[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263598":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1263598,849,1,"单选题","施工质量计划的内容一般不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程概况及施工过程分析",true,{"key":16,"text":17,"correct":18},"B","工程检测项目计划及方法",false,{"key":20,"text":21,"correct":18},"C","材料设备质量管理及控制措施",{"key":23,"text":24,"correct":18},"D","质量管理组织机构、人员及资源配置计划","",{"id":6,"name":27,"category":28,"favorite":29},"土建方向-岗位技能","建筑工程",0]