[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263245":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1263245,848,1,"单选题","工程量均以施工图为准计算,下列说法错误的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","砌筑按计算体积,以立方米计算抹灰和勾缝",true,{"key":16,"text":17,"correct":18},"B","各种井的预制构件以实体积计算",false,{"key":20,"text":21,"correct":18},"C","井、渠垫层、基础按实体积以立方米计算",{"key":23,"text":24,"correct":18},"D","沉降缝应区分材质,按沉降缝的断面积或铺设长分别以平方米和米计算","",{"id":6,"name":27,"category":28,"favorite":7},"市政方向-通用基础","建筑工程"]