[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263663":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1263663,849,1,"单选题","施工组织设计和专项施工方案的主要技术经济指标不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工技术指标",true,{"key":16,"text":17,"correct":18},"B","工期指标",false,{"key":20,"text":21,"correct":18},"C","成本指标",{"key":23,"text":24,"correct":18},"D","实物量消耗指标","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]