[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263906":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1263906,849,3,"判断题","建筑工程施工图一般的编排顺序为首页图、总平面图、建筑施工图、结构施工图、给排水施工图、电气施工图、采暖通风施工图等。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-岗位技能","建筑工程",0]