[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263728":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1263728,849,1,"单选题","下列哪一项不是施工准备所包括的内容( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","技术准备",false,{"key":16,"text":17,"correct":14},"B","资金准备",{"key":19,"text":20,"correct":21},"C","机械准备",true,{"key":23,"text":24,"correct":14},"D","现场准备","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]