[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263678":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1263678,849,1,"单选题","施工过程质量控制的依据不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","专门技术法规",false,{"key":16,"text":17,"correct":14},"B","设计文件",{"key":19,"text":20,"correct":14},"C","工程合同文件",{"key":22,"text":23,"correct":24},"D","建设单位的意图和要求",true,"",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]