[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263783":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263783,849,2,"多选题","其他项目费包括招标人部分和投标人部分。其中招标人部分包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","预留金",true,{"key":16,"text":17,"correct":14},"B","材料购置费",{"key":19,"text":20,"correct":21},"C","人工费",false,{"key":23,"text":24,"correct":21},"D","零星工作项目费",{"key":26,"text":27,"correct":21},"E","总承包服务费","AB","",{"id":6,"name":31,"category":32,"favorite":33},"土建方向-岗位技能","建筑工程",0]