[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263010":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263010,847,2,"多选题","工程量清单计价应按招标文件或施工合同规定,完成工程量清单所列项目的全部费用,包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","直接费",false,{"key":16,"text":17,"correct":14},"B","间接费",{"key":19,"text":20,"correct":21},"C","措施项目费",true,{"key":23,"text":24,"correct":21},"D","其他项目费",{"key":26,"text":27,"correct":21},"E","税金","CDE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]