[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263630":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1263630,849,1,"单选题","室内装修工程的施工顺序有整体顺序自上而下和整体顺序自下而上两种,其中整体顺序自下而上的施工优点有( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","便于组织施工",false,{"key":16,"text":17,"correct":14},"B","有利于施工安全",{"key":19,"text":20,"correct":21},"C","可以缩短工期",true,{"key":23,"text":24,"correct":14},"D","减少或避免各工种操作互相交叉","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]