[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-849-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":585},{"id":5,"name":6,"category":7,"favorite":8},849,"土建方向-岗位技能","建筑工程",0,1,50,395,[13,33,45,53,61,72,84,96,105,117,129,141,153,165,177,189,201,213,225,234,245,257,268,280,291,301,313,325,337,349,361,369,381,393,403,413,422,434,446,458,470,482,492,504,516,527,538,550,562,574],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},1263566,"单选题","对施工日志的书写记录要求,下列说法错误的是( )。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","实事求是",false,{"key":23,"text":24,"correct":25},"B","图文结合",true,{"key":27,"text":28,"correct":21},"C","态度认真",{"key":30,"text":31,"correct":21},"D","字迹清楚","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":30,"analysis":32},1263567,"( )是施工人员提高文字书写水平的一个“练兵场”也是工程完成后书写工程或技术小结的查考依据,还是今后撰写论文的锻炼基础。",[37,39,41,43],{"key":19,"text":38,"correct":21},"施工文件",{"key":23,"text":40,"correct":21},"施工资料",{"key":27,"text":42,"correct":21},"施工照片",{"key":30,"text":44,"correct":25},"施工日志",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1263568,"( )是工程实施的写照,这份原始资料是当工程有什么问题或需要数字依据时的查考辅助资料。",[49,50,51,52],{"key":19,"text":44,"correct":25},{"key":23,"text":40,"correct":21},{"key":27,"text":42,"correct":21},{"key":30,"text":38,"correct":21},{"id":54,"libraryId":5,"type":9,"typeLabel":15,"stem":55,"options":56,"answer":19,"analysis":32},1263569,"( )是建筑产品的说明书,在必要时将对工程起重大作用。",[57,58,59,60],{"key":19,"text":44,"correct":25},{"key":23,"text":40,"correct":21},{"key":27,"text":42,"correct":21},{"key":30,"text":38,"correct":21},{"id":62,"libraryId":5,"type":9,"typeLabel":15,"stem":63,"options":64,"answer":27,"analysis":32},1263570,"施工资料是建筑工程在工程施工过程中形成的资料,下列哪一项不属于施工资料( )。",[65,67,69,70],{"key":19,"text":66,"correct":21},"施工管理资料",{"key":23,"text":68,"correct":21},"施工技术资料",{"key":27,"text":42,"correct":25},{"key":30,"text":71,"correct":21},"竣工验收资料",{"id":73,"libraryId":5,"type":9,"typeLabel":15,"stem":74,"options":75,"answer":30,"analysis":32},1263571,"建筑工程结构施工阶段噪声限值：白天施工不允许超过70dB(A)，夜间施工不允许超过( )。",[76,78,80,82],{"key":19,"text":77,"correct":21},"75dB(A)",{"key":23,"text":79,"correct":21},"85dB(A)",{"key":27,"text":81,"correct":21},"35dB(A)",{"key":30,"text":83,"correct":25},"55dB(A)",{"id":85,"libraryId":5,"type":9,"typeLabel":15,"stem":86,"options":87,"answer":19,"analysis":32},1263572,"建筑工程由于工程质量不合格、质量缺陷,必须进行返修、加固或报废处理,并造成或引发经济损失,当造成的直接经济损失在( )元（含选项）以上时称为工程质量事故。",[88,90,92,94],{"key":19,"text":89,"correct":25},"5000",{"key":23,"text":91,"correct":21},"7000",{"key":27,"text":93,"correct":21},"8000",{"key":30,"text":95,"correct":21},"10000",{"id":97,"libraryId":5,"type":9,"typeLabel":15,"stem":98,"options":99,"answer":23,"analysis":32},1263573,"建筑工程由于工程质量不合格、质量缺陷,必须进行返修、加固或报废处理,并造成或引发经济损失,当造成的直接经济损失低于( )元时称为工程质量问题。",[100,102,103,104],{"key":19,"text":101,"correct":21},"3000",{"key":23,"text":89,"correct":25},{"key":27,"text":91,"correct":21},{"key":30,"text":95,"correct":21},{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":23,"analysis":32},1263574,"施工现场安全警示标牌的设置原则不包括( )。",[109,111,113,115],{"key":19,"text":110,"correct":21},"标准",{"key":23,"text":112,"correct":25},"简单",{"key":27,"text":114,"correct":21},"便利",{"key":30,"text":116,"correct":21},"合理",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":19,"analysis":32},1263575,"施工现场危险源识别的方法有:专家调查法;安全检查表法;现场调查法;工作任务分析法等,其中专家调查法的优点是( )。",[121,123,125,127],{"key":19,"text":122,"correct":25},"简单易行",{"key":23,"text":124,"correct":21},"简单易懂",{"key":27,"text":126,"correct":21},"容易掌握",{"key":30,"text":128,"correct":21},"可以使安全检查做到系统化",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":27,"analysis":32},1263576,"施工现场危险源识别的方法有:专家调查法;安全检查表法;现场调查法;工作任务分析法等,其中( )是主要采用的方法。",[133,135,137,139],{"key":19,"text":134,"correct":21},"专家调查法",{"key":23,"text":136,"correct":21},"安全检查表法",{"key":27,"text":138,"correct":25},"现场调查法",{"key":30,"text":140,"correct":21},"工作任务分析法",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},1263577,"施工安全管理目标不包括下列哪一项( )。",[145,147,149,151],{"key":19,"text":146,"correct":21},"伤亡事故控制目标",{"key":23,"text":148,"correct":25},"预算达标目标",{"key":27,"text":150,"correct":21},"安全达标目标",{"key":30,"text":152,"correct":21},"文明施工实现目标",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":23,"analysis":32},1263578,"关于环境管理体系运行过程中培训工作应包括的内容,下列说法错误的是( )。",[157,159,161,163],{"key":19,"text":158,"correct":21},"提高认识的内容",{"key":23,"text":160,"correct":25},"提高专业技能的内容",{"key":27,"text":162,"correct":21},"提高环境技能的内容",{"key":30,"text":164,"correct":21},"明确工作内容及程序的内容",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":19,"analysis":32},1263579,"施工安全检查的方法不包括( )。",[169,171,173,175],{"key":19,"text":170,"correct":25},"照",{"key":23,"text":172,"correct":21},"看",{"key":27,"text":174,"correct":21},"量",{"key":30,"text":176,"correct":21},"现场操作",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":30,"analysis":32},1263580,"施工安全检查的内容不包括( )。",[181,183,185,187],{"key":19,"text":182,"correct":21},"查思想",{"key":23,"text":184,"correct":21},"查制度",{"key":27,"text":186,"correct":21},"查安全教育培训",{"key":30,"text":188,"correct":25},"查责任",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":23,"analysis":32},1263581,"建立安全管理体系的要求不包括( )。",[193,195,197,199],{"key":19,"text":194,"correct":21},"管理职责",{"key":23,"text":196,"correct":25},"施工方法控制",{"key":27,"text":198,"correct":21},"分包单位控制",{"key":30,"text":200,"correct":21},"施工过程控制",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":19,"analysis":32},1263582,"物料提升机的安全使用与管理要求规定,提升机安装后,应由( )组织有关人员按规范和设计的要求进行检查验收,确定合格后发给使用证,方可交付使用。",[205,207,209,211],{"key":19,"text":206,"correct":25},"主管部门",{"key":23,"text":208,"correct":21},"施工单位",{"key":27,"text":210,"correct":21},"监理单位",{"key":30,"text":212,"correct":21},"建设单位",{"id":214,"libraryId":5,"type":9,"typeLabel":15,"stem":215,"options":216,"answer":27,"analysis":32},1263583,"施工升降机的安全使用和管理规定,风力达( )级以上,应停止使用升降机,并将吊笼降至地面。",[217,219,221,223],{"key":19,"text":218,"correct":21},"4",{"key":23,"text":220,"correct":21},"5",{"key":27,"text":222,"correct":25},"6",{"key":30,"text":224,"correct":21},"7",{"id":226,"libraryId":5,"type":9,"typeLabel":15,"stem":227,"options":228,"answer":19,"analysis":32},1263584,"施工升降机的安全使用和管理规定,驾驶升降机的司机应为( )培训合格的专职人员,严禁无证操作。",[229,231,232,233],{"key":19,"text":230,"correct":25},"有关行政主管部门",{"key":23,"text":208,"correct":21},{"key":27,"text":210,"correct":21},{"key":30,"text":212,"correct":21},{"id":235,"libraryId":5,"type":9,"typeLabel":15,"stem":236,"options":237,"answer":23,"analysis":32},1263585,"建筑施工安全用电管理的基本要求规定,施工现场应视工程量大小和工期长短,必须配备不少于( )名持有市、地劳动安全监察部门核发电工证的电工。",[238,240,242,244],{"key":19,"text":239,"correct":21},"1",{"key":23,"text":241,"correct":25},"2",{"key":27,"text":243,"correct":21},"3",{"key":30,"text":218,"correct":21},{"id":246,"libraryId":5,"type":9,"typeLabel":15,"stem":247,"options":248,"answer":19,"analysis":32},1263586,"建筑施工安全用电管理的基本要求规定,施工现场的一切电气线路、用电设备的安装和维护必须由( )负责,并严格执行施工组织设计的规定。",[249,251,253,255],{"key":19,"text":250,"correct":25},"持证电工",{"key":23,"text":252,"correct":21},"施工员",{"key":27,"text":254,"correct":21},"任意电工",{"key":30,"text":256,"correct":21},"安全员",{"id":258,"libraryId":5,"type":9,"typeLabel":15,"stem":259,"options":260,"answer":27,"analysis":32},1263587,"建筑施工安全用电管理的基本要求规定,施工现场必须按工程特点编制施工临时用电施工组织设计,并由( )审核后实施。",[261,263,265,266],{"key":19,"text":262,"correct":21},"项目经理",{"key":23,"text":264,"correct":21},"监理工程师",{"key":27,"text":206,"correct":25},{"key":30,"text":267,"correct":21},"建设单位负责人",{"id":269,"libraryId":5,"type":9,"typeLabel":15,"stem":270,"options":271,"answer":30,"analysis":32},1263588,"三级安全教育是指公司、项目经理部、施工班组三个层次的安全教育。其中施工班组教育的内容不包括( )。",[272,274,276,278],{"key":19,"text":273,"correct":21},"事故案例剖析",{"key":23,"text":275,"correct":21},"岗位讲评",{"key":27,"text":277,"correct":21},"劳动纪律",{"key":30,"text":279,"correct":25},"工地安全制度",{"id":281,"libraryId":5,"type":9,"typeLabel":15,"stem":282,"options":283,"answer":27,"analysis":32},1263589,"三级安全教育是指公司、项目经理部、施工班组三个层次的安全教育。其中项目经理部教育的内容不包括( )。",[284,286,288,290],{"key":19,"text":285,"correct":21},"施工现场环境",{"key":23,"text":287,"correct":21},"工程施工特点",{"key":27,"text":289,"correct":25},"企业的安全规章制度",{"key":30,"text":279,"correct":21},{"id":292,"libraryId":5,"type":9,"typeLabel":15,"stem":293,"options":294,"answer":30,"analysis":32},1263590,"三级安全教育是指公司、项目经理部、施工班组三个层次的安全教育。其中公司教育的内容不包括( )。",[295,297,299,300],{"key":19,"text":296,"correct":21},"国家有关安全生产方针",{"key":23,"text":298,"correct":21},"地方有关安全生产方针",{"key":27,"text":289,"correct":21},{"key":30,"text":279,"correct":25},{"id":302,"libraryId":5,"type":9,"typeLabel":15,"stem":303,"options":304,"answer":27,"analysis":32},1263591,"对洞口的防护设施的具体要求有,边长在( )Cm以上的洞口,四周应设防护栏杆,洞口下方设安全平网。",[305,307,309,311],{"key":19,"text":306,"correct":21},"100",{"key":23,"text":308,"correct":21},"120",{"key":27,"text":310,"correct":25},"150",{"key":30,"text":312,"correct":21},"200",{"id":314,"libraryId":5,"type":9,"typeLabel":15,"stem":315,"options":316,"answer":23,"analysis":32},1263592,"对洞口的防护设施的具体要求有,楼板、屋面和平台等面上短边尺寸小于( )Cm但大于( )Cm的孔口,必须用坚实的盖板盖严,盖板应能防止挪动移位。",[317,319,321,323],{"key":19,"text":318,"correct":21},"25,3.0",{"key":23,"text":320,"correct":25},"25,2.5",{"key":27,"text":322,"correct":21},"30,2.5",{"key":30,"text":324,"correct":21},"30,3.0",{"id":326,"libraryId":5,"type":9,"typeLabel":15,"stem":327,"options":328,"answer":23,"analysis":32},1263593,"对达到一定规模的危险性较大的分部分项工程应编制专项施工方案,并附安全验算结果。这些工程不包括( )。",[329,331,333,335],{"key":19,"text":330,"correct":21},"土方开挖工程",{"key":23,"text":332,"correct":25},"钢筋工程",{"key":27,"text":334,"correct":21},"爆破工程",{"key":30,"text":336,"correct":21},"模板工程",{"id":338,"libraryId":5,"type":9,"typeLabel":15,"stem":339,"options":340,"answer":19,"analysis":32},1263594,"一般工程安全技术措施的编制应考虑的内容不包括( )。",[341,343,345,347],{"key":19,"text":342,"correct":25},"浅基坑作业的防护",{"key":23,"text":344,"correct":21},"施工用电安全",{"key":27,"text":346,"correct":21},"机械设备的安全使用",{"key":30,"text":348,"correct":21},"防火防爆措施",{"id":350,"libraryId":5,"type":9,"typeLabel":15,"stem":351,"options":352,"answer":30,"analysis":32},1263595,"施工安全技术措施应具有很多特性,其中不包括( )。",[353,355,357,359],{"key":19,"text":354,"correct":21},"超前性",{"key":23,"text":356,"correct":21},"可靠性",{"key":27,"text":358,"correct":21},"针对性",{"key":30,"text":360,"correct":25},"稳定性",{"id":362,"libraryId":5,"type":9,"typeLabel":15,"stem":363,"options":364,"answer":30,"analysis":32},1263596,"建设工程施工前,( )应当对工程项目的概况、危险部位和施工技术要求、作业安全注意事项安全施工的技术要求向施工作业班组、作业人员做出详细说明,并由双方签字确认,以保证施工质量和安全生产。",[365,366,367,368],{"key":19,"text":262,"correct":21},{"key":23,"text":264,"correct":21},{"key":27,"text":256,"correct":21},{"key":30,"text":252,"correct":25},{"id":370,"libraryId":5,"type":9,"typeLabel":15,"stem":371,"options":372,"answer":27,"analysis":32},1263597,"关于安全技术交底的基本要求,下列说法错误的是( )。",[373,375,377,379],{"key":19,"text":374,"correct":21},"安全技术交底应实施签字制度",{"key":23,"text":376,"correct":21},"安全技术交底必须贯穿于施工全过程、全方位",{"key":27,"text":378,"correct":25},"安全技术交底内容必须具体、明确、针对性强",{"key":30,"text":380,"correct":21},"安全技术交底须分级进行",{"id":382,"libraryId":5,"type":9,"typeLabel":15,"stem":383,"options":384,"answer":19,"analysis":32},1263598,"施工质量计划的内容一般不包括( )。",[385,387,389,391],{"key":19,"text":386,"correct":25},"工程概况及施工过程分析",{"key":23,"text":388,"correct":21},"工程检测项目计划及方法",{"key":27,"text":390,"correct":21},"材料设备质量管理及控制措施",{"key":30,"text":392,"correct":21},"质量管理组织机构、人员及资源配置计划",{"id":394,"libraryId":5,"type":9,"typeLabel":15,"stem":395,"options":396,"answer":23,"analysis":32},1263599,"施工现场实测法的手段可归纳为靠、吊、量和( )。",[397,398,400,402],{"key":19,"text":172,"correct":21},{"key":23,"text":399,"correct":25},"套",{"key":27,"text":401,"correct":21},"敲",{"key":30,"text":170,"correct":21},{"id":404,"libraryId":5,"type":9,"typeLabel":15,"stem":405,"options":406,"answer":30,"analysis":32},1263600,"施工现场目测法的手段可归纳为看、敲、摸和( )。",[407,409,411,412],{"key":19,"text":408,"correct":21},"吊",{"key":23,"text":410,"correct":21},"靠",{"key":27,"text":174,"correct":21},{"key":30,"text":170,"correct":25},{"id":414,"libraryId":5,"type":9,"typeLabel":15,"stem":415,"options":416,"answer":19,"analysis":32},1263601,"某公司承接一公寓工程,则该工程的施工进度计划应由( )编制。",[417,419,420,421],{"key":19,"text":418,"correct":25},"施工承包企业",{"key":23,"text":212,"correct":21},{"key":27,"text":210,"correct":21},{"key":30,"text":262,"correct":21},{"id":423,"libraryId":5,"type":9,"typeLabel":15,"stem":424,"options":425,"answer":23,"analysis":32},1263602,"施工过程中,工序质量控制的步骤不包括( )。",[426,428,430,432],{"key":19,"text":427,"correct":21},"实测",{"key":23,"text":429,"correct":25},"计算",{"key":27,"text":431,"correct":21},"分析",{"key":30,"text":433,"correct":21},"判断",{"id":435,"libraryId":5,"type":9,"typeLabel":15,"stem":436,"options":437,"answer":30,"analysis":32},1263603,"材料质量控制的内容不包括下列哪一项( )。",[438,440,442,444],{"key":19,"text":439,"correct":21},"控制材料的性能、标准与设计文件的相符性",{"key":23,"text":441,"correct":21},"控制材料进场验收程序及质量文件资料的齐全程度",{"key":27,"text":443,"correct":21},"控制材料各项技术性能指标、检验测试指标与标准要求的相符性",{"key":30,"text":445,"correct":25},"控制材料的力学性能满足要求",{"id":447,"libraryId":5,"type":9,"typeLabel":15,"stem":448,"options":449,"answer":23,"analysis":32},1263604,"施工单位现场质量检查的内容不包括下列哪一项( )。",[450,452,454,456],{"key":19,"text":451,"correct":21},"成品保护检查",{"key":23,"text":453,"correct":25},"开工后检查",{"key":27,"text":455,"correct":21},"工序交接检查",{"key":30,"text":457,"correct":21},"停工后复工前的检查",{"id":459,"libraryId":5,"type":9,"typeLabel":15,"stem":460,"options":461,"answer":19,"analysis":32},1263605,"关于屋面卷材防水工程出屋面管道处的施工质量控制应符合的规定,下列说法错误的是( )。",[462,464,466,468],{"key":19,"text":463,"correct":25},"管道根部直径500mm口范围内,找平层应抹出高度不小于20mm的圆台",{"key":23,"text":465,"correct":21},"管道周围与找平层或细石混凝土防水层之间,应预留20mm×20mm的凹槽,并用密封材料嵌填严密",{"key":27,"text":467,"correct":21},"管道根部四周应增设附加层,宽度和高度均不应小于300mm",{"key":30,"text":469,"correct":21},"管道上的防水层收头处应用金属箍箍紧,并用密封材料封严",{"id":471,"libraryId":5,"type":9,"typeLabel":15,"stem":472,"options":473,"answer":23,"analysis":32},1263606,"质量控制点是施工质量控制的重点,下列关于质量控制点进行质量控制的步骤说法错误的是( )。",[474,476,478,480],{"key":19,"text":475,"correct":21},"全面分析、比较拟建工程情况,明确质量控制点",{"key":23,"text":477,"correct":25},"对关键部位,薄弱环节重点控制",{"key":27,"text":479,"correct":21},"针对隐患的原因,提出相应对策,采取措施加以预防",{"key":30,"text":481,"correct":21},"进一步分析所设置的质量控制点在施工中可能出现的质量问题或质量隐患,以及产生的原因",{"id":483,"libraryId":5,"type":9,"typeLabel":15,"stem":484,"options":485,"answer":27,"analysis":32},1263607,"某工程项目桩基工程采用套管成孔灌注桩,为了保证施工质量,桩管灌满混凝土后开始拔管,按照规定,管内应保持不少于( )m高的混凝土。",[486,487,489,490],{"key":19,"text":239,"correct":21},{"key":23,"text":488,"correct":21},"1.5",{"key":27,"text":241,"correct":25},{"key":30,"text":491,"correct":21},"2.5",{"id":493,"libraryId":5,"type":9,"typeLabel":15,"stem":494,"options":495,"answer":30,"analysis":32},1263608,"某工程项目桩基工程采用套管成孔灌注桩,则按照规定,预制桩尖的混凝土强度等级应大于( )。",[496,498,500,502],{"key":19,"text":497,"correct":21},"C35",{"key":23,"text":499,"correct":21},"C25",{"key":27,"text":501,"correct":21},"C40",{"key":30,"text":503,"correct":25},"C30",{"id":505,"libraryId":5,"type":9,"typeLabel":15,"stem":506,"options":507,"answer":27,"analysis":32},1263609,"质量交底包括质量验收标准和( )。",[508,510,512,514],{"key":19,"text":509,"correct":21},"质量手册",{"key":23,"text":511,"correct":21},"质量验收目标",{"key":27,"text":513,"correct":25},"施工技术",{"key":30,"text":515,"correct":21},"施工方法",{"id":517,"libraryId":5,"type":9,"typeLabel":15,"stem":518,"options":519,"answer":23,"analysis":32},1263611,"在质量管理体系中使用四类文件,按其适用的范围可分为通用性文件和专用性文件,下列选项中属于专项性文件的是( )。",[520,521,523,525],{"key":19,"text":509,"correct":21},{"key":23,"text":522,"correct":25},"质量计划",{"key":27,"text":524,"correct":21},"程序文件",{"key":30,"text":526,"correct":21},"质量方针政策",{"id":528,"libraryId":5,"type":9,"typeLabel":15,"stem":529,"options":530,"answer":19,"analysis":32},1263612,"质量控制文件主要用以表述保证和提高项目质量的文件,不包括与项目质量有关的( )。",[531,532,534,536],{"key":19,"text":38,"correct":25},{"key":23,"text":533,"correct":21},"设计文件",{"key":27,"text":535,"correct":21},"工艺文件",{"key":30,"text":537,"correct":21},"研究试验文件",{"id":539,"libraryId":5,"type":9,"typeLabel":15,"stem":540,"options":541,"answer":23,"analysis":32},1263613,"我国现行的工程价款主要结算方式不包括( )。",[542,544,546,548],{"key":19,"text":543,"correct":21},"按月结算",{"key":23,"text":545,"correct":25},"按年结算",{"key":27,"text":547,"correct":21},"分段结算",{"key":30,"text":549,"correct":21},"竣工后一次结算",{"id":551,"libraryId":5,"type":9,"typeLabel":15,"stem":552,"options":553,"answer":30,"analysis":32},1263614,"规费是指政府和有关权力部门规定必须缴纳的费用。下列不属于规费内容的是( )。",[554,556,558,560],{"key":19,"text":555,"correct":21},"工程排污费",{"key":23,"text":557,"correct":21},"噪声干扰费",{"key":27,"text":559,"correct":21},"社会保障费",{"key":30,"text":561,"correct":25},"材料费",{"id":563,"libraryId":5,"type":9,"typeLabel":15,"stem":564,"options":565,"answer":23,"analysis":32},1263616,"下列不属于施工进度计划检查方法的是( )。",[566,568,570,572],{"key":19,"text":567,"correct":21},"跟踪检查施工实际进度",{"key":23,"text":569,"correct":25},"因果分析法",{"key":27,"text":571,"correct":21},"对比分析实际进度与计划进度",{"key":30,"text":573,"correct":21},"整理统计检查数据",{"id":575,"libraryId":5,"type":9,"typeLabel":15,"stem":576,"options":577,"answer":30,"analysis":32},1263617,"施工作业计划分月施工作业计划和旬（周）施工作业计划。下列选项中不属于其内容的为( )。",[578,580,582,584],{"key":19,"text":579,"correct":21},"本月、旬（周）应完成的施工任务",{"key":23,"text":581,"correct":21},"完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量",{"key":27,"text":583,"correct":21},"提高劳动生产率的措施和节约措施",{"key":30,"text":522,"correct":25},[586,589,592,595,598,601],{"id":9,"name":587,"category":7,"favorite":588},"领导干部任职前廉政法规知识测试题",92,{"id":590,"name":591,"category":7,"favorite":9},595,"建筑结构与设备",{"id":593,"name":594,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":596,"name":597,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":599,"name":600,"category":7,"favorite":8},534,"BIM工程师",{"id":602,"name":600,"category":7,"favorite":8},535]