[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-847-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},847,"市政方向-岗位技能","建筑工程",0,5,50,399,[13,38,53,67,82,97,111,125,139,154,168,182,197,211,225,239,254,264,278,292,307,321,335,344,358,372,384,398,410,424,438,452,466,481,495,510,524,538,553,567,581,595,609,624,638,652,666,680,694,708],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1262984,2,"多选题","工程施工资料管理软件主要基本功能和应用有( )。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","智能评定功能",true,{"key":24,"text":25,"correct":22},"B","自动计算功能",{"key":27,"text":28,"correct":29},"C","验收数据一次生成",false,{"key":31,"text":32,"correct":22},"D","填表实例功能",{"key":34,"text":35,"correct":22},"E","电子档案功能","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1262985,"项目管理软件应用的准备工作中,调查研究采用的主要方法有( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"实际观察",{"key":24,"text":45,"correct":29},"类比法",{"key":27,"text":47,"correct":22},"会议调查",{"key":31,"text":49,"correct":22},"查阅资料",{"key":34,"text":51,"correct":22},"分析预测","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1262986,"项目管理软件的主要模块有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"网络处理模块",{"key":24,"text":60,"correct":29},"进度跟踪模块",{"key":27,"text":62,"correct":22},"资源安排与优化模块",{"key":31,"text":64,"correct":22},"成本管理模块",{"key":34,"text":66,"correct":22},"报告生成及输出模块",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1262987,"项目信息管理的基本要求有( )。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"严格的时效性",{"key":24,"text":74,"correct":22},"必要的精度",{"key":27,"text":76,"correct":22},"合理的成本",{"key":31,"text":78,"correct":29},"明确的信息流程",{"key":34,"text":80,"correct":22},"针对性和实用性","ABCE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1262988,"涉及市政公用工程相关标准强制性条文的规范包括( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"《园林绿化工程施工及验收规范》CJJ82-2012",{"key":24,"text":89,"correct":22},"《城镇道路工程施工及验收规范》CJJ1-2008",{"key":27,"text":91,"correct":22},"《给水排水构筑物工程施工及验收规范》CB50141-2008",{"key":31,"text":93,"correct":22},"《给水排水管道工程施工及验收规范》GB50268-2008",{"key":34,"text":95,"correct":22},"《城镇供热管网工程施工及验收规范》CJJ28-2014","ABCDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":36,"analysis":37},1262989,"非正常验收的形式有( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"返工更换验收",{"key":24,"text":104,"correct":22},"检测鉴定验收",{"key":27,"text":106,"correct":29},"限制使用验收",{"key":31,"text":108,"correct":22},"设计复核验收",{"key":34,"text":110,"correct":22},"加固处理验收",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":52,"analysis":37},1262990,"建筑工程施工质量验收的基本要求有( )。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"工程质量的验收均应在施工单位自检合格的基础上进行",{"key":24,"text":118,"correct":29},"检验批的质量应按主控项目验收",{"key":27,"text":120,"correct":22},"对涉及结构安全的重要分部工程应在验收前进行抽样检测",{"key":31,"text":122,"correct":22},"隐蔽工程在隐蔽前应由施工单位通知有关单位进行验收",{"key":34,"text":124,"correct":22},"工程的观感质量应由验收人员现场检查",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":52,"analysis":37},1262992,"下列说法正确的有( )。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"生产经营单位应当对从业人员进行安全生产教育和培训",{"key":24,"text":132,"correct":29},"生产经营单位应多尝试新工艺、新技术",{"key":27,"text":134,"correct":22},"施工前应由项目管理技术人员对相关安全施工的技术要求作出详细说明",{"key":31,"text":136,"correct":22},"建筑施工企业应明确安全技术交底分级的原则",{"key":34,"text":138,"correct":22},"建筑施工企业应组织相关编制人员参与安全技术交底、验收和检查",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},1262993,"施工作业人员安全生产的义务有( )。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"自律遵规的义务",{"key":24,"text":146,"correct":29},"提出建议的义务",{"key":27,"text":148,"correct":22},"接受培训的义务",{"key":31,"text":150,"correct":22},"危险报告义务",{"key":34,"text":152,"correct":29},"保护公共财产的义务","ACD",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":81,"analysis":37},1262994,"施工作业人员安全生产的权利有( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"知情权",{"key":24,"text":161,"correct":22},"建议权",{"key":27,"text":163,"correct":22},"批评权",{"key":31,"text":165,"correct":29},"危险报告权",{"key":34,"text":167,"correct":22},"紧急避险权",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":36,"analysis":37},1262995,"工程量清单的编制依据有( )。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"建设工程设计文件",{"key":24,"text":175,"correct":22},"相关标准、规范",{"key":27,"text":177,"correct":29},"投标文件及其补充文件",{"key":31,"text":179,"correct":22},"施工现场情况",{"key":34,"text":181,"correct":22},"工程特点及常规施工方案",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":196,"analysis":37},1262996,"编制施工图预算时,为了准确地计算工程量,应遵循的原则有( )。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"计算口径要一致",{"key":24,"text":189,"correct":22},"计量单位要一致",{"key":27,"text":191,"correct":22},"严格执行定额中的工程量计算规格",{"key":31,"text":193,"correct":29},"编制施工图预算分析表",{"key":34,"text":195,"correct":29},"编制工料分析表","ABC",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":81,"analysis":37},1262997,"预算定额的作用有( )。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"是确定市政工程造价的基础",{"key":24,"text":204,"correct":22},"是编制施工组织设计的依据",{"key":27,"text":206,"correct":22},"是工程结算的依据",{"key":31,"text":208,"correct":29},"是施工单位进行经济活动分析的依据",{"key":34,"text":210,"correct":22},"是编制概算定额的基础",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":81,"analysis":37},1262998,"机械台班使用定额包括( )。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"准备和结束时间",{"key":24,"text":218,"correct":22},"基本工作时间",{"key":27,"text":220,"correct":22},"辅助工作时间",{"key":31,"text":222,"correct":29},"窝工时间",{"key":34,"text":224,"correct":22},"休息时间",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":81,"analysis":37},1262999,"市政工程造价的计价依据包括( )。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"计算设备和工程量依据",{"key":24,"text":232,"correct":22},"计算人工材料机械等实物消耗量依据",{"key":27,"text":234,"correct":22},"计算工程量单价的价格依据",{"key":31,"text":236,"correct":29},"计算直接费和工程建设其他费用的依据",{"key":34,"text":238,"correct":22},"政府规定的税费",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},1263000,"市政工程计价方法具有多样性特征。计算和确定投资估算造价的方法包括( )。",[243,245,247,249,251],{"key":20,"text":244,"correct":29},"单价法",{"key":24,"text":246,"correct":22},"设备系数法",{"key":27,"text":248,"correct":29},"实物法",{"key":31,"text":250,"correct":22},"资金周转法",{"key":34,"text":252,"correct":22},"系数估算法","BDE",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":263,"analysis":37},1263001,"市政工程计价方法具有多样性特征。计算和确定概、预算造价的方法包括( )。",[258,259,260,261,262],{"key":20,"text":244,"correct":22},{"key":24,"text":246,"correct":29},{"key":27,"text":248,"correct":22},{"key":31,"text":250,"correct":29},{"key":34,"text":252,"correct":29},"AC",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":153,"analysis":37},1263002,"市政工程造价主要具有的计价特征有( )。",[268,270,272,274,276],{"key":20,"text":269,"correct":22},"单件性计价",{"key":24,"text":271,"correct":29},"周期性计价",{"key":27,"text":273,"correct":22},"多次性计价",{"key":31,"text":275,"correct":22},"综合性计价",{"key":34,"text":277,"correct":29},"规模性计价",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":153,"analysis":37},1263003,"间接费的计算方法按取费基数的不同可以分为( )。",[282,284,286,288,290],{"key":20,"text":283,"correct":22},"以直接费为计算基础",{"key":24,"text":285,"correct":29},"以措施费为计算基础",{"key":27,"text":287,"correct":22},"以人工费为计算基础",{"key":31,"text":289,"correct":22},"以人工费和机械费合计为计算基础",{"key":34,"text":291,"correct":29},"以规费为计算基础",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":306,"analysis":37},1263004,"下列属于措施费的是( )。",[296,298,300,302,304],{"key":20,"text":297,"correct":22},"环境保护费",{"key":24,"text":299,"correct":22},"文明施工费",{"key":27,"text":301,"correct":22},"安全施工费",{"key":31,"text":303,"correct":22},"临时施工费",{"key":34,"text":305,"correct":29},"劳动保险费","ABCD",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":81,"analysis":37},1263005,"市政工程施工造价费用主要由( )组成。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"直接费",{"key":24,"text":314,"correct":22},"间接费",{"key":27,"text":316,"correct":22},"利润",{"key":31,"text":318,"correct":29},"分部分项工程费",{"key":34,"text":320,"correct":22},"税金",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":81,"analysis":37},1263006,"施工成本控制的措施有( )。",[325,327,329,331,333],{"key":20,"text":326,"correct":22},"组织措施",{"key":24,"text":328,"correct":22},"经济措施",{"key":27,"text":330,"correct":22},"技术措施",{"key":31,"text":332,"correct":29},"人员措施",{"key":34,"text":334,"correct":22},"合同措施",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":81,"analysis":37},1263007,"纠偏是施工成本控制中最具有实质性的步骤,纠偏可采用( )。",[339,340,341,342,343],{"key":20,"text":326,"correct":22},{"key":24,"text":328,"correct":22},{"key":27,"text":330,"correct":22},{"key":31,"text":332,"correct":29},{"key":34,"text":334,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":81,"analysis":37},1263008,"施工成本控制的原则包括( )。",[348,350,352,354,356],{"key":20,"text":349,"correct":22},"成本最低化原则",{"key":24,"text":351,"correct":22},"全面成本控制原则",{"key":27,"text":353,"correct":22},"动态控制原则",{"key":31,"text":355,"correct":29},"项目负责人负责原则",{"key":34,"text":357,"correct":22},"目标管理原则",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":81,"analysis":37},1263009,"施工成本控制的依据包括( )。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"工程承包合同",{"key":24,"text":365,"correct":22},"施工成本计划",{"key":27,"text":367,"correct":22},"进度和施工统计报告",{"key":31,"text":369,"correct":29},"施工工艺",{"key":34,"text":371,"correct":22},"工程变更",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":383,"analysis":37},1263010,"工程量清单计价应按招标文件或施工合同规定,完成工程量清单所列项目的全部费用,包括( )。",[376,377,378,380,382],{"key":20,"text":312,"correct":29},{"key":24,"text":314,"correct":29},{"key":27,"text":379,"correct":22},"措施项目费",{"key":31,"text":381,"correct":22},"其他项目费",{"key":34,"text":320,"correct":22},"CDE",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":196,"analysis":37},1263011,"施工项目直接成本中的其他直接费包括( )。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"临时设施费",{"key":24,"text":391,"correct":22},"检测试验费",{"key":27,"text":393,"correct":22},"二次搬运费",{"key":31,"text":395,"correct":29},"工程排污费",{"key":34,"text":397,"correct":29},"社会保障费",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":196,"analysis":37},1263012,"施工项目成本中的直接成本包括( )。",[402,404,406,408,409],{"key":20,"text":403,"correct":22},"人工费",{"key":24,"text":405,"correct":22},"材料费",{"key":27,"text":407,"correct":22},"机械使用费",{"key":31,"text":395,"correct":29},{"key":34,"text":320,"correct":29},{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":423,"analysis":37},1263013,"施工项目成本是指在工程项目的施工过程中所发生的全部生产费用的总和,主要由( )构成。",[414,416,418,420,421],{"key":20,"text":415,"correct":22},"直接成本",{"key":24,"text":417,"correct":22},"间接成本",{"key":27,"text":419,"correct":29},"规费",{"key":31,"text":320,"correct":22},{"key":34,"text":422,"correct":29},"总成本","ABD",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":306,"analysis":37},1263014,"施工现场的进口处的内侧应设置整齐明显的“五牌一图”,五牌指( )。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"工程概况牌",{"key":24,"text":431,"correct":22},"项目主要管理人员名单牌",{"key":27,"text":433,"correct":22},"安全生产纪律牌",{"key":31,"text":435,"correct":22},"防火安全须知牌",{"key":34,"text":437,"correct":29},"投诉电话牌",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":36,"analysis":37},1263015,"施工现场必须设置文明施工铭牌,其内容一般包括( )。",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"工程名称",{"key":24,"text":445,"correct":22},"施工范围",{"key":27,"text":447,"correct":29},"企业法人",{"key":31,"text":449,"correct":22},"建设单位",{"key":34,"text":451,"correct":22},"竣工日期",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":306,"analysis":37},1263016,"造成安全事故的主要原因有( )。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"施工环境的影响",{"key":24,"text":459,"correct":22},"施工人员操作行为的影响",{"key":27,"text":461,"correct":22},"缺乏有效管理",{"key":31,"text":463,"correct":22},"机械设备维护不当",{"key":34,"text":465,"correct":29},"施工难度大",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":480,"analysis":37},1263017,"安全管理检查评分中的一般项目包括( )。",[470,472,474,476,478],{"key":20,"text":471,"correct":22},"分包单位安全管理",{"key":24,"text":473,"correct":29},"应急救援",{"key":27,"text":475,"correct":29},"安全检查",{"key":31,"text":477,"correct":22},"生产安全事故处理",{"key":34,"text":479,"correct":22},"安全标志","ADE",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":52,"analysis":37},1263018,"项目部安全检查的形式有( )。",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"定期检查",{"key":24,"text":488,"correct":29},"不定期检查",{"key":27,"text":490,"correct":22},"日常性检查",{"key":31,"text":492,"correct":22},"专项检查",{"key":34,"text":494,"correct":22},"季节性检查",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":509,"analysis":37},1263019,"现场施工安全管理制度主要包括( )。",[499,501,503,505,507],{"key":20,"text":500,"correct":29},"安全生产安全保证制度",{"key":24,"text":502,"correct":22},"安全生产资金保障制度",{"key":27,"text":504,"correct":22},"安全生产值班制度",{"key":31,"text":506,"correct":22},"安全生产例会制度",{"key":34,"text":508,"correct":22},"安全生产检查制度","BCDE",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":306,"analysis":37},1263020,"安全教育与培训的主要形式有( )。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"三级安全教育",{"key":24,"text":517,"correct":22},"专场安全教育",{"key":27,"text":519,"correct":22},"变换工种安全教育",{"key":31,"text":521,"correct":22},"特种作业安全教育",{"key":34,"text":523,"correct":29},"持证上岗安全教育",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":153,"analysis":37},1263021,"大模板施工时,应当遵守的安全规定有( )。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"大模板放置时,堆放场地应事先进行平整和硬化处理",{"key":24,"text":531,"correct":29},"模板的叠放和运输时,垫木应上下错开,绑扎牢固",{"key":27,"text":533,"correct":22},"模板运输时车上严禁坐人",{"key":31,"text":535,"correct":22},"大模板应设操作平台",{"key":34,"text":537,"correct":29},"当风力5级时,不允许吊装作业",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":552,"analysis":37},1263022,"下列关于模板工程的说法中正确的有( )。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"模板或成材的堆垛高一般不高于1.8m",{"key":24,"text":545,"correct":22},"场地的设置应避开高压线路",{"key":27,"text":547,"correct":29},"模板施工前项目技术负责人应向有关作业人员进行安全交底",{"key":31,"text":549,"correct":29},"在支架模板上施工作业时严禁堆放物品",{"key":34,"text":551,"correct":22},"雨期施工时的高耸结构的模板作业要安装避雷设施","ABE",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":81,"analysis":37},1263023,"在脚手架使用过程中,应定期对脚手架及其地基基础进行检查和维护。特别是下列情况下,必须进行检查( )。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"作业层上施工加荷载前",{"key":24,"text":560,"correct":22},"遇大雨或六级大风后",{"key":27,"text":562,"correct":22},"寒冷地区开冻后",{"key":31,"text":564,"correct":29},"停用时间超过三个月",{"key":34,"text":566,"correct":22},"有倾斜、下沉等现场时",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":36,"analysis":37},1263024,"下列关于脚手架用钢管的说法中正确的有( )。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"脚手架用钢管应采用外径不小于48mm的钢管",{"key":24,"text":574,"correct":22},"钢管的壁厚不小于3.5mm",{"key":27,"text":576,"correct":29},"必须选用无锈蚀的钢管",{"key":31,"text":578,"correct":22},"钢管不允许有裂纹",{"key":34,"text":580,"correct":22},"施工前必须涂防锈漆",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":52,"analysis":37},1263025,"场地属性的不安全状态包括( )。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"现场周边围挡防护",{"key":24,"text":588,"correct":29},"临时建筑",{"key":27,"text":590,"correct":22},"现场场地和障碍物",{"key":31,"text":592,"correct":22},"临建和施工设施",{"key":34,"text":594,"correct":22},"洞口和临边防护设施",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":81,"analysis":37},1263026,"市政工程施工安全方面所说的“五临边”是指( )。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"基坑四周临边",{"key":24,"text":602,"correct":22},"墩台临边",{"key":27,"text":604,"correct":22},"桥面板临边",{"key":31,"text":606,"correct":29},"脚手架临边",{"key":34,"text":608,"correct":22},"构筑物平台临边",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":623,"analysis":37},1263027,"脚手架工程包括( )。",[613,615,617,619,621],{"key":20,"text":614,"correct":29},"搭设高度在10m以上的落地式脚手架",{"key":24,"text":616,"correct":22},"搭设高度在20m以上的落地式脚手架",{"key":27,"text":618,"correct":22},"悬挑脚手架",{"key":31,"text":620,"correct":29},"高度在6.5m以上的满堂红脚手架",{"key":34,"text":622,"correct":22},"附着式整体提升脚手架","BCE",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":306,"analysis":37},1263028,"市政施工的“五大伤害”包括( )。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"高空坠落事故",{"key":24,"text":631,"correct":22},"触电伤害事故",{"key":27,"text":633,"correct":22},"物体打击事故",{"key":31,"text":635,"correct":22},"机械伤害事故",{"key":34,"text":637,"correct":29},"中毒",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":81,"analysis":37},1263029,"施工质量事故处理时,一般可不作专门处理的情况有( )。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"不影响结构安全、生产工艺和使用要求的",{"key":24,"text":645,"correct":22},"下道分项工程可以弥补的质量缺陷",{"key":27,"text":647,"correct":22},"法定检测单位鉴定合格的",{"key":31,"text":649,"correct":29},"经过建设单位检查后同意的",{"key":34,"text":651,"correct":22},"构筑物出现的质量缺陷,经检测鉴定达不到设计要求,但经原设计单位核算仍能满足结构安全和使用功能的",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":81,"analysis":37},1263030,"对混凝土结构常用加固的方法有( )。",[656,658,660,662,664],{"key":20,"text":657,"correct":22},"增大截面加固法",{"key":24,"text":659,"correct":22},"外包型钢加固法",{"key":27,"text":661,"correct":22},"粘钢加固法",{"key":31,"text":663,"correct":29},"置换混凝土法",{"key":34,"text":665,"correct":22},"预应力加固法",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":81,"analysis":37},1263031,"施工质量事故处理的基本方法有( )。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"修补处理",{"key":24,"text":673,"correct":22},"加固处理",{"key":27,"text":675,"correct":22},"返工处理",{"key":31,"text":677,"correct":29},"限期整改",{"key":34,"text":679,"correct":22},"报废处理",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":509,"analysis":37},1263032,"施工质量事故处理的基本要求有( )。",[684,686,688,690,692],{"key":20,"text":685,"correct":29},"质量事故的处理应以经济合理为主要目的",{"key":24,"text":687,"correct":22},"重视消除造成事故的原因,注意综合治理",{"key":27,"text":689,"correct":22},"正确确定处理的范围",{"key":31,"text":691,"correct":22},"加强事故处理的检查验收工作",{"key":34,"text":693,"correct":22},"确保事故处理期间的安全",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":81,"analysis":37},1263033,"施工质量事故发生的原因有( )。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"技术原因",{"key":24,"text":701,"correct":22},"人为事故",{"key":27,"text":703,"correct":22},"自然灾害原因",{"key":31,"text":705,"correct":29},"管理原因",{"key":34,"text":707,"correct":22},"偶然事故",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":52,"analysis":37},1263034,"以下说法正确的是( )。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"进场的水泥应按要求进行强度和安定性的复验",{"key":24,"text":715,"correct":29},"预应力钢筋超张拉的目的是为了加速钢筋松弛的早发展,减少钢筋松弛的应力损失",{"key":27,"text":717,"correct":22},"冷拉钢筋,一定要先对焊后冷拉",{"key":31,"text":719,"correct":22},"蜂窝、麻面、渗水等都与工艺操作有关",{"key":34,"text":721,"correct":22},"砖墙砌筑后,一定要有6-10d时间让墙体充分沉陷、稳定、干燥,然后才能抹面",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]