[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263822":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263822,849,2,"多选题","根据成本管理要求,工程项目成本的形式可划分为( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","承包成本",true,{"key":16,"text":17,"correct":18},"B","直接成本",false,{"key":20,"text":21,"correct":14},"C","计划成本",{"key":23,"text":24,"correct":18},"D","固定成本",{"key":26,"text":27,"correct":14},"E","实际成本","ACE","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]