[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263819":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263819,849,2,"多选题","施工过程成本控制的措施包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","管理措施",false,{"key":16,"text":17,"correct":18},"B","技术措施",true,{"key":20,"text":21,"correct":18},"C","经济措施",{"key":23,"text":24,"correct":18},"D","合同措施",{"key":26,"text":27,"correct":18},"E","组织措施","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]