[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263061":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263061,847,2,"多选题","施工组织设计的主要作用有( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","确定施工可能性和经济合理性,对工厂施工全过程作全局性部署和安排",true,{"key":16,"text":17,"correct":14},"B","合理布置施工现场平面,建立合理的施工顺序,保证施工有序地实施",{"key":19,"text":20,"correct":14},"C","制定合理的施工方案,确定施工方法、劳动组织和技术经济措施",{"key":22,"text":23,"correct":24},"D","根据施工特点确定最节约的施工方案和合理的施工顺序",false,{"key":26,"text":27,"correct":14},"E","分析工程项目的特点、难点,制订有效的技术措施","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]