[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263890":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1263890,849,3,"判断题","室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种,其中整体顺序自下而上的施工顺序是指主体工程及屋面防水层完工后,室内抹灰从顶层往底层依次逐层向下进行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-岗位技能","建筑工程",0]