[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263672":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1263672,849,1,"单选题","施工成本控制的依据不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程承包合同",false,{"key":16,"text":17,"correct":14},"B","进度报告",{"key":19,"text":20,"correct":21},"C","施工图",true,{"key":23,"text":24,"correct":14},"D","施工成本计划","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]