[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263889":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1263889,849,3,"判断题","施工进度计划是指在施工方案的基础上,根据规定工期和技术物质供应条件,遵循工程的施工顺序,用图表形式表示各分部分项工程搭接关系及工程开竣工时间的一种计划安排。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-岗位技能","建筑工程",0]