[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,3,50,395,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,213,224,233,243,255,267,279,291,303,314,326,338,349,361,373,385,397,409,421,433,445,457,469,481,493,505,517,529,541,553,565,577,589,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1263668,1,"单选题","拉铲挖掘机的挖土特点是:“后退向下,自重切土”。拉铲挖土时,吊杆倾斜角度应在450以上,先挖两侧然后中间,分层进行,保持边坡整齐;距边坡的安全距离应不小于( )m。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1.0",false,{"key":24,"text":25,"correct":22},"B","1.5",{"key":27,"text":28,"correct":29},"C","2.0",true,{"key":31,"text":32,"correct":22},"D","2.5","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1263669,"拉铲挖土机作业特点中说法错误的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"开挖停机面以下土方",{"key":24,"text":41,"correct":22},"可装车和甩土",{"key":27,"text":43,"correct":29},"开挖截面误差较小",{"key":31,"text":45,"correct":22},"可将土甩在基坑（槽）两边较远处堆放",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1263670,"下列关于挖土机的挖土特点说法错误的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"正铲挖土机的挖土特点是:“前进向上,强制切土”",{"key":24,"text":53,"correct":22},"反铲挖土机的挖土特点是:“后退向下,强制切土”",{"key":27,"text":55,"correct":29},"拉铲挖土机的挖土特点是:“前进向上,自重切土”",{"key":31,"text":57,"correct":22},"抓铲挖土机的挖土特点是:“直上直下,自重切土”",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1263671,"正铲挖土机作业特点中说法错误的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"开挖停机面以上土方",{"key":24,"text":65,"correct":22},"工作面应在1.5m以上",{"key":27,"text":67,"correct":22},"开挖高度超过挖土机挖掘高度时,可采取分层开挖",{"key":31,"text":69,"correct":29},"可装车和两边甩土、堆放",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1263672,"施工成本控制的依据不包括( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程承包合同",{"key":24,"text":77,"correct":22},"进度报告",{"key":27,"text":79,"correct":29},"施工图",{"key":31,"text":81,"correct":22},"施工成本计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1263673,"施工成本中的人工费的控制,实行( )的原则。",[86,88,90,92],{"key":20,"text":87,"correct":22},"计量控制",{"key":24,"text":89,"correct":22},"指标控制",{"key":27,"text":91,"correct":29},"量价分离",{"key":31,"text":93,"correct":22},"包干控制",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1263674,"( )是在保证符合设计规格和质量标准的前提下,合理使用材料和节约使用材料,通过定额管理、计量管理等手段以及施工质量控制,避免返工等,有效控制材料物资的消耗。",[98,100,102,104],{"key":20,"text":99,"correct":22},"材料费的控制",{"key":24,"text":101,"correct":29},"材料用量的控制",{"key":27,"text":103,"correct":22},"材料价格的控制",{"key":31,"text":105,"correct":22},"材料消耗的控制",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1263675,"工程项目成本控制不包括( )。",[110,112,113,115],{"key":20,"text":111,"correct":29},"措施费的控制",{"key":24,"text":99,"correct":22},{"key":27,"text":114,"correct":22},"人工费的控制",{"key":31,"text":116,"correct":22},"管理费的控制",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1263676,"规费是指政府和有关权力部门规定必须缴纳的费用,下列哪一项不属于规费的范畴( )。",[121,123,125,127],{"key":20,"text":122,"correct":22},"工程排污费",{"key":24,"text":124,"correct":29},"环境保护费",{"key":27,"text":126,"correct":22},"社会保障费",{"key":31,"text":128,"correct":22},"工程定额测定费",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},1263677,"现场质量检查的主要方法不包括( )。",[133,135,137,139],{"key":20,"text":134,"correct":22},"目测法",{"key":24,"text":136,"correct":22},"实测法",{"key":27,"text":138,"correct":29},"经验法",{"key":31,"text":140,"correct":22},"试验法",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1263678,"施工过程质量控制的依据不包括( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"专门技术法规",{"key":24,"text":148,"correct":22},"设计文件",{"key":27,"text":150,"correct":22},"工程合同文件",{"key":31,"text":152,"correct":29},"建设单位的意图和要求",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1263679,"工程质量控制中,要以人为核心,重点控制( ),充分发挥人的积极性和创造性,以人的工作质量保证工程质量。",[157,159,161,163],{"key":20,"text":158,"correct":22},"人的专业水平",{"key":24,"text":160,"correct":29},"人的素质和人的行为",{"key":27,"text":162,"correct":22},"人的主观能动性",{"key":31,"text":164,"correct":22},"人的专业和工作能力",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1263680,"在工程建设中自始至终把( )作为对工程质量控制的基本原则。",[169,171,173,175],{"key":20,"text":170,"correct":29},"质量第一",{"key":24,"text":172,"correct":22},"以人为核心",{"key":27,"text":174,"correct":22},"预防为主",{"key":31,"text":176,"correct":22},"科学公正守法",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},1263681,"工程施工质量控制时,事中控制的关键是坚持质量标准,控制的重点不包括( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"工序质量",{"key":24,"text":184,"correct":22},"工作质量",{"key":27,"text":186,"correct":22},"质量控制点的控制",{"key":31,"text":188,"correct":29},"监督控制",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1263682,"对于重要的工序或对工程质量有重大影响的工序,应严格执行“三检”制度,其中不包括( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"自检",{"key":24,"text":196,"correct":22},"互检",{"key":27,"text":198,"correct":29},"例检",{"key":31,"text":200,"correct":22},"专检",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1263683,"事故性质类别可分为三类,其中不包括( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"责任事故",{"key":24,"text":208,"correct":22},"非责任事故",{"key":27,"text":210,"correct":22},"破坏性事故",{"key":31,"text":212,"correct":29},"死亡事故",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1263684,"某建筑工地,由于施工方法不当,造成安全事故,在此次事故中死亡5人,则该事故属( )。",[217,219,221,223],{"key":20,"text":218,"correct":22},"重伤事故",{"key":24,"text":220,"correct":29},"重大伤亡事故",{"key":27,"text":222,"correct":22},"重大事故",{"key":31,"text":212,"correct":22},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":27,"analysis":33},1263685,"根据《生产安全事故报告和调查处理条例》规定:造成10人以上30人以下死亡,或者50人以上100人以下重伤,或者5000万元以上1亿元以下直接经济损失的事故____。",[228,229,231,232],{"key":20,"text":218,"correct":22},{"key":24,"text":230,"correct":22},"较大事故",{"key":27,"text":222,"correct":29},{"key":31,"text":212,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1263686,"施工过程中的“四口”应有防护措施。如楼梯、通道口应设置( )m高的防护栏杆并加装安全立网,预留孔洞应加盖等。",[237,239,241,242],{"key":20,"text":238,"correct":22},"0.9",{"key":24,"text":240,"correct":29},"1.2",{"key":27,"text":21,"correct":22},{"key":31,"text":25,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},1263687,"( )m以上脚手架或设置的挑架,大型混凝土模板工程,还应进行架体和模板承重强度、荷载计算,以保证施工过程中的安全。",[247,249,251,253],{"key":20,"text":248,"correct":22},"20",{"key":24,"text":250,"correct":22},"25",{"key":27,"text":252,"correct":29},"30",{"key":31,"text":254,"correct":22},"40",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},1263688,"一般工程施工安全危险源的防范重点主要考虑的内容不包括( )。",[259,261,263,265],{"key":20,"text":260,"correct":22},"季节性施工的安全措施",{"key":24,"text":262,"correct":22},"施工过程中的“四口”的防护措施",{"key":27,"text":264,"correct":22},"“临边”防护措施",{"key":31,"text":266,"correct":29},"夜间施工的安全措施",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1263689,"施工现场水体污染的处理方法不包括( )。",[271,273,275,277],{"key":20,"text":272,"correct":22},"控制污水的排放",{"key":24,"text":274,"correct":29},"综合利用废水",{"key":27,"text":276,"correct":22},"将污水排到污水池",{"key":31,"text":278,"correct":22},"改革施工工艺,减少污水的产生",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1263690,"保持施工现场良好的作业环境、卫生环境和工作秩序,此项工作是( )的范畴。",[283,285,287,289],{"key":20,"text":284,"correct":22},"安全管理",{"key":24,"text":286,"correct":29},"文明施工",{"key":27,"text":288,"correct":22},"环境保护",{"key":31,"text":290,"correct":22},"消防管理",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},1263691,"文明施工的文件和资料不包括( )。",[295,297,299,301],{"key":20,"text":296,"correct":22},"文明施工自检资料",{"key":24,"text":298,"correct":29},"职业健康安全管理方案",{"key":27,"text":300,"correct":22},"文明施工教育、培训、考核计划资料",{"key":31,"text":302,"correct":22},"上级关于文明施工的标准、规定、法律法规等资料",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1263692,"影响工作场所内员工、临时工作人员、合同方人员、访问者和其他人员健康安全的条件和因素被称为( )。",[307,309,311,312],{"key":20,"text":308,"correct":29},"职业健康安全",{"key":24,"text":310,"correct":22},"劳动安全",{"key":27,"text":288,"correct":22},{"key":31,"text":313,"correct":22},"环境健康安全",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},1263693,"等步距异节拍流水施工的特征不包括( )。",[318,320,322,324],{"key":20,"text":319,"correct":22},"同一施工过程流水节拍相等,不同施工过程流水节拍等于其中最小流水节拍的整数倍",{"key":24,"text":321,"correct":22},"流水步距彼此相等,且等于最小流水节拍值",{"key":27,"text":323,"correct":22},"施工队组数大于施工过程数",{"key":31,"text":325,"correct":29},"施工班组数等于施工过程数",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},1263694,"组织流水施工时,时间参数不包括( )。",[330,332,334,336],{"key":20,"text":331,"correct":22},"流水节拍",{"key":24,"text":333,"correct":22},"流水步距",{"key":27,"text":335,"correct":22},"工期",{"key":31,"text":337,"correct":29},"施工段",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},1263695,"组织流水施工时,空间参数不包括( )。",[342,344,345,347],{"key":20,"text":343,"correct":22},"施工层数",{"key":24,"text":333,"correct":29},{"key":27,"text":346,"correct":22},"工作面",{"key":31,"text":348,"correct":22},"施工段数",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":27,"analysis":33},1263696,"下列哪一项不是流水施工的基本参数( )。",[353,355,357,359],{"key":20,"text":354,"correct":22},"工艺参数",{"key":24,"text":356,"correct":22},"时间参数",{"key":27,"text":358,"correct":29},"结构参数",{"key":31,"text":360,"correct":22},"空间参数",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1263697,"下列关于双代号网络图的绘制规则的说法中,错误的是( )。",[365,367,369,371],{"key":20,"text":366,"correct":22},"双代号网络图必须正确表达逻辑关系",{"key":24,"text":368,"correct":29},"网络图中允许出现循环线路",{"key":27,"text":370,"correct":22},"网络图中不允许出现代号相同的箭线",{"key":31,"text":372,"correct":22},"严禁在网络图中出现没有箭尾节点的箭线和没有箭头节点的箭线",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":20,"analysis":33},1263698,"一般来说,一个网络图中至少有( )条关键线路。关键线路也不是一成不变的,在一定的条件下,关键线路和非关键线路会相互转化。",[377,379,381,383],{"key":20,"text":378,"correct":29},"1",{"key":24,"text":380,"correct":22},"2",{"key":27,"text":382,"correct":22},"3",{"key":31,"text":384,"correct":22},"4",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1263699,"虚工作起的作用不包括( )。",[389,391,393,395],{"key":20,"text":390,"correct":22},"联系",{"key":24,"text":392,"correct":22},"区分",{"key":27,"text":394,"correct":22},"断路",{"key":31,"text":396,"correct":29},"选择",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},1263700,"双代号网络图中,虚箭线表示( )。",[401,403,405,407],{"key":20,"text":402,"correct":22},"工作的持续时间",{"key":24,"text":404,"correct":22},"资源的消耗",{"key":27,"text":406,"correct":29},"工作之间的逻辑关系",{"key":31,"text":408,"correct":22},"非关键工作",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1263701,"下列哪一种方法不是确定施工过程持续时间的方法( )。",[413,415,417,419],{"key":20,"text":414,"correct":22},"经验估算法",{"key":24,"text":416,"correct":22},"定额计算法",{"key":27,"text":418,"correct":22},"倒排计划法",{"key":31,"text":420,"correct":29},"目标计算法",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1263702,"施工进度计划在编制时,工程量计算应注意很多事项,其中不包括( )。",[425,427,429,431],{"key":20,"text":426,"correct":29},"划分的施工段数",{"key":24,"text":428,"correct":22},"工程量的计量单位",{"key":27,"text":430,"correct":22},"采用的施工方法",{"key":31,"text":432,"correct":22},"正确取用计价文件中的工程量",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},1263703,"编制施工进度计划的工具不包括( )。",[437,439,441,443],{"key":20,"text":438,"correct":22},"横道计划",{"key":24,"text":440,"correct":22},"网络计划",{"key":27,"text":442,"correct":22},"里程碑计划",{"key":31,"text":444,"correct":29},"时标计划",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1263704,"下列哪一项不是常用的防水混凝土( )。",[449,451,453,455],{"key":20,"text":450,"correct":22},"普通防水混凝土",{"key":24,"text":452,"correct":22},"膨胀水泥防水混凝土",{"key":27,"text":454,"correct":29},"高强防水混凝土",{"key":31,"text":456,"correct":22},"外加剂或掺合料防水混凝土",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},1263705,"在铺贴卷材防水层时应采用搭接方法,各层卷材长边和短边搭接的最短宽度分别小于____mm。",[461,463,465,467],{"key":20,"text":462,"correct":29},"70,100",{"key":24,"text":464,"correct":22},"70,80",{"key":27,"text":466,"correct":22},"60,100",{"key":31,"text":468,"correct":22},"100,70",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1263706,"当屋面坡度大于15%或者受振动时,为防止卷材下滑,防水卷材的铺贴要求为( )。",[473,475,477,479],{"key":20,"text":474,"correct":22},"平行于屋脊",{"key":24,"text":476,"correct":29},"垂直于屋脊",{"key":27,"text":478,"correct":22},"中间平行于屋脊,靠墙处垂直于屋脊",{"key":31,"text":480,"correct":22},"中间垂直于屋脊,靠墙处平行于屋脊",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1263707,"关于防水卷材的铺贴方法说法中,正确的是( )。",[485,487,489,491],{"key":20,"text":486,"correct":22},"当屋面坡度小于3%时,宜垂直于屋脊铺贴",{"key":24,"text":488,"correct":29},"屋面坡度在3%～15%时,卷材可平行于或垂直于屋脊铺贴",{"key":27,"text":490,"correct":22},"当屋面坡度大于15%或屋面受振动时,应平行于屋脊铺贴",{"key":31,"text":492,"correct":22},"上下层卷材可相互垂直铺贴",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":31,"analysis":33},1263708,"钢柱校正工作不包括( )。",[497,499,501,503],{"key":20,"text":498,"correct":22},"柱基标高调整",{"key":24,"text":500,"correct":22},"对准纵横十字线",{"key":27,"text":502,"correct":22},"柱身垂直度",{"key":31,"text":504,"correct":29},"柱身高度",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},1263709,"钢结构的连接方法不包括( )。",[509,511,513,515],{"key":20,"text":510,"correct":29},"机械连接",{"key":24,"text":512,"correct":22},"焊接连接",{"key":27,"text":514,"correct":22},"螺栓连接",{"key":31,"text":516,"correct":22},"铆钉连接",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},1263710,"砖砌体的施工工艺过程正确的是( )。",[521,523,525,527],{"key":20,"text":522,"correct":22},"抄平、放线、摆砖、盘角、挂线、立皮数杆、砌筑、勾缝、清理等",{"key":24,"text":524,"correct":29},"抄平、放线、摆砖、立皮数杆、盘角、挂线、砌筑、勾缝、清理等",{"key":27,"text":526,"correct":22},"抄平、放线、摆砖、立皮数杆、挂线、盘角、砌筑、勾缝、清理等",{"key":31,"text":528,"correct":22},"抄平、放线、立皮数杆、摆砖、盘角、挂线、砌筑、勾缝、清理等",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1263711,"后张法施工工艺中,其主要工序不包括( )。",[533,535,537,539],{"key":20,"text":534,"correct":29},"浇筑混凝土",{"key":24,"text":536,"correct":22},"预留孔道",{"key":27,"text":538,"correct":22},"预应力筋张拉",{"key":31,"text":540,"correct":22},"孔道灌浆",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},1263712,"大体积混凝土结构的浇筑方案不包含( )。",[545,547,549,551],{"key":20,"text":546,"correct":22},"全面分层",{"key":24,"text":548,"correct":22},"分段分层",{"key":27,"text":550,"correct":22},"斜面分层",{"key":31,"text":552,"correct":29},"分区分层",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1263713,"施工缝一般应留在结构( )的部位。",[557,559,561,563],{"key":20,"text":558,"correct":22},"受压较小、便于施工",{"key":24,"text":560,"correct":29},"受剪较小、便于施工",{"key":27,"text":562,"correct":22},"受弯较小、便于施工",{"key":31,"text":564,"correct":22},"受扭较小、便于施工",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1263714,"关于混凝土浇筑的说法中错误的是( )。",[569,571,573,575],{"key":20,"text":570,"correct":22},"混凝土的浇筑工作应尽可能连续进行",{"key":24,"text":572,"correct":22},"若上下层或前后层混凝土浇筑必须间歇,其间歇时间应尽量缩短",{"key":27,"text":574,"correct":22},"要在前层（下层）混凝土凝结（终凝）前,将次层混凝土浇筑完毕",{"key":31,"text":576,"correct":29},"浇筑竖向结构混凝土前,应先在底部填筑一层20～50mm厚、与混凝土内砂浆成分相同的水泥砂浆,然后再浇筑混凝土。",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":27,"analysis":33},1263715,"当混凝土浇筑深度超过( )m时,应采用带节管的振动串筒,即在串筒上每隔2～3节管安装一台振动器。",[581,583,585,587],{"key":20,"text":582,"correct":22},"6",{"key":24,"text":584,"correct":22},"7",{"key":27,"text":586,"correct":29},"8",{"key":31,"text":588,"correct":22},"9",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},1263716,"混凝土自高处倾落时的自由倾落高度不宜超过( )m。",[593,594,595,596],{"key":20,"text":378,"correct":22},{"key":24,"text":380,"correct":29},{"key":27,"text":382,"correct":22},{"key":31,"text":384,"correct":22},{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},1263717,"混凝土搅拌时,常用的投料顺序不包括( )。",[601,603,605,607],{"key":20,"text":602,"correct":22},"一次投料法",{"key":24,"text":604,"correct":22},"水泥裹砂法",{"key":27,"text":606,"correct":22},"二次投料法",{"key":31,"text":608,"correct":29},"三次投料法",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]