[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263363":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1263363,848,1,"单选题","水文气象不稳定、沉管距离较长、水流速度相对较大时,可采用( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","水面浮运法",false,{"key":16,"text":17,"correct":18},"B","铺管船法",true,{"key":20,"text":21,"correct":14},"C","底拖法",{"key":23,"text":24,"correct":14},"D","浮运发","",{"id":6,"name":27,"category":28,"favorite":7},"市政方向-通用基础","建筑工程"]