[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263876":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1263876,849,3,"判断题","在工程结算时,零星工作项目费的工程量按承包人实际完成的工作量计算,单价按承包中标时的报价不变。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"土建方向-岗位技能","建筑工程",0]