[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-847-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":316},{"id":5,"name":6,"category":7,"favorite":8},847,"市政方向-岗位技能","建筑工程",0,8,50,399,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1263136,3,"判断题","同一结构类型的附属构筑物不大于10个为一个验收批。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1263137,"砖墙砌筑后,一定要有5-8d时间让墙体充分沉陷、稳定、干燥,然后才能抹面。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1263138,"冷拉钢筋,一定要先对焊后冷拉,否则,就会失去冷强。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1263139,"水泥的质量是直接影响混凝土工程质量的关键因素,因此应对进场的水泥质量进行重点控制,唯一的措施是对其出厂合格证进行检查。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1263140,"对技术文件的审核,是项目技术负责人对工程质量进行全面控制的重要手段。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1263141,"质量指产品质量或者某项活动或过程的工作质量。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1263142,"当有节点工期的限制,进度计划的调整还不能满足节点工期的约束时,应考虑改变施工方案。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1263143,"可以把依次进行的有关工作改成平行的或互相搭接的以及分成几个施工段进行流水施工。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":21,"analysis":27},1263144,"若检查的实际施工进度产生的偏差影响了总工期,在某些条件下,改变关键线路和超过计划工期的非关键线路的有关工作之间的逻辑关系,达到缩短工期的目的。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1263145,"施工进度计划表中列出直接在施工现场实施的施工过程,包括成品、半成品等采购、加工和运输的施工过程。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1263146,"横道图总体表示了各施工过程所需的工期和总工期,并综合反映了各单位工程相互间的关系。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1263147,"工程变更应以会议或书面形式提出,并进行书面记录。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1263148,"施工测量既是保证市政工程施工质量的重要环节,又是提高市政工程安全性和耐久性的基本保证。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1263149,"项目部应制订工程测量复核制度,实地测量必须按制度进行内部复核,并报现场监理工程师复核同意后,方可进行施工。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1263150,"专项方案应采用现场讲授形式,形成书面记录。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1263151,"施工方案应采用会议形式,并形成会议记录。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1263152,"施工组织设计、专项方案应由施工项目部技术负责人向项目部施工和技术质量安全管理人员交底。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1263153,"危险性较大的分部分项工程专项施工方案应由施工单位项目经理审核签字。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1263154,"实行施工总承包,专项方案应当由相关专业承包单位技术负责人签章后方可实施。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1263155,"专项方案经审核合格,应由项目经理签字。",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1263156,"选择施工机具和材料时,在同一个工地上施工机具的种类和型号应尽可能多。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1263157,"重点分项工程、关键工序应制订专项施工方案。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1263158,"合同管理的最终目标是用最小的造价建成质量最好的工程产品。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1263159,"劳动力配置计划是根据施工方案和施工进度计划进行编制的。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1263160,"单项工程施工组织设计是以分部分项工程或专项工程为主要对象编制的施工技术与组织方案。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1263161,"施工组织总设计是以单位工程或不复杂的单项工程为主要对象编制的施工组织设计。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1263162,"在施工过程中,设计变更要填写设计变更联系单,经监理单位签字同意后,方可进行。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1263163,"图纸会审应由项目经理组织有关单位参加。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1263164,"项目部根据项目实际需要制订技术管理制度,上报项目经理批准后执行。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1263165,"挤压式盾构由于不出土或只部分出土,对地层的扰动较小。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1263166,"土压式盾构机只适于可用切削刀开挖且含砂量小的塑性流动性软黏土。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1263167,"现场无降水条件时,宜采用土压平衡或泥水平衡顶管机施工。",[212,213],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1263168,"塔吊拆装时，风力达到五级以上不得进行顶升作业。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1263169,"履带式起重机的行驶驾驶室与起重操纵室合二为一,与汽车起重机不同。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1263170,"汽车起重机最大的特点是机动性能好,转移方便,但是操作工人的劳动强度比较大。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1263171,"混凝土搅拌运输车是为了保证混凝土的和易性。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1263172,"市政工程使用的水泥混凝土搅拌设备多为强制式,因为强制式搅拌设备对骨料粒径基本没有要求。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1263173,"长螺旋钻机在连续墙等地基基础施工中应用最多。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1263174,"旋挖钻机可以满足各类大型基桩和基坑围护桩施工的要求。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1263175,"基础压实作业,应采取振动轮的宽度和直径都适中的振动压路机。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1263176,"路面压实应采取振动轮的宽度和直径都较大的振动压路机。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1263177,"对于单轮驱动的压路机,驱动轮分配的质量较大时能保证压路机有足够的附着力和制动力矩。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1263178,"履带式摊铺机对路基的平整度不太敏感,能有效地保证摊铺平整度。",[278,279],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":25,"analysis":27},1263179,"轮胎式摊铺机可在较软的路基上进行摊铺作业。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1263180,"挖掘机更换工作装置后还可以进行起重、浇筑、安装、打桩、夯土和拔桩等工作。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1263181,"挖掘机是一种能综合完成挖土、运土、卸土、填筑、整平的土方机械。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1263182,"铲运机适用于道路工程大规模路基施工。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1263183,"铲运机操作灵活,施工效率高,但需要专门设置道路。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1263184,"小型铲运机是指铲斗容积在3m3以下的铲运机。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[317,321,324,327,330,333],{"id":318,"name":319,"category":7,"favorite":320},1,"领导干部任职前廉政法规知识测试题",92,{"id":322,"name":323,"category":7,"favorite":318},595,"建筑结构与设备",{"id":325,"name":326,"category":7,"favorite":318},715,"招标采购专业知识与法律法规",{"id":328,"name":329,"category":7,"favorite":318},848,"市政方向-通用基础",{"id":331,"name":332,"category":7,"favorite":8},534,"BIM工程师",{"id":334,"name":332,"category":7,"favorite":8},535]