[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263069":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263069,847,2,"多选题","不开槽施工技术的选择应根据( ),经技术经济比较后确定。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工程设计要求",true,{"key":16,"text":17,"correct":14},"B","项目合同约定",{"key":19,"text":20,"correct":21},"C","施工技术水平",false,{"key":23,"text":24,"correct":14},"D","工程水文地质条件",{"key":26,"text":27,"correct":14},"E","周围环境和现场条件","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]