要内容,其中包括( )。",[639,640,642,644,646],{"key":20,"text":219,"correct":22},{"key":24,"text":641,"correct":22},"社会行为目标",{"key":27,"text":643,"correct":22},"工期目标",{"key":30,"text":645,"correct":49},"成本目标",{"key":33,"text":647,"correct":22},"安全生产文明施工目标",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":67,"analysis":36},1263812,"施工组织设计和专项施工方案的编制应做到( )。",[652,654,656,658,660],{"key":20,"text":653,"correct":22},"经济合理",{"key":24,"text":655,"correct":49},"通俗易懂",{"key":27,"text":657,"correct":22},"技术先进",{"key":30,"text":659,"correct":49},"范围全面",{"key":33,"text":661,"correct":22},"留有余地",{"id":663,"libraryId":5,"type":15,"typeLabel":16,"stem":664,"options":665,"answer":139,"analysis":36},1263813,"施工组织设计和专项施工方案的编制依据主要有( )。",[666,668,670,672,674],{"key":20,"text":667,"correct":22},"工程合同",{"key":24,"text":669,"correct":22},"施工图纸",{"key":27,"text":671,"correct":22},"技术图集",{"key":30,"text":673,"correct":22},"标准、规范",{"key":33,"text":404,"correct":49},{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":139,"analysis":36},1263814,"混凝土振动机械按其工作方式分为( )。",[679,681,683,685,687],{"key":20,"text":680,"correct":22},"内部振动器",{"key":24,"text":682,"correct":22},"表面振动器",{"key":27,"text":684,"correct":22},"外部振动器",{"key":30,"text":686,"correct":22},"振动台",{"key":33,"text":688,"correct":49},"全方位振动器",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":250,"analysis":36},1263815,"混凝土搅拌机按其搅拌原理分为( )。",[693,695,697,699,701],{"key":20,"text":694,"correct":22},"自落式搅拌机",{"key":24,"text":696,"correct":22},"强制式搅拌机",{"key":27,"text":698,"correct":49},"单卧轴搅拌机",{"key":30,"text":700,"correct":49},"双卧轴搅拌机",{"key":33,"text":702,"correct":49},"滚筒式搅拌机",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":110,"analysis":36},1263816,"塔式起重机的工作参数有( )。",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"回转半径",{"key":24,"text":710,"correct":49},"起重半径",{"key":27,"text":712,"correct":22},"起升高度",{"key":30,"text":714,"correct":22},"起重力矩",{"key":33,"text":716,"correct":22},"起重量‘",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":180,"analysis":36},1263817,"正铲挖土机作业的适用范围包括( )。",[721,723,725,727,729],{"key":20,"text":722,"correct":49},"开挖含水量大的一～三类的砂土或黏土",{"key":24,"text":724,"correct":22},"大型场地整平土方",{"key":27,"text":726,"correct":22},"工作面狭小且较深的大型管沟和基槽路堑",{"key":30,"text":728,"correct":22},"独立基坑",{"key":33,"text":730,"correct":22},"边坡开挖",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]