[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1262998":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1262998,847,2,"多选题","机械台班使用定额包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","准备和结束时间",true,{"key":16,"text":17,"correct":14},"B","基本工作时间",{"key":19,"text":20,"correct":14},"C","辅助工作时间",{"key":22,"text":23,"correct":24},"D","窝工时间",false,{"key":26,"text":27,"correct":14},"E","休息时间","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"市政方向-岗位技能","建筑工程",0]