[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-847-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":585},{"id":5,"name":6,"category":7,"favorite":8},847,"市政方向-岗位技能","建筑工程",0,4,50,399,[13,34,46,55,67,79,89,101,113,125,137,149,161,173,181,189,201,213,225,237,249,261,273,283,291,303,315,324,335,344,356,368,379,391,403,413,425,436,448,460,472,484,496,508,518,526,536,547,557,567],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1262934,1,"单选题","劳动力配置计划是施工现场平衡、调配劳动力的依据,是根据施工方案和( )进行编制的。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","施工进度计划",true,{"key":24,"text":25,"correct":26},"B","招投标文件",false,{"key":28,"text":29,"correct":26},"C","工程设计文件",{"key":31,"text":32,"correct":26},"D","工程项目工料分析","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1262935,"图纸会审应由( )组织有关单位参加。",[38,40,42,44],{"key":20,"text":39,"correct":26},"施工项目部",{"key":24,"text":41,"correct":22},"建设单位",{"key":28,"text":43,"correct":26},"施工项目技术负责人",{"key":31,"text":45,"correct":26},"企业技术负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1262936,"图纸会审的初审应由( )组织有关人员参加。",[50,51,53,54],{"key":20,"text":39,"correct":22},{"key":24,"text":52,"correct":26},"项目经理",{"key":28,"text":41,"correct":26},{"key":31,"text":45,"correct":26},{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":20,"analysis":33},1262937,"图纸会审的主要内容不包括( )。",[59,61,63,65],{"key":20,"text":60,"correct":22},"设计单位相关资质",{"key":24,"text":62,"correct":26},"设计是否符合国家有关技术规范的规定",{"key":28,"text":64,"correct":26},"设计图纸及设计说明是否齐全、完整、清楚",{"key":31,"text":66,"correct":26},"图纸前后内容是否一致",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1262938,"项目技术负责人岗位责任不包括( )。",[71,73,75,77],{"key":20,"text":72,"correct":26},"负责项目技术管理和质量控制工作",{"key":24,"text":74,"correct":26},"贯彻执行相关技术标准、验收规范和技术管理制度等",{"key":28,"text":76,"correct":26},"负责审定项目重大的技术决策、四新应用",{"key":31,"text":78,"correct":22},"决定工程项目的新技术、新工艺、新结构、新材料和新设备应用",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},1262939,"项目部根据项目实际需要制订技术管理制度,上报( )批准后执行。",[83,84,85,87],{"key":20,"text":45,"correct":22},{"key":24,"text":52,"correct":26},{"key":28,"text":86,"correct":26},"项目技术负责人",{"key":31,"text":88,"correct":26},"技术质量管理部门负责人",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":24,"analysis":33},1262940,"夯管施工时,穿越管道直径宜为( )。",[93,95,97,99],{"key":20,"text":94,"correct":26},"Ф100-Ф1600",{"key":24,"text":96,"correct":22},"Ф219-Ф1600",{"key":28,"text":98,"correct":26},"Ф100-Ф1000",{"key":31,"text":100,"correct":26},"Ф219-Ф1000",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":31,"analysis":33},1262941,"下列选项中,关于施工设备、装置应符合的规定,说法错误的是( )。",[105,107,109,111],{"key":20,"text":106,"correct":26},"施工设备、主要配套设备和辅助系统安装完成后,应经试运行及安全性检验,合格后方可掘进作业",{"key":24,"text":108,"correct":26},"管（隧）道内涉及的水平运输设备、注浆系统、喷浆系统以及其他辅助系统应满足施工技术要求和安全、文明施工要求",{"key":28,"text":110,"correct":26},"施工供电应设置双路电源,并能自动切换",{"key":31,"text":112,"correct":22},"动力、照明应分路供电,作业面移动照明应采用高压供电",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},1262942,"夯管施工时,穿越管线长度宜为( )m。",[117,119,121,123],{"key":20,"text":118,"correct":26},"10-70",{"key":24,"text":120,"correct":22},"20-80",{"key":28,"text":122,"correct":26},"10-80",{"key":31,"text":124,"correct":26},"20-70",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},1262943,"夯管法在特定场所有其优越性,适用于( )施工。",[129,131,133,135],{"key":20,"text":130,"correct":26},"建筑物密集",{"key":24,"text":132,"correct":26},"土质较差",{"key":28,"text":134,"correct":26},"埋深较大的地下管道",{"key":31,"text":136,"correct":22},"城镇区域下穿较窄道路的地下管道",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":31,"analysis":33},1262944,"下列选项中,不属于盾构机按照工作原理分类的是( )。",[141,143,145,147],{"key":20,"text":142,"correct":26},"手掘式盾构",{"key":24,"text":144,"correct":26},"挤压式盾构",{"key":28,"text":146,"correct":26},"机械式盾构",{"key":31,"text":148,"correct":22},"密闭式盾构",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":28,"analysis":33},1262945,"在土质条件较好、地表沉降要求不高、无须降水或有条件将地下水位降至管道外底面以下不小于( )m处时,可选用敞口式顶管机。",[153,155,157,159],{"key":20,"text":154,"correct":26},"0.3",{"key":24,"text":156,"correct":26},"0.4",{"key":28,"text":158,"correct":22},"0.5",{"key":31,"text":160,"correct":26},"0.6",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":28,"analysis":33},1262946,"下列不开槽管道施工方法中,不适用于砂卵石及含水地层的是( )。",[165,167,169,171],{"key":20,"text":166,"correct":26},"密闭式顶管法",{"key":24,"text":168,"correct":26},"盾构法",{"key":28,"text":170,"correct":22},"定向钻法",{"key":31,"text":172,"correct":26},"夯管法",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1262947,"下列不开槽管道施工方法中,施工速度相对较慢的是( )。",[177,178,179,180],{"key":20,"text":166,"correct":22},{"key":24,"text":168,"correct":26},{"key":28,"text":170,"correct":26},{"key":31,"text":172,"correct":26},{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":20,"analysis":33},1262948,"当施工精度要求较高时,应采用的不开槽管道施工方法是( )。",[185,186,187,188],{"key":20,"text":166,"correct":22},{"key":24,"text":168,"correct":26},{"key":28,"text":170,"correct":26},{"key":31,"text":172,"correct":26},{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},1262949,"吊具最高和最低工作位置之间的垂直距离称为( )。",[193,195,197,199],{"key":20,"text":194,"correct":26},"起升高度",{"key":24,"text":196,"correct":26},"下降深度",{"key":28,"text":198,"correct":22},"起升范围",{"key":31,"text":200,"correct":26},"跨度",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1262950,"在无载荷情况下,塔身与地面的垂直度偏差不得超过( )。",[205,207,209,211],{"key":20,"text":206,"correct":26},"1\u002F1000",{"key":24,"text":208,"correct":26},"2\u002F1000",{"key":28,"text":210,"correct":26},"3\u002F1000",{"key":31,"text":212,"correct":22},"4\u002F1000",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1262951,"塔吊拆装时,风力达到( )级以上不得进行顶升作业。",[217,219,221,223],{"key":20,"text":218,"correct":26},"三",{"key":24,"text":220,"correct":22},"四",{"key":28,"text":222,"correct":26},"五",{"key":31,"text":224,"correct":26},"六",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},1262952,"塔吊式起重机的基本参数中的主要参数是( )。",[229,231,233,235],{"key":20,"text":230,"correct":22},"起重力矩",{"key":24,"text":232,"correct":26},"起重量",{"key":28,"text":234,"correct":26},"最大起重量",{"key":31,"text":236,"correct":26},"工作幅度",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1262953,"市政工程常用的是( )履带起重机。",[241,243,245,247],{"key":20,"text":242,"correct":26},"机械式",{"key":24,"text":244,"correct":22},"液压式",{"key":28,"text":246,"correct":26},"电动式",{"key":31,"text":248,"correct":26},"固定式",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},1262954,"下列选项中,不属于混凝土振捣器按工作部分的结构特征分类的是( )。",[253,255,257,259],{"key":20,"text":254,"correct":26},"锥形振捣器",{"key":24,"text":256,"correct":26},"棒形振捣器",{"key":28,"text":258,"correct":26},"片形振捣器",{"key":31,"text":260,"correct":22},"圆形振捣器",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1262955,"搅拌站上使用较多的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":26},"自落式搅拌机",{"key":24,"text":268,"correct":22},"固定式搅拌机",{"key":28,"text":270,"correct":26},"移动式搅拌机",{"key":31,"text":272,"correct":26},"强制式搅拌机",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1262956,"拌制干硬性混凝土最好采用( )。",[277,279,281,282],{"key":20,"text":278,"correct":26},"周期性搅拌机",{"key":24,"text":280,"correct":26},"连续式搅拌机",{"key":28,"text":266,"correct":26},{"key":31,"text":272,"correct":22},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},1262957,"为了更容易地控制配合比及拌合质量,常采用( )。",[287,288,289,290],{"key":20,"text":278,"correct":22},{"key":24,"text":280,"correct":26},{"key":28,"text":266,"correct":26},{"key":31,"text":272,"correct":26},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1262958,"市政工程使用最多的为( )水泥混凝土搅拌设备。",[295,297,299,301],{"key":20,"text":296,"correct":26},"移动式",{"key":24,"text":298,"correct":26},"周期作业式",{"key":28,"text":300,"correct":26},"自落式",{"key":31,"text":302,"correct":22},"强制式",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1262959,"冲击钻机不适用于以下( )介质。",[307,309,311,313],{"key":20,"text":308,"correct":26},"碎石土",{"key":24,"text":310,"correct":26},"砂土",{"key":28,"text":312,"correct":26},"黏性土",{"key":31,"text":314,"correct":22},"粉土",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":31,"analysis":33},1262960,"长螺旋钻机不适用于以下( )介质。",[319,320,321,323],{"key":20,"text":312,"correct":26},{"key":24,"text":310,"correct":26},{"key":28,"text":322,"correct":26},"碎石类土",{"key":31,"text":314,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":28,"analysis":33},1262961,"旋挖钻机不适用于以下哪种介质( )。",[328,330,331,333],{"key":20,"text":329,"correct":26},"黏土",{"key":24,"text":314,"correct":26},{"key":28,"text":332,"correct":22},"卵石土",{"key":31,"text":334,"correct":26},"淤泥质土",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},1262962,"循环钻机不适用于以下哪种介质( )。",[339,340,342,343],{"key":20,"text":312,"correct":26},{"key":24,"text":341,"correct":26},"砂类土",{"key":28,"text":332,"correct":26},{"key":31,"text":334,"correct":22},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1262963,"基础压实作业,振动轮的宽度和直径应选取( )的数值。",[348,350,352,354],{"key":20,"text":349,"correct":26},"较大",{"key":24,"text":351,"correct":26},"适中",{"key":28,"text":353,"correct":26},"较小",{"key":31,"text":355,"correct":22},"最小",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1262964,"一台优良的振动压路机是不能随意提高其( )的。",[360,362,364,366],{"key":20,"text":361,"correct":26},"振动频率",{"key":24,"text":363,"correct":26},"振幅",{"key":28,"text":365,"correct":22},"激振力",{"key":31,"text":367,"correct":26},"振动轮的宽度和直径",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1262965,"下列选项中,不属于压路机的主要技术参数的是( )。",[372,374,376,377],{"key":20,"text":373,"correct":26},"工作质量",{"key":24,"text":375,"correct":26},"压路机质量的分配",{"key":28,"text":361,"correct":26},{"key":31,"text":378,"correct":22},"振动轮质量",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},1262966,"下列选项中,不属于振动压路机的是( )。",[383,385,387,389],{"key":20,"text":384,"correct":26},"组合式振动压路机",{"key":24,"text":386,"correct":26},"手扶式振动压路机",{"key":28,"text":388,"correct":22},"自行式振动压路机",{"key":31,"text":390,"correct":26},"拖式振动压路机",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1262967,"下列选项中,不属于轮胎式摊铺机的优点的是( )。",[395,397,399,401],{"key":20,"text":396,"correct":26},"结构简单,造价较低",{"key":24,"text":398,"correct":26},"可自行驶转移工地",{"key":28,"text":400,"correct":26},"机动性和操作性能好",{"key":31,"text":402,"correct":22},"能有效保证摊铺平整度",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1262968,"下列选项中,不属于履带式摊铺机的优点的是( )。",[407,409,411,412],{"key":20,"text":408,"correct":26},"可在较软的路基上进行摊铺作业",{"key":24,"text":410,"correct":26},"对路基的平整度不太敏感",{"key":28,"text":402,"correct":26},{"key":31,"text":398,"correct":22},{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1262969,"下列选项中,不属于摊铺机按用途分类的是( )。",[417,419,421,423],{"key":20,"text":418,"correct":26},"沥青混合料摊铺机",{"key":24,"text":420,"correct":26},"多功能摊铺机",{"key":28,"text":422,"correct":26},"基层混合料摊铺机",{"key":31,"text":424,"correct":22},"履带式摊铺机",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1262970,"下列选项中,不属于摊铺机按施工能力进行分类的是( )。",[429,430,432,434],{"key":20,"text":420,"correct":22},{"key":24,"text":431,"correct":26},"大型摊铺机",{"key":28,"text":433,"correct":26},"中型摊铺机",{"key":31,"text":435,"correct":26},"小型摊铺机",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},1262971,"可以用于牵引其他机械的机械是( )。",[440,442,444,446],{"key":20,"text":441,"correct":26},"推土机",{"key":24,"text":443,"correct":26},"铲运机",{"key":28,"text":445,"correct":26},"挖掘机",{"key":31,"text":447,"correct":22},"装载机",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},1262972,"下列选项中,不属于挖掘机按技术性能分类的是( )。",[452,454,456,458],{"key":20,"text":453,"correct":26},"正铲挖掘机",{"key":24,"text":455,"correct":22},"反铲挖掘机",{"key":28,"text":457,"correct":26},"单斗液压反铲挖掘机",{"key":31,"text":459,"correct":26},"拉铲挖掘机",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},1262973,"铲运机的经济作业距离一般为( )m。",[464,466,468,470],{"key":20,"text":465,"correct":26},"50-100",{"key":24,"text":467,"correct":26},"100-500",{"key":28,"text":469,"correct":26},"50-1000",{"key":31,"text":471,"correct":22},"100-2500",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},1262974,"4-14m³铲斗容积的是( )铲运机。",[476,478,480,482],{"key":20,"text":477,"correct":26},"小型",{"key":24,"text":479,"correct":22},"中型",{"key":28,"text":481,"correct":26},"大型",{"key":31,"text":483,"correct":26},"特大型",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},1262975,"推土机的主要技术性能不包括( )。",[488,490,492,494],{"key":20,"text":489,"correct":26},"发动机的额定功率",{"key":24,"text":491,"correct":22},"铲刀体积",{"key":28,"text":493,"correct":26},"最大牵引力",{"key":31,"text":495,"correct":26},"铲刀宽度",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":20,"analysis":33},1262976,"下列选项中,不属于推土机按传动方式分类的是( )。",[500,502,504,506],{"key":20,"text":501,"correct":22},"履带传动式",{"key":24,"text":503,"correct":26},"机械传动式",{"key":28,"text":505,"correct":26},"液力机械传动式",{"key":31,"text":507,"correct":26},"全液压传动式",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},1262977,"用于大型露天矿或大型水电工程的是( )推土机。",[512,513,514,516],{"key":20,"text":481,"correct":26},{"key":24,"text":483,"correct":22},{"key":28,"text":515,"correct":26},"通用型",{"key":31,"text":517,"correct":26},"专用型",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1262978,"坚硬土或深度冻土的大型土方工程应采用( )推土机。",[522,523,524,525],{"key":20,"text":481,"correct":22},{"key":24,"text":483,"correct":26},{"key":28,"text":515,"correct":26},{"key":31,"text":517,"correct":26},{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1262979,"湿地或沼泽地施工作业时应选用( )推土机。",[530,532,534,535],{"key":20,"text":531,"correct":26},"直铲式",{"key":24,"text":533,"correct":26},"角铲式",{"key":28,"text":515,"correct":26},{"key":31,"text":517,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1262980,"适用于大功率推土机进行大型土方作业的是( )推土机。",[540,541,543,545],{"key":20,"text":517,"correct":26},{"key":24,"text":542,"correct":22},"全液压传动",{"key":28,"text":544,"correct":26},"机械传动",{"key":31,"text":546,"correct":26},"液力机械传动",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1262981,"当在施工条件较差的地带作业时,应选用( )推土机。",[551,553,555,556],{"key":20,"text":552,"correct":22},"履带式",{"key":24,"text":554,"correct":26},"轮胎式",{"key":28,"text":517,"correct":26},{"key":31,"text":515,"correct":26},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1262982,"推土机主要用于( )m距离的推运土方、石渣等作业。",[561,562,563,565],{"key":20,"text":465,"correct":22},{"key":24,"text":467,"correct":26},{"key":28,"text":564,"correct":26},"500-1000",{"key":31,"text":566,"correct":26},"1000-2500",{"id":568,"libraryId":5,"type":569,"typeLabel":570,"stem":571,"options":572,"answer":584,"analysis":33},1262983,2,"多选题","工程量清单计价的特点有( )。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"满足竞争的需要",{"key":24,"text":576,"correct":22},"竞争条件平等",{"key":28,"text":578,"correct":22},"有利于工程款的拨付",{"key":31,"text":580,"correct":26},"有利于避免风险",{"key":582,"text":583,"correct":22},"E","有利于建设单位对投资的控制","ABCE",[586,589,592,595,598,601],{"id":15,"name":587,"category":7,"favorite":588},"领导干部任职前廉政法规知识测试题",92,{"id":590,"name":591,"category":7,"favorite":15},595,"建筑结构与设备",{"id":593,"name":594,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":596,"name":597,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":599,"name":600,"category":7,"favorite":8},534,"BIM工程师",{"id":602,"name":600,"category":7,"favorite":8},535]