[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263246":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1263246,848,1,"单选题","管道沟槽的深度按基础的形式和埋深分别计算,枕基的计算方法是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","原地面高程减设计管道基础底面高程",false,{"key":16,"text":17,"correct":18},"B","原地面高程减设计管道基础底面高程加管壁厚度",true,{"key":20,"text":21,"correct":14},"C","原地面高程减设计管道基础底面高程加垫层厚度",{"key":23,"text":24,"correct":14},"D","原地面高程减设计管道基础底面高程减管壁厚度","",{"id":6,"name":27,"category":28,"favorite":7},"市政方向-通用基础","建筑工程"]