[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-848-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},848,"市政方向-通用基础","建筑工程",1,4,50,378,[13,33,45,57,69,77,89,101,113,125,137,149,159,171,183,195,207,219,231,243,255,267,279,291,303,315,327,339,351,363,375,387,399,411,422,434,446,458,470,482,494,506,518,530,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":8,"typeLabel":15,"stem":16,"options":17,"answer":23,"analysis":32},1263338,"单选题","下列哪一项是正确的( )。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","当力与坐标轴垂直时,力在该轴上的投影等于力的大小",false,{"key":23,"text":24,"correct":25},"B","当力与坐标轴垂直时,力在该轴上的投影为零",true,{"key":27,"text":28,"correct":21},"C","当力与坐标轴平行时,力在该轴上的投影为零",{"key":30,"text":31,"correct":21},"D","当力与坐标轴平行时,力在该轴的投影的大小等于该力的大小","",{"id":34,"libraryId":5,"type":8,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},1263339,"下列说法正确的是( )。",[37,39,41,43],{"key":19,"text":38,"correct":21},"柔体约束的反力方向为通过接触点,沿柔体中心线且指向物体",{"key":23,"text":40,"correct":21},"光滑接触面约束反力的方向通过接触点,沿接触面且沿背离物体的方向",{"key":27,"text":42,"correct":25},"圆柱铰链的约束反力是垂直于轴线并通过销钉中心",{"key":30,"text":44,"correct":21},"链杆约束的反力是沿链杆的中心线,垂直于接触面",{"id":46,"libraryId":5,"type":8,"typeLabel":15,"stem":47,"options":48,"answer":23,"analysis":32},1263340,"光滑接触面约束对物体的约束反力的方向是( )。",[49,51,53,55],{"key":19,"text":50,"correct":21},"通过接触点,沿接触面的公法线方向",{"key":23,"text":52,"correct":25},"通过接触点,沿接触面公法线且指向物体",{"key":27,"text":54,"correct":21},"通过接触点,沿接触面且沿背离物体的方向",{"key":30,"text":56,"correct":21},"通过接触点,且沿接触面公切线方向",{"id":58,"libraryId":5,"type":8,"typeLabel":15,"stem":59,"options":60,"answer":27,"analysis":32},1263341,"既限制构件的移动,也限制构件的转动的支座是( )。",[61,63,65,67],{"key":19,"text":62,"correct":21},"可动铰支座",{"key":23,"text":64,"correct":21},"固定铰支座",{"key":27,"text":66,"correct":25},"固定端支座",{"key":30,"text":68,"correct":21},"滑动铰支座",{"id":70,"libraryId":5,"type":8,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1263342,"可以限制于销钉平面内任意方向的移动,而不能限制构件绕销钉的转动的支座是( )。",[73,74,75,76],{"key":19,"text":62,"correct":21},{"key":23,"text":64,"correct":25},{"key":27,"text":66,"correct":21},{"key":30,"text":68,"correct":21},{"id":78,"libraryId":5,"type":8,"typeLabel":15,"stem":79,"options":80,"answer":27,"analysis":32},1263343,"下列关于结构整体简化正确的是( )。",[81,83,85,87],{"key":19,"text":82,"correct":21},"把空间结构都要分解为平面结构",{"key":23,"text":84,"correct":21},"若空间结构可以由几种不同类型平面结构组成,则要单独分解",{"key":27,"text":86,"correct":25},"对于多跨多层的空间刚架,可以截取纵向或横向平面刚架来分析",{"key":30,"text":88,"correct":21},"对延长方向结构的横截面保持不变的结构,可沿纵轴截取平面结构",{"id":90,"libraryId":5,"type":8,"typeLabel":15,"stem":91,"options":92,"answer":30,"analysis":32},1263344,"合力的大小和方向与分力绘制的顺序的关系是( )。",[93,95,97,99],{"key":19,"text":94,"correct":21},"大小与顺序有关,方向与顺序无关",{"key":23,"text":96,"correct":21},"大小与顺序无关,方向与顺序有关",{"key":27,"text":98,"correct":21},"大小和方向都与顺序有关",{"key":30,"text":100,"correct":25},"大小和方向都与顺序无关",{"id":102,"libraryId":5,"type":8,"typeLabel":15,"stem":103,"options":104,"answer":30,"analysis":32},1263345,"下列说法错误的是( )。",[105,107,109,111],{"key":19,"text":106,"correct":21},"沿同一直线,以同样大小的力拉车,对车产生的运动效果一样",{"key":23,"text":108,"correct":21},"在刚体的原力系上加上或去掉一个平衡力系,不会改变刚体的运动状态",{"key":27,"text":110,"correct":21},"力的可传性原理只适合研究物体的外效应",{"key":30,"text":112,"correct":25},"对于所有物体,力的三要素可改为:力的大小、方向和作用线",{"id":114,"libraryId":5,"type":8,"typeLabel":15,"stem":115,"options":116,"answer":23,"analysis":32},1263346,"下列选项中,不属于施工项目管理组织的内容的是( )。",[117,119,121,123],{"key":19,"text":118,"correct":21},"组织系统的设计与建立",{"key":23,"text":120,"correct":25},"组织沟通",{"key":27,"text":122,"correct":21},"组织运行",{"key":30,"text":124,"correct":21},"组织调整",{"id":126,"libraryId":5,"type":8,"typeLabel":15,"stem":127,"options":128,"answer":30,"analysis":32},1263347,"以下不属于施工项目管理内容的是( )。",[129,131,133,135],{"key":19,"text":130,"correct":21},"施工项目的生产要素管理",{"key":23,"text":132,"correct":21},"组织协调",{"key":27,"text":134,"correct":21},"施工现场的管理",{"key":30,"text":136,"correct":25},"项目的规划设计",{"id":138,"libraryId":5,"type":8,"typeLabel":15,"stem":139,"options":140,"answer":23,"analysis":32},1263348,"公路铺筑面外侧据乔木中心不小于( )m,据灌木边缘不小于( )m。",[141,143,145,147],{"key":19,"text":142,"correct":21},"0.75;不宜种",{"key":23,"text":144,"correct":25},"0.8;2.00",{"key":27,"text":146,"correct":21},"1.00;0.50",{"key":30,"text":148,"correct":21},"2.00;0.50",{"id":150,"libraryId":5,"type":8,"typeLabel":15,"stem":151,"options":152,"answer":23,"analysis":32},1263349,"花境布置形式以( )为主。",[153,155,157],{"key":19,"text":154,"correct":21},"组从状",{"key":23,"text":156,"correct":25},"带状自然式",{"key":27,"text":158,"correct":21},"带状组团式D点状自然式",{"id":160,"libraryId":5,"type":8,"typeLabel":15,"stem":161,"options":162,"answer":30,"analysis":32},1263350,"采用HDPE膜防渗技术的核心是( )。",[163,165,167,169],{"key":19,"text":164,"correct":21},"HDPE膜的进货质量",{"key":23,"text":166,"correct":21},"HDPE膜的机具",{"key":27,"text":168,"correct":21},"HDPE膜的施工季节合理性",{"key":30,"text":170,"correct":25},"HDPE膜的施工质量",{"id":172,"libraryId":5,"type":8,"typeLabel":15,"stem":173,"options":174,"answer":19,"analysis":32},1263351,"GCL垫施工流程为( )。",[175,177,179,181],{"key":19,"text":176,"correct":25},"基底检验→吊运就位→人工铺展→搭接宽度调整→搭接处撒膨润土粉→进行后续施工",{"key":23,"text":178,"correct":21},"基底检验→人工铺展→吊运就位→搭接宽度调整→搭接处撒膨润土粉→进行后续施工",{"key":27,"text":180,"correct":21},"基底检验→吊运就位→搭接宽度调整→人工铺展→搭接处撒膨润土粉→进行后续施工",{"key":30,"text":182,"correct":21},"基底检验→吊运就位→人工铺展→搭接处撒膨润土粉→搭接宽度调整→进行后续施工",{"id":184,"libraryId":5,"type":8,"typeLabel":15,"stem":185,"options":186,"answer":27,"analysis":32},1263352,"进货质量应核验产品出厂三证,下列不属于三证的是( )。",[187,189,191,193],{"key":19,"text":188,"correct":21},"产品合格证",{"key":23,"text":190,"correct":21},"产品说明书",{"key":27,"text":192,"correct":25},"品成分报告单",{"key":30,"text":194,"correct":21},"产品试验报告单",{"id":196,"libraryId":5,"type":8,"typeLabel":15,"stem":197,"options":198,"answer":19,"analysis":32},1263353,"构筑物满水试验程序为( )。",[199,201,203,205],{"key":19,"text":200,"correct":25},"实验准备→水池注水→水池内水位观测→蒸发量测定→有关资料整理",{"key":23,"text":202,"correct":21},"有关资料整理→实验准备→水池注水→水池内水位观测→蒸发量测定",{"key":27,"text":204,"correct":21},"实验准备→水池注水→蒸发量测定→水池内水位观测→有关资料整理",{"key":30,"text":206,"correct":21},"有关资料整理→实验准备-水池注水→蒸发量测定→水池内水位观测",{"id":208,"libraryId":5,"type":8,"typeLabel":15,"stem":209,"options":210,"answer":27,"analysis":32},1263354,"预制构件应按设计位置起吊,曲梁宜采用( )。",[211,213,215,217],{"key":19,"text":212,"correct":21},"一点吊装",{"key":23,"text":214,"correct":21},"两点吊装",{"key":27,"text":216,"correct":25},"三点吊装",{"key":30,"text":218,"correct":21},"多点吊装",{"id":220,"libraryId":5,"type":8,"typeLabel":15,"stem":221,"options":222,"answer":27,"analysis":32},1263355,"整体式现浇钢筋混凝土池体结构施工流程( )。",[223,225,227,229],{"key":19,"text":224,"correct":21},"测量定位→土方开挖及地基处理→防水施工→垫层施工→底板浇筑→池壁及柱浇筑→顶板浇筑→功能性试验",{"key":23,"text":226,"correct":21},"测量定位→土方开挖及地基处理→底板浇筑→垫层施工→防水施工→池壁及柱浇筑→顶板浇筑→功能性试验",{"key":27,"text":228,"correct":25},"测量定位→土方开挖及地基处理→垫层施工→防水施工→底板浇筑→池壁及柱浇筑→顶板浇筑→功能性试验",{"key":30,"text":230,"correct":21},"测量定位→土方开挖及地基处理→底板浇筑→防水施工→垫层施工→池壁及柱浇筑-顶板浇筑→功能性试验",{"id":232,"libraryId":5,"type":8,"typeLabel":15,"stem":233,"options":234,"answer":23,"analysis":32},1263356,"“刃脚”的作用是( )。",[235,237,239,241],{"key":19,"text":236,"correct":21},"满足下沉要求",{"key":23,"text":238,"correct":25},"减小下沉阻力",{"key":27,"text":240,"correct":21},"增加整体刚度",{"key":30,"text":242,"correct":21},"防止渗水",{"id":244,"libraryId":5,"type":8,"typeLabel":15,"stem":245,"options":246,"answer":19,"analysis":32},1263357,"不属于洞口土体加固主要方法的是( )。",[247,249,251,253],{"key":19,"text":248,"correct":25},"SMW法",{"key":23,"text":250,"correct":21},"注浆法",{"key":27,"text":252,"correct":21},"高压喷射搅拌法",{"key":30,"text":254,"correct":21},"冻结法",{"id":256,"libraryId":5,"type":8,"typeLabel":15,"stem":257,"options":258,"answer":27,"analysis":32},1263358,"管棚超前支护技术施工工艺流程为( )。",[259,261,263,265],{"key":19,"text":260,"correct":21},"测放孔位→钻机就位→水平钻孔→压入钢管→移机→开挖→注浆→封口",{"key":23,"text":262,"correct":21},"钻机就位→测放孔位→水平钻孔→压入钢管→移机→开挖→注浆→封口",{"key":27,"text":264,"correct":25},"测放孔位→钻机就位→水平钻孔→压入钢管→移机→注浆→封口→开挖",{"key":30,"text":266,"correct":21},"钻机就位→测放孔位→水平钻孔→压入钢管→移机→注浆→封口→开挖",{"id":268,"libraryId":5,"type":8,"typeLabel":15,"stem":269,"options":270,"answer":30,"analysis":32},1263359,"双侧壁导坑法施工顺序是( )。",[271,273,275,277],{"key":19,"text":272,"correct":21},"开挖上部核心土→开挖下台阶→施作内层衬砌→开挖→侧导坑→开挖另→侧导坑→拆除导坑临空部分的支护",{"key":23,"text":274,"correct":21},"开挖→侧导坑→开挖另→侧导坑→施作内层衬砌→开挖上部核心土→开挖下台阶→拆除导坑临空部分的支护",{"key":27,"text":276,"correct":21},"开挖上部核心土→开挖下台阶→开挖→侧导坑→开挖另→侧导坑→拆除导坑临空部分的支护→施作内层衬砌",{"key":30,"text":278,"correct":25},"开挖→侧导坑→开挖另→侧导坑-开挖上部核心土→开挖下台阶→拆除导坑临空部分的支护→施作内层衬砌",{"id":280,"libraryId":5,"type":8,"typeLabel":15,"stem":281,"options":282,"answer":27,"analysis":32},1263360,"盖挖逆作法的施工顺序( )。",[283,285,287,289],{"key":19,"text":284,"correct":21},"构筑围护结构之地下连续墙和结构中间桩柱→回填顶板以上土方→开挖施工结构顶板→往上施工地上建筑",{"key":23,"text":286,"correct":21},"开挖施工结构顶板→回填顶板以上土方-构筑围护结构之地下连续墙和结构中间桩柱→往上施工地上建筑",{"key":27,"text":288,"correct":25},"构筑围护结构之地下连续墙和结构中间桩柱→开挖施工结构顶板→回填顶板以上土方→往上施工地上建筑",{"key":30,"text":290,"correct":21},"开挖施工结构顶板→构筑围护结构之地下连续墙和结构中间桩柱→回填顶板以上土方→往上施工地上建筑",{"id":292,"libraryId":5,"type":8,"typeLabel":15,"stem":293,"options":294,"answer":19,"analysis":32},1263361,"支撑结构挡土的应力传递路径( )。",[295,297,299,301],{"key":19,"text":296,"correct":25},"围护（桩）墙→围檩（冠梁）→支撑",{"key":23,"text":298,"correct":21},"围檩（冠梁）→围护（桩）墙→支撑",{"key":27,"text":300,"correct":21},"围护（桩）墙→支撑→围檩（冠梁）",{"key":30,"text":302,"correct":21},"支撑→围护（桩）墙→围檩（冠梁）",{"id":304,"libraryId":5,"type":8,"typeLabel":15,"stem":305,"options":306,"answer":23,"analysis":32},1263362,"不开槽施工方法中,一般情况下,浅埋暗挖法适用于直径( )管道施工。",[307,309,311,313],{"key":19,"text":308,"correct":21},"100-1000mm",{"key":23,"text":310,"correct":25},"2000mm以上",{"key":27,"text":312,"correct":21},"800-3000mm",{"key":30,"text":314,"correct":21},"3000mm以上",{"id":316,"libraryId":5,"type":8,"typeLabel":15,"stem":317,"options":318,"answer":23,"analysis":32},1263363,"水文气象不稳定、沉管距离较长、水流速度相对较大时,可采用( )。",[319,321,323,325],{"key":19,"text":320,"correct":21},"水面浮运法",{"key":23,"text":322,"correct":25},"铺管船法",{"key":27,"text":324,"correct":21},"底拖法",{"key":30,"text":326,"correct":21},"浮运发",{"id":328,"libraryId":5,"type":8,"typeLabel":15,"stem":329,"options":330,"answer":30,"analysis":32},1263364,"直埋管道接头的一级管网的现场安装的接头密封应进行( )的气密性检验。",[331,333,335,337],{"key":19,"text":332,"correct":21},"20%",{"key":23,"text":334,"correct":21},"50%",{"key":27,"text":336,"correct":21},"80%",{"key":30,"text":338,"correct":25},"100%",{"id":340,"libraryId":5,"type":8,"typeLabel":15,"stem":341,"options":342,"answer":30,"analysis":32},1263365,"根据接口的弹性,不属于管道接口形式的是( )。",[343,345,347,349],{"key":19,"text":344,"correct":21},"柔性",{"key":23,"text":346,"correct":21},"刚性",{"key":27,"text":348,"correct":21},"半刚半柔性",{"key":30,"text":350,"correct":25},"弹性",{"id":352,"libraryId":5,"type":8,"typeLabel":15,"stem":353,"options":354,"answer":23,"analysis":32},1263366,"排水沟断面尺寸一般为( )。",[355,357,359,361],{"key":19,"text":356,"correct":21},"10Cm×10Cm",{"key":23,"text":358,"correct":25},"30Cm×30Cm",{"key":27,"text":360,"correct":21},"50Cm×50Cm",{"key":30,"text":362,"correct":21},"100Cm×100Cm",{"id":364,"libraryId":5,"type":8,"typeLabel":15,"stem":365,"options":366,"answer":27,"analysis":32},1263367,"不属于常用沟槽支撑形式的是( )。",[367,369,371,373],{"key":19,"text":368,"correct":21},"横撑",{"key":23,"text":370,"correct":21},"竖撑",{"key":27,"text":372,"correct":25},"纵撑",{"key":30,"text":374,"correct":21},"板桩撑",{"id":376,"libraryId":5,"type":8,"typeLabel":15,"stem":377,"options":378,"answer":19,"analysis":32},1263368,"移动模架施工工艺流程为( )。",[379,381,383,385],{"key":19,"text":380,"correct":25},"移动模架组装→移动模架预压→预压结果评价→模板调整→绑扎钢筋→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"key":23,"text":382,"correct":21},"移动模架组装→模板调整→绑扎钢筋→移动模架预压→预压结果评价→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"key":27,"text":384,"correct":21},"移动模架组装→绑扎钢筋→移动模架预压→预压结果评价→模板调整→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"key":30,"text":386,"correct":21},"移动模架组装→模板调整→移动模架预压→预压结果评价→绑扎钢筋→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"id":388,"libraryId":5,"type":8,"typeLabel":15,"stem":389,"options":390,"answer":27,"analysis":32},1263369,"非承重侧模板在混凝土强度能保证拆模时不损坏表面及棱角,一般以混凝土强度达到( )MPa为准。",[391,393,395,397],{"key":19,"text":392,"correct":21},"1.5",{"key":23,"text":394,"correct":21},"2",{"key":27,"text":396,"correct":25},"2.5",{"key":30,"text":398,"correct":21},"3",{"id":400,"libraryId":5,"type":8,"typeLabel":15,"stem":401,"options":402,"answer":27,"analysis":32},1263370,"下列各项中,不属于架桥机的是( )。",[403,405,407,409],{"key":19,"text":404,"correct":21},"单导梁",{"key":23,"text":406,"correct":21},"双导梁",{"key":27,"text":408,"correct":25},"多导梁",{"key":30,"text":410,"correct":21},"斜拉式",{"id":412,"libraryId":5,"type":8,"typeLabel":15,"stem":413,"options":414,"answer":23,"analysis":32},1263371,"混凝土强度、弹性模量符合设计要求时才能放松预应力筋。当日平均气温不低于20℃时,龄期不小于( )d。",[415,416,418,420],{"key":19,"text":398,"correct":21},{"key":23,"text":417,"correct":25},"5",{"key":27,"text":419,"correct":21},"7",{"key":30,"text":421,"correct":21},"28",{"id":423,"libraryId":5,"type":8,"typeLabel":15,"stem":424,"options":425,"answer":19,"analysis":32},1263372,"板式橡胶支座一般工艺流程主要包括( )。",[426,428,430,432],{"key":19,"text":427,"correct":25},"支座垫石凿毛处理、测量放线、找平修补、环氧砂浆拌制、支座安装等",{"key":23,"text":429,"correct":21},"测量放线、支座垫石凿毛处理、环氧砂浆拌制、找平修补、支座安装等",{"key":27,"text":431,"correct":21},"支座垫石凿毛处理、测量放线、环氧砂浆拌制、找平修补、支座安装等",{"key":30,"text":433,"correct":21},"测量放线、支座垫石凿毛处理、找平修补、环氧砂浆拌制、支座安装等",{"id":435,"libraryId":5,"type":8,"typeLabel":15,"stem":436,"options":437,"answer":30,"analysis":32},1263373,"沥青混合料面层基本施工工艺流程为( )。",[438,440,442,444],{"key":19,"text":439,"correct":21},"洒布车撒布-洒布石屑→人工补撒→养护",{"key":23,"text":441,"correct":21},"洒布车撒布→养护→人工补撒→洒布石屑",{"key":27,"text":443,"correct":21},"洒布车撒布→洒布石屑→养护→人工补撒",{"key":30,"text":445,"correct":25},"洒布车撒布→人工补撒→洒布石屑→养护",{"id":447,"libraryId":5,"type":8,"typeLabel":15,"stem":448,"options":449,"answer":19,"analysis":32},1263374,"级配砂砾基层施工工艺流程为( )。",[450,452,454,456],{"key":19,"text":451,"correct":25},"拌合→运输→摊铺→碾压→养护",{"key":23,"text":453,"correct":21},"运输→拌合→碾压→摊铺→养护",{"key":27,"text":455,"correct":21},"拌合→运输→碾压→摊铺→养护",{"key":30,"text":457,"correct":21},"运输→拌合→摊铺→碾压→养护",{"id":459,"libraryId":5,"type":8,"typeLabel":15,"stem":460,"options":461,"answer":19,"analysis":32},1263375,"砂石铺筑垫层施工应按( )的顺序进行。",[462,464,466,468],{"key":19,"text":463,"correct":25},"先深后浅",{"key":23,"text":465,"correct":21},"先浅后深",{"key":27,"text":467,"correct":21},"先上后下",{"key":30,"text":469,"correct":21},"先下后上",{"id":471,"libraryId":5,"type":8,"typeLabel":15,"stem":472,"options":473,"answer":27,"analysis":32},1263376,"一般机械挖路堑施工工艺流程为( )。",[474,476,478,480],{"key":19,"text":475,"correct":21},"边坡施工→路床碾压→路堑开挖→质量检验",{"key":23,"text":477,"correct":21},"路堑开挖→路床碾压→边坡施工→质量检验",{"key":27,"text":479,"correct":25},"路堑开挖→边坡施工_路床碾压→质量检验",{"key":30,"text":481,"correct":21},"边坡施工→路堑开挖→路床碾压→质量检验",{"id":483,"libraryId":5,"type":8,"typeLabel":15,"stem":484,"options":485,"answer":23,"analysis":32},1263377,"路堤填方施工工艺流程为( )。",[486,488,490,492],{"key":19,"text":487,"correct":21},"现场清理、填前碾压→碾压→填筑→质量检验",{"key":23,"text":489,"correct":25},"现场清理、填前碾压→填筑→碾压→质量检验",{"key":27,"text":491,"correct":21},"现场清理、填前碾压→碾压→质量检验→填筑",{"key":30,"text":493,"correct":21},"现场清理、填前碾压→质量检验→填筑→碾压",{"id":495,"libraryId":5,"type":8,"typeLabel":15,"stem":496,"options":497,"answer":23,"analysis":32},1263378,"下列不属于现浇混凝土护壁的是( )。",[498,500,502,504],{"key":19,"text":499,"correct":21},"等厚度护壁",{"key":23,"text":501,"correct":25},"不等厚度护壁",{"key":27,"text":503,"correct":21},"外齿式护壁",{"key":30,"text":505,"correct":21},"内齿式护壁",{"id":507,"libraryId":5,"type":8,"typeLabel":15,"stem":508,"options":509,"answer":30,"analysis":32},1263379,"土钉支护基坑的施工工艺流程为( )。",[510,512,514,516],{"key":19,"text":511,"correct":21},"开挖工作面→铺设固定钢筋网→土钉施工→喷射混凝土面层",{"key":23,"text":513,"correct":21},"土钉施工→开挖工作面→铺设固定钢筋网→喷射混凝土面层",{"key":27,"text":515,"correct":21},"铺设固定钢筋网→开挖工作面→土钉施工→喷射混凝土面层",{"key":30,"text":517,"correct":25},"开挖工作面→土钉施工→铺设固定钢筋网→喷射混凝土面层",{"id":519,"libraryId":5,"type":8,"typeLabel":15,"stem":520,"options":521,"answer":23,"analysis":32},1263380,"人工开挖沟槽的深度超过3.0m时,分层开挖的煤层深度不宜超过( )m。",[522,524,526,528],{"key":19,"text":523,"correct":21},"1.0",{"key":23,"text":525,"correct":25},"2.0",{"key":27,"text":527,"correct":21},"30",{"key":30,"text":529,"correct":21},"5.0",{"id":531,"libraryId":5,"type":8,"typeLabel":15,"stem":532,"options":533,"answer":23,"analysis":32},1263381,"当土质较差有严重流沙现象,可采用( )。",[534,536,538,540],{"key":19,"text":535,"correct":21},"明沟排水法",{"key":23,"text":537,"correct":25},"井点降水法",{"key":27,"text":539,"correct":21},"管井降水法",{"key":30,"text":541,"correct":21},"集水坑排水法",{"id":543,"libraryId":5,"type":8,"typeLabel":15,"stem":544,"options":545,"answer":19,"analysis":32},1263382,"水泥粉煤灰碎石桩的施工工艺流程为( )。",[546,548,550,552],{"key":19,"text":547,"correct":25},"桩位测量-桩机就位→钻进成孔→混凝土浇筑→移机→检测→褥垫层施工",{"key":23,"text":549,"correct":21},"桩机就位→桩位测量→钻进成孔→混凝土浇筑→移机→检测→褥垫层施工",{"key":27,"text":551,"correct":21},"桩位测量→桩机就位→钻进成孔→移机→混凝土浇筑→检测→褥垫层施工",{"key":30,"text":553,"correct":21},"桩机就位→桩位测量→钻进成孔→移机→混凝土浇筑→检测_褥垫层施工",{"id":555,"libraryId":5,"type":8,"typeLabel":15,"stem":556,"options":557,"answer":27,"analysis":32},1263383,"深层搅拌法固化剂的主剂是( )。",[558,560,562,564],{"key":19,"text":559,"correct":21},"混凝土",{"key":23,"text":561,"correct":21},"减水剂",{"key":27,"text":563,"correct":25},"水泥浆",{"key":30,"text":565,"correct":21},"粉煤灰",{"id":567,"libraryId":5,"type":8,"typeLabel":15,"stem":568,"options":569,"answer":27,"analysis":32},1263384,"高压喷射注浆法施工工序为( )。",[570,572,574,576],{"key":19,"text":571,"correct":21},"机具就位→置入喷射管→钻孔→喷射注浆→拔管→冲洗",{"key":23,"text":573,"correct":21},"机具就位→钻孔→拔管→置人喷射管→喷射注浆→冲洗",{"key":27,"text":575,"correct":25},"机具就位→钻孔→置入喷射管→喷射注浆→拔管→冲洗",{"key":30,"text":577,"correct":21},"钻孔→机具就位→置人喷射管→喷射注浆→拔管→冲洗",{"id":579,"libraryId":5,"type":8,"typeLabel":15,"stem":580,"options":581,"answer":19,"analysis":32},1263385,"封闭泥浆的7d立方体抗压强度宜为( )MPa。",[582,584,586,588],{"key":19,"text":583,"correct":25},"0.3-0.5",{"key":23,"text":585,"correct":21},"0.5-0.8",{"key":27,"text":587,"correct":21},"1.0-1.2",{"key":30,"text":589,"correct":21},"1.2-1.5",{"id":591,"libraryId":5,"type":8,"typeLabel":15,"stem":592,"options":593,"answer":27,"analysis":32},1263386,"真空预压的施工顺序一般为( )。",[594,596,598,600],{"key":19,"text":595,"correct":21},"设置竖向排水体→铺设排水垫层→埋设滤管→开挖边沟→铺膜、填沟、安装射流泵等→抽空→抽真空、预压",{"key":23,"text":597,"correct":21},"铺设排水垫层-设置竖向排水体→开挖边沟-埋设滤管→铺膜、填沟、安装射流泵等→抽空→抽真空、预压",{"key":27,"text":599,"correct":25},"铺设排水垫层→设置竖向排水体→埋设滤管→开挖边沟→铺膜、填沟、安装射流泵等→抽空→抽真空、预压",{"key":30,"text":601,"correct":21},"铺设排水垫层→设置竖向排水体→埋设滤管→开挖边沟→抽空→铺膜、填沟、安装射流泵等→抽真空、预压",{"id":603,"libraryId":5,"type":8,"typeLabel":15,"stem":604,"options":605,"answer":23,"analysis":32},1263387,"为避免基底扰动,应保留( )mm土层不挖,人工清理。",[606,608,610,612],{"key":19,"text":607,"correct":21},"50-150",{"key":23,"text":609,"correct":25},"100-200",{"key":27,"text":611,"correct":21},"150-250",{"key":30,"text":613,"correct":21},"200-300",[615,618,621,624,628,630],{"id":8,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":8},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":8},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":627},534,"BIM工程师",0,{"id":629,"name":626,"category":7,"favorite":627},535,{"id":631,"name":632,"category":7,"favorite":627},536,"安全人A证"]