[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263095":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1263095,847,3,"判断题","市政工程施工质量验收应在施工单位自检基础上,按照检验批、分项工程、分部工程、单位工程依次进行。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"市政方向-岗位技能","建筑工程",0]