[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263458":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1263458,848,3,"判断题","工程量清单计价的合同价款的调整方式包括变更签证和政策性调整等。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"市政方向-通用基础","建筑工程",1]