[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263789":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263789,849,2,"多选题","资源配置计划包括( )等内容。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","临时设施计划",false,{"key":16,"text":17,"correct":18},"B","主要材料配置计划",true,{"key":20,"text":21,"correct":18},"C","施工机具配置计划",{"key":23,"text":24,"correct":18},"D","构配件配置计划",{"key":26,"text":27,"correct":18},"E","劳动力配置计划","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]