[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263719":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1263719,849,1,"单选题","下列关于拆除框架结构模板的顺序中,正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","首先是柱模板,然后是楼板底板、梁侧模板,最后梁底模板",true,{"key":16,"text":17,"correct":18},"B","首先是楼板底板,然后是梁侧模板、梁底模板,最后柱模板",false,{"key":20,"text":21,"correct":18},"C","首先是柱模板,然后是梁底模板、楼板底板,最后梁侧模板",{"key":23,"text":24,"correct":18},"D","拆除跨度较大的梁下支柱时,应先从两端开始,分别拆向跨中","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]