[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-847-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":714},{"id":5,"name":6,"category":7,"favorite":8},847,"市政方向-岗位技能","建筑工程",0,6,50,399,[13,38,53,68,83,98,112,126,140,154,168,183,197,212,226,240,254,269,283,297,311,325,339,353,367,381,395,408,422,436,450,465,479,493,507,521,535,549,563,577,590,603,618,631,645,659,673,688,698,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1263035,2,"多选题","常用的无损检测的方法有( )。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","超声波探测",true,{"key":24,"text":25,"correct":22},"B","X射线探测",{"key":27,"text":28,"correct":22},"C","y射线探测",{"key":30,"text":31,"correct":32},"D","小应变检测",false,{"key":34,"text":35,"correct":32},"E","混凝土强度回弹检测","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1263036,"下列属于物理力学性能检验的是( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"抗拉强度",{"key":24,"text":45,"correct":22},"含水量",{"key":27,"text":47,"correct":22},"安定性",{"key":30,"text":49,"correct":32},"抗腐蚀性",{"key":34,"text":51,"correct":22},"耐磨性","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1263037,"现场质量检查的方法有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"目测法",{"key":24,"text":60,"correct":32},"对比法",{"key":27,"text":62,"correct":22},"试验法",{"key":30,"text":64,"correct":22},"实测法",{"key":34,"text":66,"correct":32},"无损检测法","ACD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1263039,"正式施工前进行的事前主动质量控制的内容有( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"技术准备",{"key":24,"text":75,"correct":22},"施工现场准备",{"key":27,"text":77,"correct":22},"物资准备",{"key":30,"text":79,"correct":22},"组织准备",{"key":34,"text":81,"correct":32},"人员准备","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1263040,"环境条件是指对工程质量特性起重要作用的环境因素,主要包括( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"施工现场自然环境因素",{"key":24,"text":90,"correct":22},"施工质量管理环境因素",{"key":27,"text":92,"correct":32},"施工水文地质因素",{"key":30,"text":94,"correct":32},"施工安全管理因素",{"key":34,"text":96,"correct":22},"施工作业环境因素","ABE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":82,"analysis":37},1263041,"市政工程作为一种特殊的产品",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"适用性",{"key":24,"text":105,"correct":22},"耐久性",{"key":27,"text":107,"correct":22},"安全性",{"key":30,"text":109,"correct":22},"可靠性",{"key":34,"text":111,"correct":32},"结构性有以下哪些方面的特点____。",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":52,"analysis":37},1263042,"对比实际进度与计划进度常用的方法有( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"横道图比较法",{"key":24,"text":119,"correct":22},"S形曲线比较法",{"key":27,"text":121,"correct":22},"“香蕉”形曲线比较法",{"key":30,"text":123,"correct":32},"网络图比较法",{"key":34,"text":125,"correct":22},"列表比较法",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":67,"analysis":37},1263043,"施工进度计划跟踪与检查内容的主要工作包括( )。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"跟踪检查实际施工进度",{"key":24,"text":133,"correct":32},"收集施工资料",{"key":27,"text":135,"correct":22},"整理统计检查数据",{"key":30,"text":137,"correct":22},"对比实际进度与计划进度",{"key":34,"text":139,"correct":32},"调整施工方案",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":82,"analysis":37},1263044,"施工进度计划实施的保证措施包括( )。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"全面交底、发动群众",{"key":24,"text":147,"correct":22},"编制月作业计划",{"key":27,"text":149,"correct":22},"签发施工任务书",{"key":30,"text":151,"correct":22},"做好施工进度记录",{"key":34,"text":153,"correct":32},"跟踪施工进度计划的实施",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":52,"analysis":37},1263045,"工程量计算时应注意的问题有( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"分部分项工程工程量的计算单位应与相应定额标准的计算单位相一致",{"key":24,"text":161,"correct":22},"工程量的计算应结合施工方法和安全技术要求",{"key":27,"text":163,"correct":22},"按分区、分项等计算工程量",{"key":30,"text":165,"correct":32},"工程量的计算应按从易到难的顺序排列",{"key":34,"text":167,"correct":22},"采用预算文件中的工程量时应按施工过程的划分情况将有关项目的工程量汇总",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},1263046,"在确定施工阶段时,应注意的问题包括( )。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"施工阶段的划分应与施工方法相一致",{"key":24,"text":175,"correct":32},"施工阶段划分的粗细程度主要根据分部分项工程施工进度计划所起的客观作用",{"key":27,"text":177,"correct":32},"适当简化施工进度计划内容,突出重点,施工过程划分应尽量细",{"key":30,"text":179,"correct":22},"所有施工阶段应大致按照施工顺序先后排列",{"key":34,"text":181,"correct":22},"施工阶段的划分一定要结合工程结构特点","ADE",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":52,"analysis":37},1263047,"单位工程施工进度计划的作用包括( )。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"控制单位工程的施工进度",{"key":24,"text":190,"correct":22},"确定单位工程的各个施工过程的施工顺序",{"key":27,"text":192,"correct":22},"为编制年度等计划生产作业计划提供依据",{"key":30,"text":194,"correct":32},"控制不同时段的工程成本",{"key":34,"text":196,"correct":22},"是编制和实施施工准备工作的依据",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":211,"analysis":37},1263048,"分部分项工程检查验收主要项目包括( )。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"城镇道路工程",{"key":24,"text":204,"correct":32},"土石方工程",{"key":27,"text":206,"correct":22},"城市桥梁工程",{"key":30,"text":208,"correct":22},"开槽施工管道工程",{"key":34,"text":210,"correct":22},"构筑物工程","ACDE",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":52,"analysis":37},1263049,"市政工程的主要隐蔽项目包括( )。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"地基与基础",{"key":24,"text":219,"correct":22},"基础部位的钢筋",{"key":27,"text":221,"correct":22},"现场结构焊接",{"key":30,"text":223,"correct":32},"道路面层",{"key":34,"text":225,"correct":22},"燃气与供热管道",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":82,"analysis":37},1263050,"市政工程用沥青施工检验包括( )试验。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"延度",{"key":24,"text":233,"correct":22},"针入度",{"key":27,"text":235,"correct":22},"软化点",{"key":30,"text":237,"correct":22},"老化",{"key":34,"text":239,"correct":32},"强度",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":82,"analysis":37},1263051,"施工测量的主要工作一般包括( )。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"熟悉设计图纸与设计资料",{"key":24,"text":247,"correct":22},"现场踏勘",{"key":27,"text":249,"correct":22},"交桩成果复核",{"key":30,"text":251,"correct":22},"制定测量方案",{"key":34,"text":253,"correct":32},"测量技术交底",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":268,"analysis":37},1263052,"下列选项中,专项施工方案内必须编制监测方案的是( )。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"基坑支护",{"key":24,"text":261,"correct":22},"承重支架",{"key":27,"text":263,"correct":32},"高支架模板",{"key":30,"text":265,"correct":22},"大型脚手架",{"key":34,"text":267,"correct":32},"顶管施工","ABD",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":82,"analysis":37},1263053,"专项方案编制的内容主要包括( )。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"编制依据",{"key":24,"text":276,"correct":22},"工程概况",{"key":27,"text":278,"correct":22},"施工部署",{"key":30,"text":280,"correct":22},"施工方案",{"key":34,"text":282,"correct":32},"施工合同",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":296,"analysis":37},1263054,"下列选项中,应按规范标准进行结构强度、刚度和稳定性核算的包括( )。",[287,289,290,292,294],{"key":20,"text":288,"correct":22},"模板支护",{"key":24,"text":259,"correct":22},{"key":27,"text":291,"correct":32},"现浇箱梁",{"key":30,"text":293,"correct":22},"施工便桥",{"key":34,"text":295,"correct":22},"软基处理","ABDE",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":52,"analysis":37},1263055,"选择施工方案的依据主要有( )。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"工程特点",{"key":24,"text":304,"correct":22},"工期要求",{"key":27,"text":306,"correct":22},"施工组织条件",{"key":30,"text":308,"correct":32},"施工成本",{"key":34,"text":310,"correct":22},"标书、合同书的要求",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":82,"analysis":37},1263056,"施工方案的主要内容包括( )。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"施工方法",{"key":24,"text":318,"correct":22},"施工机具与材料",{"key":27,"text":320,"correct":22},"施工组织",{"key":30,"text":322,"correct":22},"施工顺序",{"key":34,"text":324,"correct":32},"专项施工方案",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":52,"analysis":37},1263057,"文明施工和环境保护措施应包括( )。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"文明施工和环境保护的目标",{"key":24,"text":332,"correct":22},"文明施工和环境保护的管理网络",{"key":27,"text":334,"correct":22},"文明施工和环境保护的管理措施",{"key":30,"text":336,"correct":32},"文明施工和环境保护的资金保证措施",{"key":34,"text":338,"correct":22},"文明施工和环境保护的保证措施",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":296,"analysis":37},1263058,"施工技术准备包括( )。",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"熟悉、审核设计图纸和有关设计资料",{"key":24,"text":346,"correct":22},"制、报审单位工程施工组织设计、施工方案",{"key":27,"text":348,"correct":32},"做好测量控制点交接、复核工作",{"key":30,"text":350,"correct":22},"编制工程项目成本计划",{"key":34,"text":352,"correct":22},"技术交底工作和安全技术培训",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":52,"analysis":37},1263059,"施工现场准备包括( )。",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"办理工程开工许可等手续",{"key":24,"text":360,"correct":22},"安排好施工现场的“三通一平”",{"key":27,"text":362,"correct":22},"落实生产和生活暂设建设",{"key":30,"text":364,"correct":32},"做好施工人员的安全教育",{"key":34,"text":366,"correct":22},"做好测量控制点交接",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":296,"analysis":37},1263060,"施工现场平面布置的依据包括( )。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"工程总平面图",{"key":24,"text":374,"correct":22},"施工区域的自然、技术和经济条件",{"key":27,"text":376,"correct":32},"施工组织设计",{"key":30,"text":378,"correct":22},"已确定的施工方案",{"key":34,"text":380,"correct":22},"设计文件",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":52,"analysis":37},1263061,"施工组织设计的主要作用有( )。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"确定施工可能性和经济合理性,对工厂施工全过程作全局性部署和安排",{"key":24,"text":388,"correct":22},"合理布置施工现场平面,建立合理的施工顺序,保证施工有序地实施",{"key":27,"text":390,"correct":22},"制定合理的施工方案,确定施工方法、劳动组织和技术经济措施",{"key":30,"text":392,"correct":32},"根据施工特点确定最节约的施工方案和合理的施工顺序",{"key":34,"text":394,"correct":22},"分析工程项目的特点、难点,制订有效的技术措施",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":97,"analysis":37},1263062,"施工组织设计按编制对象可以分为( )。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"施工组织总设计",{"key":24,"text":402,"correct":22},"单位工程施工组织设计",{"key":27,"text":404,"correct":32},"单项工程施工组织设计",{"key":30,"text":406,"correct":32},"分项工程施工组织设计",{"key":34,"text":280,"correct":22},{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":82,"analysis":37},1263063,"技术质量管理部门负责人岗位责任包括( )。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"组织编制项目施工组织设计和施工方案",{"key":24,"text":415,"correct":22},"主持图纸会审和安全技术交底",{"key":27,"text":417,"correct":22},"组织编制施工质量和安全的技术措施",{"key":30,"text":419,"correct":22},"负责技术总结",{"key":34,"text":421,"correct":32},"主持技术会议,处理重大施工技术质量问题",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":52,"analysis":37},1263064,"项目技术负责人岗位责任包括( )。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"负责项目技术管理和质量控制工作",{"key":24,"text":429,"correct":22},"贯彻执行相关技术标准、验收规范和技术管理制度等",{"key":27,"text":431,"correct":22},"负责审定项目重大的技术决策、四新应用",{"key":30,"text":433,"correct":32},"决定工程项目的新技术、新工艺、新结构、新材料和新设备应用",{"key":34,"text":435,"correct":22},"组织编制和实施质量计划和质量保证措施",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":52,"analysis":37},1263065,"施工准备制度中的技术准备包括( )。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"编制施工预算",{"key":24,"text":443,"correct":22},"编制施工组织设计",{"key":27,"text":445,"correct":22},"构筑物的定位",{"key":30,"text":447,"correct":32},"试配的技术准备",{"key":34,"text":449,"correct":22},"搭设必要的暂设工程",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":464,"analysis":37},1263066,"夯管锤的锤击力应根据( ),经过技术经济比较后确定,并应有一定的安全储备。",[454,456,458,460,462],{"key":20,"text":455,"correct":32},"管道材质",{"key":24,"text":457,"correct":22},"管径",{"key":27,"text":459,"correct":22},"钢管力学性能",{"key":30,"text":461,"correct":22},"管道长度",{"key":34,"text":463,"correct":22},"工程地质条件","BCDE",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":67,"analysis":37},1263067,"夯管施工不适用于( )土质。",[469,471,473,475,477],{"key":20,"text":470,"correct":22},"岩石",{"key":24,"text":472,"correct":32},"黏土",{"key":27,"text":474,"correct":22},"砾石",{"key":30,"text":476,"correct":22},"砂",{"key":34,"text":478,"correct":32},"粉土",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":36,"analysis":37},1263068,"定向钻施工管道的优点有( )。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"施工速度快",{"key":24,"text":486,"correct":22},"施工精度高",{"key":27,"text":488,"correct":22},"成本低",{"key":30,"text":490,"correct":32},"施工距离长",{"key":34,"text":492,"correct":32},"扰动小",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":296,"analysis":37},1263069,"不开槽施工技术的选择应根据( ),经技术经济比较后确定。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"工程设计要求",{"key":24,"text":500,"correct":22},"项目合同约定",{"key":27,"text":502,"correct":32},"施工技术水平",{"key":30,"text":504,"correct":22},"工程水文地质条件",{"key":34,"text":506,"correct":22},"周围环境和现场条件",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":82,"analysis":37},1263070,"市政工程常用的不开槽管道施工设备有( )。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"顶管机",{"key":24,"text":514,"correct":22},"盾构机",{"key":27,"text":516,"correct":22},"地表式水平定向钻机",{"key":30,"text":518,"correct":22},"夯管机",{"key":34,"text":520,"correct":32},"夯实机",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":211,"analysis":37},1263071,"龙门吊起重机的主要技术参数包括( )。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"起重量",{"key":24,"text":528,"correct":32},"运距",{"key":27,"text":530,"correct":22},"跨度",{"key":30,"text":532,"correct":22},"起升高度",{"key":34,"text":534,"correct":22},"工作速度",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":548,"analysis":37},1263072,"塔吊式起重机的轨距值是根据( )确定的。",[539,541,543,545,546],{"key":20,"text":540,"correct":22},"塔吊的整体稳定性",{"key":24,"text":542,"correct":32},"建筑物尺寸",{"key":27,"text":544,"correct":32},"施工工艺",{"key":30,"text":526,"correct":32},{"key":34,"text":547,"correct":22},"经济效果","AE",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":82,"analysis":37},1263073,"混凝土振捣器按传递振动方式可以分为( )。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"内部振动器",{"key":24,"text":556,"correct":22},"外部振动器",{"key":27,"text":558,"correct":22},"平板振动器",{"key":30,"text":560,"correct":22},"平台式振动器",{"key":34,"text":562,"correct":32},"电动振动器",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":268,"analysis":37},1263074,"强制式搅拌设备对骨料粒径有一定的要求,可拌制( )。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"干硬性混凝土",{"key":24,"text":570,"correct":22},"塑性混凝土",{"key":27,"text":572,"correct":32},"半塑性混凝土",{"key":30,"text":574,"correct":22},"砂浆",{"key":34,"text":576,"correct":32},"高强度混凝土",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":52,"analysis":37},1263075,"冲击钻机适用于以下( )介质。",[581,583,585,587,588],{"key":20,"text":582,"correct":22},"碎石土",{"key":24,"text":584,"correct":22},"砂土",{"key":27,"text":586,"correct":22},"黏性土",{"key":30,"text":478,"correct":32},{"key":34,"text":589,"correct":22},"风化岩层",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":602,"analysis":37},1263076,"循环钻机适用于( )。",[594,595,597,598,600],{"key":20,"text":586,"correct":22},{"key":24,"text":596,"correct":22},"砂类土",{"key":27,"text":478,"correct":32},{"key":30,"text":599,"correct":32},"淤泥质土",{"key":34,"text":601,"correct":32},"人工回填土","AB",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":617,"analysis":37},1263077,"轮胎式摊铺机的缺点有( )。",[607,609,611,613,615],{"key":20,"text":608,"correct":22},"驱动力矩较小",{"key":24,"text":610,"correct":32},"行驶速度低",{"key":27,"text":612,"correct":22},"对路面平整度的敏感性较强",{"key":30,"text":614,"correct":32},"不能很快地自行转移工地",{"key":34,"text":616,"correct":22},"料斗内材料多少的改变将影响后驱动轮胎的变形量","ACE",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":630,"analysis":37},1263078,"履带式摊铺机的缺点有( )。",[622,624,625,627,628],{"key":20,"text":623,"correct":32},"不能在较软的路基上进行摊铺作业",{"key":24,"text":610,"correct":22},{"key":27,"text":626,"correct":32},"不能有效保证摊铺平整度",{"key":30,"text":614,"correct":22},{"key":34,"text":629,"correct":22},"制造成本较高","BDE",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":36,"analysis":37},1263079,"摊铺机按用途可以分为( )。",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"沥青混合料摊铺机",{"key":24,"text":638,"correct":22},"多功能摊铺机",{"key":27,"text":640,"correct":22},"基层混合料摊铺机",{"key":30,"text":642,"correct":32},"履带式摊铺机",{"key":34,"text":644,"correct":32},"胎式摊铺机",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":52,"analysis":37},1263080,"装载机是施工现场作业效率较高的铲装机械,可用于( )。",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"产状散装物料",{"key":24,"text":652,"correct":22},"平整场地",{"key":27,"text":654,"correct":22},"短距离装运物料",{"key":30,"text":656,"correct":32},"开挖路堑",{"key":34,"text":658,"correct":22},"牵引",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":82,"analysis":37},1263081,"推土机按功率等级可以分为( )。",[663,665,667,669,671],{"key":20,"text":664,"correct":22},"超轻型",{"key":24,"text":666,"correct":22},"轻型",{"key":27,"text":668,"correct":22},"中型",{"key":30,"text":670,"correct":22},"大型",{"key":34,"text":672,"correct":32},"超大型",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":687,"analysis":37},1263082,"推土机按工作装置形式可以分为( )。",[677,679,681,683,685],{"key":20,"text":678,"correct":32},"履带式",{"key":24,"text":680,"correct":32},"轮胎式",{"key":27,"text":682,"correct":22},"直铲式",{"key":30,"text":684,"correct":22},"角铲式",{"key":34,"text":686,"correct":32},"专用型","CD",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":602,"analysis":37},1263083,"推土机按行走装置可以分为( )。",[692,693,694,695,697],{"key":20,"text":678,"correct":22},{"key":24,"text":680,"correct":22},{"key":27,"text":686,"correct":32},{"key":30,"text":696,"correct":32},"通用型",{"key":34,"text":666,"correct":32},{"id":699,"libraryId":5,"type":700,"typeLabel":701,"stem":702,"options":703,"answer":707,"analysis":37},1263084,3,"判断题","工程量清单计价的合同价款的调整方式包括变更签证和政策性调整等。",[704,706],{"key":20,"text":705,"correct":32},"正确",{"key":24,"text":707,"correct":22},"错误",{"id":709,"libraryId":5,"type":700,"typeLabel":701,"stem":710,"options":711,"answer":705,"analysis":37},1263085,"建筑工程施工资料管理软件启动后,软件接口分有三个区域。",[712,713],{"key":20,"text":705,"correct":22},{"key":24,"text":707,"correct":32},[715,719,722,725,728,731],{"id":716,"name":717,"category":7,"favorite":718},1,"领导干部任职前廉政法规知识测试题",92,{"id":720,"name":721,"category":7,"favorite":716},595,"建筑结构与设备",{"id":723,"name":724,"category":7,"favorite":716},715,"招标采购专业知识与法律法规",{"id":726,"name":727,"category":7,"favorite":716},848,"市政方向-通用基础",{"id":729,"name":730,"category":7,"favorite":8},534,"BIM工程师",{"id":732,"name":730,"category":7,"favorite":8},535]