[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1263009":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1263009,847,2,"多选题","施工成本控制的依据包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程承包合同",true,{"key":16,"text":17,"correct":14},"B","施工成本计划",{"key":19,"text":20,"correct":14},"C","进度和施工统计报告",{"key":22,"text":23,"correct":24},"D","施工工艺",false,{"key":26,"text":27,"correct":14},"E","工程变更","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]