[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,2,50,395,[13,34,46,58,70,82,94,106,118,130,142,154,166,176,188,200,212,224,236,248,260,270,281,293,302,310,322,334,346,358,370,382,394,406,418,430,442,454,465,477,486,498,510,522,534,545,557,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1263618,1,"单选题","在工程网络计划中,下列关于关键线路的说法错误的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","双代号网络计划中总持续时间最长",false,{"key":24,"text":25,"correct":22},"B","相邻的两项工作之间时间间隔均为零",{"key":27,"text":28,"correct":29},"C","单代号网络计划中由关键工作组成",true,{"key":31,"text":32,"correct":22},"D","时标网络计划中自始至终无波形线","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1263619,"下列不属于施工进度计划的调整方法的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":29},"加强安全教育",{"key":24,"text":41,"correct":22},"增加资源投入",{"key":27,"text":43,"correct":22},"增减工作范围",{"key":31,"text":45,"correct":22},"提高劳动效率",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1263620,"流水施工的基本参数不包括下列哪一项( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"时间参数",{"key":24,"text":53,"correct":29},"技术参数",{"key":27,"text":55,"correct":22},"工艺参数",{"key":31,"text":57,"correct":22},"空间参数",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1263621,"资源配置计划不包括下列哪一项( )。",[62,64,66,68],{"key":20,"text":63,"correct":29},"临时设施计划",{"key":24,"text":65,"correct":22},"主要材料配置计划",{"key":27,"text":67,"correct":22},"施工机具配置计划",{"key":31,"text":69,"correct":22},"构配件配置计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1263622,"均衡施工的指标不包括( )。",[74,76,78,80],{"key":20,"text":75,"correct":29},"均衡系数",{"key":24,"text":77,"correct":22},"不均衡系数",{"key":27,"text":79,"correct":22},"极差值",{"key":31,"text":81,"correct":22},"均方差值",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1263623,"工程项目资源管理的内容不包括( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"人力资源管理",{"key":24,"text":89,"correct":22},"材料管理",{"key":27,"text":91,"correct":22},"机械设备管理",{"key":31,"text":93,"correct":29},"环境管理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1263624,"工程项目资源的特点不包括( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程所需资源的种类多、需求量大",{"key":24,"text":101,"correct":29},"工程所需资金的数量大",{"key":27,"text":103,"correct":22},"工程项目建设过程的不均衡性",{"key":31,"text":105,"correct":22},"资源对项目成本的影响大",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1263625,"施工任务书是向班组下达任务,实行责任承包、全面管理和原始记录的综合性文件,它是计划和实施的纽带,其不包括( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"施工任务单",{"key":24,"text":113,"correct":22},"限额领料单",{"key":27,"text":115,"correct":22},"考勤表",{"key":31,"text":117,"correct":29},"施工进度表",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1263626,"施工任务书是向班组下达任务,实行责任承包、全面管理和原始记录的综合性文件,应由( )按班组编制并下达。",[122,124,126,128],{"key":20,"text":123,"correct":22},"项目经理",{"key":24,"text":125,"correct":29},"施工员",{"key":27,"text":127,"correct":22},"监理员",{"key":31,"text":129,"correct":22},"监理工程师",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1263627,"施工进度计划的审核内容不包括( )。",[134,136,138,140],{"key":20,"text":135,"correct":29},"进度安排是否符合上级规定",{"key":24,"text":137,"correct":22},"施工进度计划中的内容是否有遗漏,分期施工是否满足分批交工的需要和配套交工的要求",{"key":27,"text":139,"correct":22},"施工顺序安排是否符合施工程序的要求",{"key":31,"text":141,"correct":22},"资源供应计划是否能保证施工进度计划的实现,供应是否均衡,分包人供应的资源是否满足进度要求",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1263628,"下列( )不属于施工进度计划编制依据。",[146,148,150,152],{"key":20,"text":147,"correct":22},"约束条件",{"key":24,"text":149,"correct":22},"工程的工期要求及开工、竣工日期",{"key":27,"text":151,"correct":22},"资源需求",{"key":31,"text":153,"correct":29},"施工方法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1263629,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种,其中整体顺序自上而下的施工优点有( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"可以与主体结构平行搭接施工",{"key":24,"text":161,"correct":29},"有利于施工安全",{"key":27,"text":163,"correct":22},"可以缩短工期",{"key":31,"text":165,"correct":22},"工序交叉作业多",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1263630,"室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种,其中整体顺序自下而上的施工优点有( )。",[170,172,173,174],{"key":20,"text":171,"correct":22},"便于组织施工",{"key":24,"text":161,"correct":22},{"key":27,"text":163,"correct":29},{"key":31,"text":175,"correct":22},"减少或避免各工种操作互相交叉",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1263631,"确定施工顺序的基本要求不包括( )。",[180,182,184,186],{"key":20,"text":181,"correct":22},"必须符合施工工艺的要求",{"key":24,"text":183,"correct":22},"必须与施工方法协调一致",{"key":27,"text":185,"correct":22},"必须考虑当地的气候条件",{"key":31,"text":187,"correct":29},"必须考虑文明施工的要求",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},1263632,"以下关于确定施工顺序应遵循的基本原则说法错误的是( )。",[192,194,196,198],{"key":20,"text":193,"correct":22},"先地下,后地上",{"key":24,"text":195,"correct":29},"先围护,后主体",{"key":27,"text":197,"correct":22},"先结构,后装修",{"key":31,"text":199,"correct":22},"先土建,后设备",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1263633,"划分施工段的基本原则不包括( )。",[204,206,208,210],{"key":20,"text":205,"correct":22},"施工段的数目要合理",{"key":24,"text":207,"correct":29},"要有利于结构的局部性",{"key":27,"text":209,"correct":22},"要有足够的工作面",{"key":31,"text":211,"correct":22},"以主导施工过程为依据进行划分",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1263634,"划分施工段的基本原则是各施工段的劳动量（或工程量）要大致相等,相差宜在( )以内。",[216,218,220,222],{"key":20,"text":217,"correct":22},"10%",{"key":24,"text":219,"correct":29},"15%",{"key":27,"text":221,"correct":22},"20%",{"key":31,"text":223,"correct":22},"25%",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1263635,"按《高层建筑混凝土结构技术规程》JGJ3要求,高层、超高层建筑轴线竖向投测每层允许偏差为( )mm。",[228,230,232,234],{"key":20,"text":229,"correct":22},"2",{"key":24,"text":231,"correct":29},"3",{"key":27,"text":233,"correct":22},"4",{"key":31,"text":235,"correct":22},"5",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},1263636,"深基坑施工中变形观测的内容不包括( )。",[240,242,244,246],{"key":20,"text":241,"correct":22},"支护结构顶部的水平位移观测",{"key":24,"text":243,"correct":22},"邻近建筑物的垂直位移、倾斜、裂缝观测",{"key":27,"text":245,"correct":22},"支护结构的倾斜观测",{"key":31,"text":247,"correct":29},"支护结构的挠度观测",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},1263637,"建筑物主体结构施工中,监测的主要内容不包括建筑物的( )。",[252,254,256,258],{"key":20,"text":253,"correct":29},"水平位移",{"key":24,"text":255,"correct":22},"垂直位移",{"key":27,"text":257,"correct":22},"倾斜",{"key":31,"text":259,"correct":22},"挠度",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1263638,"分部、分项工程施工技术交底,是在工程施工前,由( )对施工队长进行的交底。",[264,265,266,268],{"key":20,"text":125,"correct":29},{"key":24,"text":127,"correct":22},{"key":27,"text":267,"correct":22},"安全员",{"key":31,"text":269,"correct":22},"资料员",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1263639,"设计交底是在建设单位主持下,由设计单位向( )进行的交底,主要交代建筑物的功能与特点、设计意图与要求等。",[274,276,278,279],{"key":20,"text":275,"correct":22},"建设单位",{"key":24,"text":277,"correct":29},"施工单位",{"key":27,"text":123,"correct":22},{"key":31,"text":280,"correct":22},"监理单位",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1263640,"施工技术交底的分类不包括( )。",[285,287,289,291],{"key":20,"text":286,"correct":22},"设计交底",{"key":24,"text":288,"correct":22},"施工组织设计交底",{"key":27,"text":290,"correct":22},"分部、分项工程施工技术交底",{"key":31,"text":292,"correct":29},"单位工程施工技术交底",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":27,"analysis":33},1263641,"图纸会审的程序是设计单位作设计交底,( )对图纸提出问题,有关单位发表意见,与会审者讨论、研究、协商逐条解决问题达成共识,组织会审的单位汇总成文等。",[297,298,300,301],{"key":20,"text":275,"correct":22},{"key":24,"text":299,"correct":22},"设计单位",{"key":27,"text":277,"correct":29},{"key":31,"text":280,"correct":22},{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},1263642,"图纸会审一般由( )组织,并主持会议,其他单位参加。",[306,307,308,309],{"key":20,"text":275,"correct":29},{"key":24,"text":299,"correct":22},{"key":27,"text":277,"correct":22},{"key":31,"text":280,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1263643,"梁的平法标注中,部分标注为KL3(2A)300×650,则以下关于该梁的说法中错误的是( )。",[314,316,318,320],{"key":20,"text":315,"correct":22},"两跨一端悬挑",{"key":24,"text":317,"correct":29},"两跨两端悬挑",{"key":27,"text":319,"correct":22},"梁的截面尺寸为300x650",{"key":31,"text":321,"correct":22},"梁的编号为3",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1263644,"在梁的平法标注中,梁的标注一般是集中标注和原位标准相结合,其中集中标注内容中有五项必注值和一项选注值,则下列哪一项是选注值( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"梁的编号",{"key":24,"text":329,"correct":29},"梁顶面标高高差",{"key":27,"text":331,"correct":22},"梁上部通长筋或架立筋配置",{"key":31,"text":333,"correct":22},"梁的箍筋",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1263645,"建筑工程施工图的识读方法中不包括下列哪一项( )。",[338,340,342,344],{"key":20,"text":339,"correct":22},"总体了解",{"key":24,"text":341,"correct":22},"前后对照",{"key":27,"text":343,"correct":29},"详图细读",{"key":31,"text":345,"correct":22},"顺序识读",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},1263646,"以下关于各专业施工图的排列顺序说法错误的是( )。",[350,352,354,356],{"key":20,"text":351,"correct":22},"基础图在前,详图在后",{"key":24,"text":353,"correct":22},"总体图在前,局部图在后",{"key":27,"text":355,"correct":29},"次要部分在前,主要部分在后",{"key":31,"text":357,"correct":22},"先施工的在前,后施工的在后",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},1263647,"结构施工图一般不包括( )。",[362,364,366,368],{"key":20,"text":363,"correct":22},"结构设计图纸目录",{"key":24,"text":365,"correct":22},"结构设计总说明",{"key":27,"text":367,"correct":22},"结构平面图",{"key":31,"text":369,"correct":29},"结构剖面图",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},1263648,"结构设计总说明中不包括( )。",[374,376,378,380],{"key":20,"text":375,"correct":22},"设计的主要依据",{"key":24,"text":377,"correct":22},"活荷载取值",{"key":27,"text":379,"correct":22},"人防工程抗力等级",{"key":31,"text":381,"correct":29},"防火等级",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1263649,"非承重构件（柱、梁侧模）的模板拆除时,其结构强度不得低于( )MPA,且不得损坏棱角。",[386,388,390,392],{"key":20,"text":387,"correct":22},"1.0",{"key":24,"text":389,"correct":29},"1.2",{"key":27,"text":391,"correct":22},"1.5",{"key":31,"text":393,"correct":22},"2.0",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1263650,"梁的底模板为承重模板,跨度小于8m的梁底模板拆除时间是当混凝土强度达到设计强度的( )时才能拆除。",[398,400,402,404],{"key":20,"text":399,"correct":22},"80%",{"key":24,"text":401,"correct":22},"100%",{"key":27,"text":403,"correct":22},"50%",{"key":31,"text":405,"correct":29},"70%",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1263651,"根据《危险性较大的分部分项工程安全整理办法》规定:脚手架高度( )m及以上落地式钢管脚手架工程需编制专项方案。",[410,412,414,416],{"key":20,"text":411,"correct":29},"24",{"key":24,"text":413,"correct":22},"20",{"key":27,"text":415,"correct":22},"18",{"key":31,"text":417,"correct":22},"26",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},1263652,"土钉支护的施工特点不包括( )。",[422,424,426,428],{"key":20,"text":423,"correct":22},"施工设备较简单",{"key":24,"text":425,"correct":22},"比用挡土桩锚杆施工简便",{"key":27,"text":427,"correct":29},"施工速度较慢",{"key":31,"text":429,"correct":22},"节省工期",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},1263653,"施工现场入口处的醒目位置,应公示“五牌”、“二图”,其中“五牌”不包括下列哪一项( )。",[434,436,438,440],{"key":20,"text":435,"correct":22},"建设项目概况牌",{"key":24,"text":437,"correct":22},"安全纪律牌",{"key":27,"text":439,"correct":22},"防火须知牌",{"key":31,"text":441,"correct":29},"项目经理部组织架构及主要管理人员名单牌",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},1263654,"单位工程施工平面图设计的步骤不包括下列哪一项( )。",[446,448,450,452],{"key":20,"text":447,"correct":22},"确定起重机的位置",{"key":24,"text":449,"correct":29},"确定工地出人口位置",{"key":27,"text":451,"correct":22},"布置水电管线",{"key":31,"text":453,"correct":22},"确定运输道路的布置",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},1263655,"施工现场入口处的醒目位置,应公示“五牌”、“二图”,其中“二图”指的是项目经理部组织架构及主要管理人员名单图和( )。",[458,460,462,463],{"key":20,"text":459,"correct":29},"施工总平面图",{"key":24,"text":461,"correct":22},"建筑鸟瞰图",{"key":27,"text":367,"correct":22},{"key":31,"text":464,"correct":22},"建筑总平面图",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1263656,"施工准备工作是单位工程资源准备的重要内容,其中不包括( )。",[469,471,473,475],{"key":20,"text":470,"correct":22},"材料准备",{"key":24,"text":472,"correct":29},"资金准备",{"key":27,"text":474,"correct":22},"技术准备",{"key":31,"text":476,"correct":22},"机械设备准备",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},1263657,"组织现场施工人员配置工程所需的计量、测量、检测试验等仪器和仪表,属于施工准备工作中的( )。",[481,482,484,485],{"key":20,"text":470,"correct":22},{"key":24,"text":483,"correct":22},"施工现场准备",{"key":27,"text":474,"correct":29},{"key":31,"text":476,"correct":22},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1263658,"项目施工协调是单位工程施工部署的重要内容,其中不包括( )。",[490,492,494,496],{"key":20,"text":491,"correct":22},"与建设单位的协调",{"key":24,"text":493,"correct":29},"与监理单位的协调",{"key":27,"text":495,"correct":22},"与监理工程师的协调",{"key":31,"text":497,"correct":22},"与设计单位的协调",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},1263659,"施工管理目标包括质量目标、社会行为目标等,其中下列哪一项不是社会行为目标包括的内容( )。",[502,504,506,508],{"key":20,"text":503,"correct":22},"无治安案例发生",{"key":24,"text":505,"correct":29},"无重大伤亡事故发生",{"key":27,"text":507,"correct":22},"无火灾、火警事故发生",{"key":31,"text":509,"correct":22},"无扰民事件发生",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},1263660,"施工管理目标是单位工程施工部署的重要内容,其目标不包括( )。",[514,516,518,520],{"key":20,"text":515,"correct":22},"质量目标",{"key":24,"text":517,"correct":22},"社会行为目标",{"key":27,"text":519,"correct":22},"工期目标",{"key":31,"text":521,"correct":29},"成本目标",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},1263661,"下列选项中,属于施工组织设计和专项施工方案的编制依据的是( )。",[526,528,530,532],{"key":20,"text":527,"correct":29},"施工图纸",{"key":24,"text":529,"correct":22},"建设工程监理合同",{"key":27,"text":531,"correct":22},"各项资源需求计划",{"key":31,"text":533,"correct":22},"单位工程施工组织设计",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},1263662,"某建筑工程公司作为总承包商承接了某高校新校区的全部工程项目,针对其中的综合楼建设所作的施工组织设计属于( )。",[538,540,541,543],{"key":20,"text":539,"correct":22},"施工规划",{"key":24,"text":533,"correct":29},{"key":27,"text":542,"correct":22},"施工组织总设计",{"key":31,"text":544,"correct":22},"分部分项工程施工组织设计",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},1263663,"施工组织设计和专项施工方案的主要技术经济指标不包括( )。",[549,551,553,555],{"key":20,"text":550,"correct":29},"施工技术指标",{"key":24,"text":552,"correct":22},"工期指标",{"key":27,"text":554,"correct":22},"成本指标",{"key":31,"text":556,"correct":22},"实物量消耗指标",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},1263664,"施工组织设计和专项施工方案的内容可粗可细,下列哪一项不是其内容( )。",[561,563,565,567],{"key":20,"text":562,"correct":22},"施工进度计划",{"key":24,"text":564,"correct":22},"施工方案",{"key":27,"text":566,"correct":29},"施工技术",{"key":31,"text":568,"correct":22},"目录",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":27,"analysis":33},1263665,"混凝土运输不包括( )。",[573,575,577,579],{"key":20,"text":574,"correct":22},"地面运输",{"key":24,"text":576,"correct":22},"楼面运输",{"key":27,"text":578,"correct":29},"水平运输",{"key":31,"text":580,"correct":22},"垂直运输",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":31,"analysis":33},1263666,"履带式起重机主要技术性能参数不包括( )。",[585,587,589,591],{"key":20,"text":586,"correct":22},"起重半径",{"key":24,"text":588,"correct":22},"起重量",{"key":27,"text":590,"correct":22},"起重高度",{"key":31,"text":592,"correct":29},"起重力矩",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},1263667,"自行式起重机的种类不包括( )。",[597,599,601,603],{"key":20,"text":598,"correct":22},"履带式起重机",{"key":24,"text":600,"correct":22},"汽车式起重机",{"key":27,"text":602,"correct":22},"轮胎式起重机",{"key":31,"text":604,"correct":29},"支架式起重机",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]